BLD-Final | 9/4/2001 | 9/5/2001 | 9/5/2001 | A | PASS |
Jim Sly
|
|
|
###-#### TROY C/C issued. 9/5/2001 8:55:58 AM
|
DOC - Permit Finaled | 9/5/2001 | 9/5/2001 | 9/5/2001 | A | PASS |
Jim Sly
|
|
|
Finaled by inspector at 9/5/2001 8:56:04 AM
|
BLD-Aging Inspection | 8/20/2001 | 8/20/2001 | 8/20/2001 | | PART |
Jim Sly
|
|
|
WIP 8/20/2001 8:28:12 AM
|
DOC - Permit Finaled | 8/20/2001 | 8/20/2001 | 8/20/2001 | A | PASS |
Jim Sly
|
|
|
Added by Inspector: 316 On 8/20/2001 8:25:22 AM
|
BLD-Energy code compliance | 6/19/2001 | 6/20/2001 | 6/20/2001 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 14:38:52. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/15/2001 | 6/18/2001 | 6/18/2001 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 06/15/2001 at 15:29:03. Contact: ###-####. C/N posted 6/18/2001 11:28:47 AM
|
BLD-Framing/Rough-in | 5/30/2001 | 5/30/2001 | 5/30/2001 | P | PART |
Jim Sly
|
|
|
shear wall todd ###-#### Shear OK. 5/30/2001 3:34:23 PM
|
BLD-Foundation | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 04/24/2001 at 13:28:49. Contact: ###-####.
|
BLD-Footing | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Dave Hannah
|
|
|
todd ###-#### W.I.P. 4/23/2001 1:42:35 PM
|
Issue PAID IN FULL permit | | | 4/20/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 3/20/2001 | 3/20/2001 | 4/17/2001 | | PASS |
Dan Overy
|
|
|
4/17/2001 14:17:02 DJO - activity updated through activity BLDA022 from case BLD01-00585.
|
Plan Reviewer's activity | | | 4/17/2001 | | DONE |
|
|
|
have received calculations and red-lines for lateral at garage front. due to the excessive red-lining and lack of all engineered red-lined sheets, only one approved set of plans will be issued.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/17/2001 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/17/2001 | | DONE |
|
|
|
|
Plan Review Report | | | 4/17/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 3/20/2001 | | PEND |
|
|
|
have started initial review. this plan has been addressed by Briggs engineering for tall walls at RV bay of garage. Lateral anaysis for the front of the RV bay have not been provided. I have talked with Tim Johnson and the only way code can be met at the front of the RV garage is to transfer loads into roof system. In order to achieve this, the entire front of the structure will need engineering. Truss company has faxed a copy of the attic room truss profile. If it is correct then 2nd floor location on plans is in the wrong place. Have spoke with Tod Amyx and he will bring in truss layouts, revisions and resubmittals as soon as possible.
|
Plans ACCEPTED BY PLAN CHECK | | | 3/20/2001 | | |
|
|
|
|
Routing - PLANNING | 3/9/2001 | 3/9/2001 | 3/9/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/9/2001 | 3/9/2001 | 3/9/2001 | | PASS |
|
|
|
|
Application received | | | 3/9/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 3/9/2001 | 3/9/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 3/9/2001 | | | | PEND |
Dan Overy
|
|
|
|