Fee Review-notes | 3/5/2001 | 3/5/2001 | 3/22/2004 | | DONE |
|
|
|
|
BLD-Aging Inspection | 10/13/2003 | 10/13/2003 | 10/13/2003 | | PASS |
Dave Hannah
|
|
|
wip 10/13/2003 8:11:43 AM
|
BLD-Aging Inspection | 8/5/2003 | 8/5/2003 | 8/5/2003 | | PASS |
Carl Dependahl
|
|
|
awaiting c/n resolution re doors at 2hr wall...phased project, WIP. 8/5/2003 9:33:06 AM
|
BLD-Aging Inspection | 6/3/2003 | 6/3/2003 | 6/3/2003 | | DONE |
Carl Dependahl
|
|
|
has c/n...wip per supt. Kelly. 6/3/2003 1:37:11 PM
|
BLD-Final | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PART |
Carl Dependahl
|
|
|
kelly; Phone #: ###-#### Internet Inspection Request from: Annette Moore...c/n re hand rails & 90 min occ. sep. doors; ok to use 1st fl exec offices. 4/1/2003 5:01:49 PM
|
BLD-Final | 3/21/2003 | 3/24/2003 | 3/24/2003 | A | FAIL |
Carl Dependahl
|
|
|
KELLY; Phone #: ###-#### Internet Inspection Request from: Darla Downs... 3/24/2003 11:23:52 AM; c/n, other insps, complete glazing, submit stamped modifications, show rated details 3/24/2003 11:51:32 AM
|
FIRE-Final Inspection | 3/20/2003 | 3/21/2003 | 3/21/2003 | A | PASS |
Rick Jackson
|
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Annette Moore
|
BLD-Framing/Rough-in | 3/5/2003 | 3/6/2003 | 3/6/2003 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 3/5/2003 at 6:51:02 AM. Contact: ###-####....ok to tile lids at office & west portion; need to remove misc. penetrations at exit passageway....large conduit w/o boxes, piping, etc. advise supt. 3/6/2003 3:59:40 PM
|
BLD-Framing/Rough-in | 2/11/2003 | 2/12/2003 | 2/12/2003 | A | NR |
Carl Dependahl
|
|
|
Scheduled by a contractor via Hello! on 2/11/2003 at 7:32:26 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/12/2003 | 2/12/2003 | 2/12/2003 | P | NR |
Carl Dependahl
|
|
|
need eng's ok for substandard spec. insp report...hvac permit expired? 2/12/2003 2:28:52 PM
|
Case Summary (BLD) | | | 2/7/2003 | | |
|
|
|
|
BLD-Conference | 12/23/2002 | 12/26/2002 | 12/26/2002 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/23/2002 at 09:13:53. Contact: ###-####.
|
BLD-Conference | 12/26/2002 | 12/26/2002 | 12/26/2002 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 7/25/2002 | 7/25/2002 | 7/25/2002 | P | PART |
Carl Dependahl
|
|
|
dan; Phone #: ###-####...clg grid nr, wip; advised supt that shell not finalled ...need eng's ok, re mti reports of failure 7/25/2002 9:02:02 AM
|
BLD-Framing/Rough-in | 3/7/2002 | 3/8/2002 | 3/8/2002 | A | FAIL |
Carl Dependahl
|
|
|
fr insp - dan ###-#### ; need special insp for spray-on f.p. remove ducts at exit (back of communications rm.) & repair 2hr wall...firestop toggles at same. 3/8/2002 1:53:36 PM
|
BLD-Framing/Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Carl Dependahl
|
|
|
###-#### firestop floors, clarify shaft penetration(hvac) 2/12/2002 12:51:36 PM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/8/2002 | 2/8/2002 | P | NR |
Carl Dependahl
|
|
|
###-#### DAN; need eng's approval re seismic upgrade, verify other ok's. recall. 2/8/2002 5:37:01 PM
|
BLD-Conference | 12/17/2001 | 12/17/2001 | 12/17/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/17/2001 3:06:15 PM w/eng'r, need report for struct upgrade & appropriate testing.
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/17/2001 | | NR |
Carl Dependahl
|
|
|
wip, 1st fl. west wing. 12/17/2001 3:05:17 PM
|
BLD-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | NR |
Carl Dependahl
|
|
|
wip 10/9/2001 2:57:25 PM
|
BLD-Aging Inspection | 8/6/2001 | 8/6/2001 | 8/6/2001 | | PASS |
Carl Dependahl
|
|
|
wip 8/6/2001 10:11:07 AM
|
Issue & PRINT to be Invoiced | | | 8/1/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 7/31/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/31/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/31/2001 | | DONE |
|
|
|
e-mailed curtis
|
Routing - PLAN CHECK | 7/30/2001 | 7/30/2001 | 7/30/2001 | | PASS |
|
|
|
Approved as noted and per attached plan review conditions, all as part of the approved plans.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/30/2001 | | PASS |
|
|
|
To permit desk to issue.
|
Plan Review Completed(1st rev) | | | 7/30/2001 | | PASS |
|
|
|
|
Routing - FIRE | 7/25/2001 | | 7/30/2001 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 3/19/2001 | | 7/30/2001 | | PASS |
Dan Stuart
|
|
|
7/30/2001 15:24:19 DRS - activity updated through activity BLDA022 from case BLD01-00539.
|
Routing - PLAN CHECK | 3/22/2001 | | 7/25/2001 | | PEND |
|
|
|
NOTE: Other SLRMC projects were inserted in place of this permit by request of SLRMC and this permit was delayed to this time. 7/6/01 - Received new floor plan defining peramiters of the "Phase 'A" portion. defining accessible route and the temporary exit corridor to be constructed to maintain the rated exit path between the "I-1.1, Central Wing" and the "B, West Wing, South 1/2". 7/25/01 - Routing to fire code analyst for review.
|
Additional plans submitted | | | 7/25/2001 | | |
|
|
|
Received new sheets A3.1A & A4.0 not submitted with original plans but referenced in plan sections originally submitted.
|
Additional plans submitted | | | 7/6/2001 | | |
|
|
|
Received new sheets A2.1A of "Phase A" with full dimensions and the limits of work shown. Also revceived copy of sheet A1.0 with the accessible route indicated for accessing the building from the Jefferson Street side by existing ramp.
|
BLD-Conference | 5/30/2001 | 5/30/2001 | 5/30/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 5/30/2001 2:41:01 PM w/ St Lukes...wip
|
Routing - PLUMBING | 3/20/2001 | | 3/22/2001 | | PASS |
|
|
|
min. vent lines are not to exceed 1/3 of their total permitted length.
|
Routing - PUBLIC WORKS | 3/19/2001 | | 3/20/2001 | | PASS |
|
|
|
|
Pending Assignment by MYS | 3/5/2001 | | 3/19/2001 | | DONE |
Marlene Southard
|
|
|
|
Application received | | | 3/5/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/5/2001 | | PEND |
|
|
|
Plans not fully dimensioned. KMM
|
Received Certificate of Value | | | 3/5/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 7/30/2001 | | | | |
|
|
|
|