Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00520
StatusFinaled
Name AMYX SIGNATURE HOMES
Site Address 12599 W SCOTFIELD ST
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a new 3970s.f. 2-story, 6-bedroom single family dwelling with 2580s.f. on the main level; 1390s.f. on the upper level; an attached 840s.f. 3-car garage and 240s.f. of covered concrete patio. Zoned R-1B and setbacks and is solar protected and shade restricted. per rhj. All per the approved plans as marked and attached conditions. PC#0155 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/9/20018/10/20018/10/2001APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 08/09/2001 at 14:11:42. Contact: ###-####.
DOC - Permit Finaled8/10/20018/10/20018/10/2001APASS
DetailsJim Sly
Added by Inspector: 316 On 8/10/2001 10:38:08 AM
BLD-Aging Inspection7/10/20017/10/20017/10/2001 PART
DetailsJim Sly
WIP 7/10/2001 10:46:32 AM
BLD-Energy code compliance5/9/20015/10/20015/10/2001APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/09/2001 at 13:37:32. Contact: ###-####.
BLD-Framing/Rough-in5/2/20015/3/20015/3/2001AFAIL
DetailsJim Sly
Scheduled by a contractor via Hello! on 05/02/2001 at 14:53:56. Contact: ###-####. C/N on site. 5/3/2001 11:42:45 AM
BLD-Framing/Rough-in4/23/20014/23/20014/23/2001PPASS
DetailsDave Hannah
shear wall todd ###-#### 4/23/2001 2:24:26 PM ok to cover e 4/23/2001 3:08:02 PM xt only 4/23/2001 3:08:10 PM
BLD-Footing3/13/20013/13/20013/13/2001PPASS
DetailsJim Sly
###-####
Pending Assignment by DJO3/2/2001 3/8/2001 DONE
DetailsDan Overy
3/8/2001 07:24:14 PEP - activity updated through activity BLDA176 from case BLD01-00520.
Plan assigned to (PEP)3/8/2001 3/8/2001 PASS
DetailsPerry Paine
3/8/2001 08:44:47 PEP - activity updated through activity BLDA022 from case BLD01-00520.
Inspector's copy Bld permit  3/8/2001 DONE
Plan Review Report  3/8/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  3/8/2001 DONE
Inspection Record Card- Bld  3/8/2001 DONE
Telephone call  3/8/2001 DONE
talked to troy to verify plans are ready
Issue PAID IN FULL permit  3/8/2001 DONE
Routing - PUBLIC WORKS3/2/20013/2/20013/7/2001 PASS
Routing - PLANNING3/2/20013/2/20013/6/2001 PASS
Need copy of record of Survey (recorded copy) and copy of new deed recorded with one legal making this one legal lot. Called Todd Amyx. He will bring copy of recorded deed and survey and adjust plans to show lot line removed.
Application received  3/2/2001  
came in 3/1/2001/ 9:30 a.maddressed 3/2/2001 11 a.m /pe
Routing - PLAN CHECK3/7/20013/7/2001  PEND