BLD-Final | 11/13/2001 | 11/14/2001 | 11/14/2001 | A | FAIL |
Steven Webb
|
|
|
###-#### PHYLLIS c/n issued--handrails--2--on back deck and joist hangers need nailing under deck 11/14/2001 9:49:11 AM
|
BLD-Final | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Steven Webb
|
|
|
###-#### RICK C. of C. #20637 issued. 11/14/2001 2:40:30 PM
|
DOC - Permit Finaled | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 11/14/2001 2:40:34 PM
|
BLD-Aging Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 | | PART |
Steven Webb
|
|
|
wip 10/1/2001 8:15:40 AM
|
BLD-Energy code compliance | 7/30/2001 | 7/31/2001 | 7/31/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/30/2001 at 17:04:47. Contact: ###-####. ok to cover 7/31/2001 1:20:43 PM
|
BLD-Framing/Rough-in | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 17:29:51. Contact: ###-####. C/N ok to insulate main and top floors not basement. 7/27/2001 9:17:46 AM
|
BLD-Framing/Rough-in | 7/27/2001 | 7/27/2001 | 7/27/2001 | P | PART |
Steven Webb
|
|
|
Rick ###-#### ok to insulate--Need to verify draftstops installed at energy (basement). 7/27/2001 2:07:20 PM
|
Case Summary (BLD) | | | 7/26/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/24/2001 | 7/25/2001 | 7/25/2001 | A | FAIL |
Steven Webb
|
|
|
Rick ###-#### C/N posted 7/25/2001 9:58:06 AM
|
BLD-Framing/Rough-in | 7/24/2001 | 7/24/2001 | 7/24/2001 | P | PASS |
Steven Webb
|
|
|
###-#### shear ok to side 7/24/2001 2:44:03 PM
|
Override - Parcel Holds | | | 7/24/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 7/24/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 7/9/2001 | 7/10/2001 | 7/10/2001 | A | FAIL |
Steven Webb
|
|
|
Rick ###-#### shear wall C/N issued-- 7/10/2001 9:12:32 AM
|
Override - Parcel Holds | | | 7/9/2001 | | |
|
|
|
|
BLD-Aging Inspection | 6/13/2001 | 6/13/2001 | 6/13/2001 | | PASS |
Steven Webb
|
|
|
wip 6/13/2001 7:41:00 AM
|
BLD-Foundation | 4/13/2001 | 4/13/2001 | 4/13/2001 | P | PART |
Steven Webb
|
|
|
###-#### wip 4/13/2001 3:20:37 PM
|
Override - Parcel Holds | | | 4/13/2001 | | |
|
|
|
|
BLD-Footing | 4/5/2001 | 4/6/2001 | 4/6/2001 | P | PART |
Steven Webb
|
|
|
Jack ###-#### wip 4/6/2001 1:52:57 PM
|
Override - Parcel Holds | | | 4/5/2001 | | |
|
|
|
|
Plan assigned to (DJO) | 3/12/2001 | 3/12/2001 | 4/4/2001 | | PASS |
Dan Overy
|
|
|
4/4/2001 10:34:50 DJO - activity updated through activity BLDA022 from case BLD01-00541.
|
Plan Reviewer's activity | | | 4/4/2001 | | DONE |
|
|
|
received additional engineering for roof beam.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/4/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/4/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/4/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/4/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Override - Parcel Holds | | | 4/4/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/4/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 3/30/2001 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 3/30/2001 | | PEND |
|
|
|
called tradewinds at 8:00 A.M. and left message for ted that nither the designer or engineer have answered my phone calls. there are questions to be answered before issuance of this permit.
|
Plan Reviewer's activity | | | 3/28/2001 | | PEND |
|
|
|
received revised plans and additional calculations. still have questions. have called dakota and ahj. left message.
|
Plan Reviewer's activity | | | 3/12/2001 | | PEND |
|
|
|
there is so much wrong with this plan that wasn't detectible on initial review. part of the problem is mix-matching information from different design people. have contacted Dakota Design, who takes no responsibility, as he was not contracted to redraw entire plan. have spoke to Phyllis at Tradewinds. Ted Martinez is out of town all week. general agreement that Dakota should redraw or whatever to make corrections.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/12/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/5/2001 | 3/5/2001 | 3/6/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 3/5/2001 | 3/5/2001 | 3/6/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/5/2001 | 3/5/2001 | 3/5/2001 | | PASS |
|
|
|
TOOK TO JIM WYLLIE FOR FLOOD PLAIN JIM WYLLIE RELEASED 3/5/2001/PE
|
Application received | | | 3/5/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 3/6/2001 | 3/6/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 3/5/2001 | | | | PEND |
Dan Overy
|
|
|
|