Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00531
StatusFinaled
Name QUINN ROBBINS CO INC
Site Address 1689 W SHORELINE Unit: DR
Project NameRIVER WALK APARTMENTS
Customer Number 
ePlanReviewNo
Description
River Walk Apartments * (Section 1 of 3) Two hour area separation walls will be constructed to divide this apartment builing into separate buildings. Section #1 is three stories, 33 units, above the three hour occupancy separation per UBC Section 311.2.2.1. The first floor is 9.837 sq.ft., the second is 9,837 sq.ft., the third floor is 9,837 sq.ft. with 1,500 sq.ft. for mezzanines. NOTE: This building is fire sprinklered with a NFPA 13-R system, with an approved alternate for installation of sprinkler heads at each side of area separation wall to replace doors across exterior exit balconies. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. DRH00-00161, PC# 01-200. Grading permit # is BLD00-03479, Parking structure permit is BLD 00-03519. Refer to permits # BLD 01-00000 & 01-000-1 for other sections of this building. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/21/2012 DONE
Case Summary (BLD)  6/9/2009 DONE
DetailsTisha Gallop
Fee Review-notes7/7/20037/7/20037/7/2003 DONE
Case Summary (BLD)  3/24/2003  
Permanent Occupancy 7/17/20027/17/2002 DONE
Details
BLD-Final7/16/20027/17/20027/17/2002APASS
DetailsCarl Dependahl
scott; Phone #: ###-#### rec'd eng's affidavit...ok 7/17/2002 11:36:50 AM
Permanent occupancy  7/17/2002 DONE
Perm. Occ. Cert. #9253 issued 7-17-02 to the River Walk Apts., sec. 1 of 3.
BLD-Final6/17/20026/18/20026/18/2002ANR
DetailsCarl Dependahl
see bld00-03519 6/18/2002 11:35:05 AM
BLD-Final6/17/20026/17/20026/17/2002PNR
DetailsCarl Dependahl
SCOTT ###-####
BLD-Final6/14/20026/14/20026/14/2002PNR
DetailsCarl Dependahl
scott ###-#### fn will recall 6/14/2002 5:17:46 PM
BLD-Final6/12/20026/13/20026/13/2002ANR
DetailsJim Storey
Fee Review-notes3/14/20013/14/20011/28/2002 DONE
BLD-Final1/16/20021/17/20021/17/2002APART
DetailsCarl Dependahl
###-####, c/n, ok for t/o. 1/17/2002 3:51:20 PM
Temporary occupancy  1/17/2002 PARA
Temp. Occ. Cert. #4704 issued 1-17-02 to Sec. 1 of 3 of the River Walk Apts.
FIRE-Final Inspection1/15/20021/16/20021/16/2002APASS
DetailsRick Jackson
###-#### okay to occupy this permitted area only pending structural approval 1/16/2002 2:06:28 PM
BLD-Final1/14/20021/14/20021/14/2002PNR
DetailsCarl Dependahl
###-####, need all ok's, recall. 1/14/2002 6:06:37 PM
BLD-Final1/9/20021/9/20021/11/2002PCANC
DetailsCarl Dependahl
###-####
BLD-Final1/10/20021/10/20021/10/2002PCANC
DetailsRuss Owen
###-####
BLD-Aging Inspection12/10/200112/10/200112/11/2001 NR
DetailsCarl Dependahl
wip 12/11/2001 9:58:37 AM
BLD-Framing/Rough-in10/10/200110/10/200110/10/2001PFAIL
DetailsCarl Dependahl
###-#### DRYWALL complete draft stops, firestops....sec 1 drywall ok 10/10/2001 6:02:08 PM
BLD-Framing/Rough-in10/8/200110/9/200110/9/2001ANR
DetailsCarl Dependahl
fr insp -scott ###-####
BLD-Conference10/8/200110/8/200110/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/8/2001 10:45:38 AM reviewed archs letter to Dixie re use pf factory spec for dryer duct length...should be perm. labeled.
BLD-Conference10/5/200110/5/200110/5/2001PPASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/05/2001 at 09:59:15. Contact: ###-####...install 2 layers gyp at 2hr walls at ext sections...or equal 10/5/2001 5:13:50 PM
BLD-Conference10/4/200110/4/200110/4/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/4/2001 11:19:11 AM w/ bldr re 2hr wall terminations... need remove nailers, combustibles, & provide full depth blocking at floor lines & loft area
BLD-Energy code compliance10/3/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
scott-- ###-#### energy code 1st fl, sec 1 10/3/2001 11:15:14 AM
BLD-Framing/Rough-in10/3/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 10/3/2001 8:52:14 AM reinsp Scott ###-#### 1st/2nd fls sec 1ok to begin cover...drywall/firestop insp req'd 10/3/2001 5:39:24 PM c/n re 2hr walls at loft areas (4th fl.) 10/3/2001 5:41:34 PM
BLD-Energy code compliance10/3/200110/3/200110/3/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/3/2001 5:40:48 PM 2nd fl ins ok, sec 1
BLD-Energy code compliance10/1/200110/2/200110/2/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/01/2001 at 19:00:05. Contact: ###-####. 2nd fl. sec 1...complete firestops at plbg, elec per listing...recall 10/2/2001 10:58:37 AM
BLD-Energy code compliance10/2/200110/2/200110/2/2001PNR
DetailsCarl Dependahl
scott ###-#### energy code ... fix plbg firestops. 10/2/2001 4:42:51 PM
BLD-Energy code compliance9/28/200110/1/200110/1/2001PPART
DetailsCarl Dependahl
###-#### SCOTT 2nd fl, sec 1 ok to strip (rc channel), stock, & begin cover, keep c/n at remainder 10/1/2001 6:20:57 PM
BLD-Framing/Rough-in9/21/20019/24/20019/24/2001APART
DetailsCarl Dependahl
###-#### scott part, sec 1; keep c/n, ok to insul. 9/24/2001 5:35:34 PM
BLD-Framing/Rough-in9/20/20019/21/20019/21/2001AFAIL
DetailsCarl Dependahl
SCOTT ###-#### complete draft & fire stops verify all other r/i oks...keep c/n. 9/21/2001 4:34:45 PM
BLD-Framing/Rough-in9/18/20019/19/20019/19/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/18/2001 at 18:16:20. Contact: ###-####.
BLD-Framing/Rough-in9/18/20019/18/20019/18/2001PFAIL
DetailsCarl Dependahl
###-####- scott fr sec 1, 1st fl; c/n fire stops/ blocks, draftstops, 2hr wall... 9/18/2001 6:20:48 PM 9/18/2001 6:21:59 PM
BLD-Framing/Rough-in9/17/20019/17/20019/17/2001PCANC
DetailsCarl Dependahl
###-#### carl i ran out of time to do these insp. 301 9/17/2001 7:11:56 PM
BLD-Concrete8/31/20019/4/20019/4/2001APART
DetailsCarl Dependahl
scott ###-#### concrete; decks only, ok w/ spec insp. 9/4/2001 9:30:10 AM
BLD-Concrete8/27/20018/27/20018/27/2001PPART
DetailsCarl Dependahl
###-#### scott upper floor exit balconies. 8/27/2001 3:44:20 PM
BLD-Concrete8/22/20018/22/20018/22/2001PPART
DetailsCarl Dependahl
scott ###-####; 1st fl walks, exit balcony. 8/22/2001 1:45:35 PM
BLD-Conference8/17/20018/20/20018/20/2001APASS
DetailsCarl Dependahl
###-#### scott tre fireblocks, firestops at loft party walls, rock both sides truss to deck 8/20/2001 11:47:25 AM
(F) Reprint permit  8/17/2001 DONE
BLD-Conference8/9/20018/10/20018/10/2001APART
DetailsCarl Dependahl
scott ###-#### for conference ; c/n : firestops, 2hr wall assy, damaged shear walls, fireblox/draftstops, etc. ok to continue; keep c/n re 3hr occ sep...elev. shaft protection. 8/10/2001 4:53:05 PM
BLD-Conference8/1/20018/2/20018/2/2001PPASS
DetailsCarl Dependahl
scott ###-####, w/ bldr re exhaust duc 8/2/2001 5:39:39 PM s 8/2/2001 5:39:47 PM
BLD-Conference7/27/20017/30/20017/30/2001APART
DetailsCarl Dependahl
Scott kimball ###-####; c/n issued re shaft, 3hr protection at elev.; firestop at tubs 7/30/2001 4:44:13 PM
BLD-Conference7/24/20017/25/20017/25/2001PCANC
DetailsRuss Owen
###-#### Scott .wil recall for carl. 7/25/2001 1:07:51 PM
BLD-Conference7/10/20017/10/20017/10/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 7/10/2001 3:56:59 PM w/Mike Phillips, need 3hr door at elevator ( or equal as approved) as noted during inspection; shafts to be req'd per plan check interpretation of 710 & 711.3 ubc 7/10/2001 4:04:05 PM
BLD-Conference6/29/20017/3/20017/3/2001APART
DetailsCarl Dependahl
scott ###-#### please call before going out; need to address opening at 3hr floor for elev. 7/3/2001 12:13:15 PM
Plan resubmittals received  6/22/2001 DONE
Received two copies of revsied sheet M3.10 and one copy of cover letter. routed to Carl d. KMM
BLD-Conference6/19/20016/19/20016/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/19/2001 12:18:59 PM re 2hr walls w/ framer; show approved details.
BLD-Conference6/18/20016/18/20016/18/2001PPART
DetailsCarl Dependahl
scott ###-####, need all spec insp reprts for parking gar.6/19/2001 5:34:30 PM 6/19/2001 5:38:52 PM
Issue PAID IN FULL permit  6/12/2001 DONE
Inspection Record Card- Bld  6/11/2001 DONE
Print Occupancy Form  6/11/2001 DONE
Print Occupancy Form  6/11/2001 DONE
Telephone call  6/11/2001 DONE
left mess that permit is ready
Plan resubmittals received  6/8/2001 DONE
Received two sets of plan resubmittals plus small Documents from John Price, of Tamura and Associates, forwarded same to Mike Phillips. 6/8/01 DAR
Plan Reviewer's activity  6/8/2001 PASS
Print Pending Permit.LaserJet4  6/8/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/8/2001 DONE
Case Summary (BLD)  6/8/2001 DONE
Plan assigned to (M_P)3/5/2001 6/8/2001 PASS
DetailsMike Phillips
6/8/2001 16:32:59 M_P - activity updated through activity BLDA022 from case BLD01-00531.
Routing - PLAN CHECK5/31/2001 6/8/2001 DONE
Plan Reviewer's activity  6/7/2001 FAIL
Additional informaiton required for further review. Called and talked to John Price ands advised him of the issues.
Case Summary (BLD)  5/31/2001 DONE
Routing - PLANNING5/30/20015/30/20015/30/2001 PASS
Per Boise River System Permit #CFH00-00023 and Flood Plain Permit #CFH00-00024.
Routing - PLANNING5/22/2001 5/25/2001 PASS
Approved per DRH00-161 & as per revised plans in the DR file dated received May 24, 2001. Pending River Systems Permit approval for CFH00-23 & 24.
Routing - PLAN CHECK5/7/2001 5/22/2001  
Plan Review Completed(1st rev)  5/7/2001 FAIL
Routing - FIRE5/2/2001 5/7/2001 PASS
Routing - PLAN CHECK4/9/2001 5/2/2001 FAIL
Routing to fire.
Plan Reviewer's activity  5/2/2001 FAIL
Additional information required for further review.
Routing Off Site - STRUCTURAL3/14/2001 4/26/2001 PASS
Contacted pdq to take plans to outside eng. KMM
Plan resubmittals received  4/10/2001 DONE
Received three copies of revised struct. calcs. and sheets a8.0, a8.1, a8.2, a10.1, s0.1, s1.1, s1.2, s2.1, s2.2, s3.1, s3.2, s9.0, s9.1. Routed to Mike P. KMM
Routing - PLANNING4/3/2001 4/9/2001 FAIL
Community Foresty conditions not met, and several details still need to be provided to Staff for review and approval (e.g., a secondary wall color, guardrails, etc.).
Routing - PLUMBING3/30/2001 4/3/2001 PASS
per plans and 97 upc, pipe 1st follr water heater pan drains to garage floor also.
Routing - PARKS DEPARTME3/21/2001 3/30/2001 PASS
Dave Selvage
Plan resubmittals received  3/27/2001 DONE
Received two copies of revised sheets C1.O. One copy of cover letter and one copy of attached revised parking garage plans showing the garage drain and sand and grease trap per the plumbing inspectors comments. Routed to Mike Phillips. Routed two separate copies to Gary Ziegler and two separate copies to Lee Rice. KMM
Plan resubmittals received  3/22/2001 DONE
Received two copies of sheets A3.14, A3.17, A3.18 and A3.19. These are enlarged floor plans of the new and revised units shown on sheets A2.1 thru A2.4. These were not included in the orifinal submittal. Routed to Mike P. KMM
Routing - PUBLIC WORKS3/14/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/14/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/14/2001 DONE
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Case Summary (BLD)  3/14/2001 DONE
Application received  3/5/2001  
Print Pending Permit.LaserJet4  3/5/2001  
Received Certificate of Value  3/5/2001 DONE