Permit Information
Permit NumberBLD01-00588
StatusFinaled
Name 5 MILE PLAZA
Site Address 10496 W OVERLAND RD
Project NameJACK IN THE BOX
Customer Number 
ePlanReviewNo
Description
JACK IN THE BOX RESTAURANT - TO CONSTRUCT A NEW 2,950 SQUARE FOOT, ONE STORY, WOOD FRAMED JACK IN THE BOX FAST FOOD RESTAURANT WITH DRIVE-THRU WINDOW AND RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH01-00029/CUP00-00158/PC #01-189/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes8/29/20018/29/20011/29/2002 DONE
matt-###-####
BLD-Final10/2/200110/3/200110/3/2001APASS
DetailsRuss Owen
###-####. ok permanent occupancy. 10/3/2001 10:17:59 AM
Permanent Occupancy 10/3/200110/3/2001 DONE
Details
Permanent occupancy  10/3/2001 DONE
Perm. Occ. Cert. #8851 issued 10-3-01 to Jack in the Box.
BLD-Final9/12/20019/13/20019/13/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/12/2001 at 13:29:42. Contact: ###-####. need s-i final letter need to support cantilevered projection above front counter,need to fire tap 1 hr shafts. all other signatures have been signed for permanent oc. wright brothers is contact ###-####. 9/13/2001 11:11:11 AM
BLD-Final9/12/20019/13/20019/13/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 09/12/2001 at 13:29:42. Contact: ###-####. need s-i final letter need to support cantilevered projection above front counter,need to fire tap 1 hr shafts. all other signatures have been signed for permanent oc. wright brothers is contact ###-####. 9/13/2001 11:11:11 AM
Temporary occupancy  9/4/2001 PART
Temp. Occ. Cert. #4588 issued 9-4-01 to Jack in the Box.
BLD-Final8/31/20018/31/20018/31/2001PPART
DetailsRuss Owen
###-####ok temp oc c/n posted for other items. 8/31/2001 3:54:22 PM
BLD-Conference8/31/20018/31/20018/31/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/31/2001 at 08:39:10. Contact: ###-####.
FIRE-Final Inspection8/31/20018/31/20018/31/2001PPASS
DetailsRick Jackson
Added by Inspector: 409 On 8/31/2001 3:22:22 PM
FIRE-Final Inspection8/30/20018/30/20018/30/2001PCANC
DetailsJoe Tawney
fire fn - cathy ###-#### Cancel Reschedule 8/30/2001 5:13:49 PM
FIRE-Final Inspection8/29/20018/29/20018/29/2001PFAIL
DetailsJoe Tawney
Reinsp Fail C/N issued 8/29/2001 2:07:39 PM
BLD-Conference8/28/20018/28/20018/28/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/28/2001 at 10:53:58. Contact: ###-####. kitchen grid. 8/28/2001 2:09:49 PM
BLD-Conference8/26/20018/27/20018/27/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/26/2001 at 20:17:39. Contact: ###-####. kitchen grid. 8/27/2001 11:34:57 AM
FIRE-Alarm Testing8/24/20018/27/20018/27/2001AFAIL
DetailsJoe Tawney
###-#### matt Final Fail Hoods tested OK. Need air bal report. Not ready on other issues 8/27/2001 11:14:48 AM
BLD-Conference8/24/20018/24/20018/24/2001PCANC
DetailsJoe Tawney
Cancel 8/24/2001 1:27:39 PM
BLD-Conference8/20/20018/21/20018/21/2001APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/20/2001 at 21:49:57. Contact: ###-####.front dining grid ok. 8/21/2001 4:05:32 PM
BLD-Conference8/15/20018/16/20018/16/2001ACANC
DetailsTom Arcoraci
###-####
BLD-Framing/Rough-in8/16/20018/16/20018/16/2001PFAIL
DetailsTom Arcoraci
grid ceiling Matt ###-#### GRID INCOMPLETE MADE VERBAL TO SUPER WILL NEED TO RECALL 8/16/2001 3:06:56 AM
BLD-Conference8/9/20018/9/20018/9/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 08/09/2001 at 07:35:05. Contact: ###-####.. need to sheetrock above shafts, built as per detail, NOTE: detail porly drawn at roof penetration of shafts now constructed But constructed as per plans. 8/9/2001 4:25:04 PM
BLD-Conference8/7/20018/7/20018/7/2001PPART
DetailsRuss Owen
###-#### MATT
. working on shafts for grease hoods, 8/7/2001 3:46:32 PM
BLD-Framing/Rough-in7/24/20017/25/20017/25/2001APART
DetailsRuss Owen
Matt ###-####ok to sheetrock ,still needs a draft stop at inside attic and need 1 hour shafts inspected. 7/25/2001 10:56:42 AM
BLD-Framing/Rough-in7/23/20017/24/20017/24/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/23/2001 at 17:28:53. Contact: ###-####.
BLD-Framing/Rough-in7/23/20017/23/20017/23/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/23/2001 at 09:55:29. Contact: ###-####.c/n posted ok to insulate. 7/23/2001 3:41:13 PM
BLD-Wall cover7/23/20017/23/20017/23/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/23/2001 at 09:57:06. Contact: ###-####.c/n posted ,ok to insulate. 7/23/2001 3:40:50 PM
BLD-Framing/Rough-in7/12/20017/12/20017/12/2001PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/12/2001 at 10:54:49. Contact: ###-####. 7/13/2001 8:48:05 AM. need to construct some of the roof area mansard as per the structural details as shown on plans,i have gone over these areas with contractor,will recall before covering. 7/13/2001 8:52:45 AM
BLD-Framing/Rough-in7/9/20017/10/20017/10/2001AFAIL
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/09/2001 at 14:21:27. Contact: ###-####.c/n posted. 7/10/2001 11:58:18 AM
BLD-Footing6/21/20016/22/20016/22/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/21/2001 at 13:22:13. Contact: ###-####.
BLD-Foundation6/21/20016/22/20016/22/2001APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/21/2001 at 13:22:50. Contact: ###-####.
BLD-Foundation6/21/20016/21/20016/21/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/21/2001 at 08:05:19. Contact: ###-####.
BLD-Footing6/21/20016/21/20016/21/2001PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 06/21/2001 at 08:06:13. Contact: ###-####.
BLD-Footing6/19/20016/20/20016/20/2001PFAIL
DetailsRuss Owen
###-#### verbal c/n with contractor from wright brothers, front wall req 2 bars top and bottom also 6 in wider footing at the front entry also inst shear footings require a 6 in raise above the slab,also clearance to earth at several locations, not this is a mono pour for footing and slab. 1/20/2002 5:18:37 PM
(F) Reprint permit  5/14/2001 DONE
Issue PAID IN FULL permit  5/11/2001 DONE
Routing - PLAN CHECK5/2/2001 5/4/2001  
Routing - PLANNING5/4/2001 5/4/2001 PASS
Approved per CUP00-158 (Dave Abo), and per DRH01-29 (Marty Santoyo).
Routing - PLAN CHECK5/4/2001 5/4/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/4/2001 PASS
Inspection Record Card- Bld  5/4/2001 DONE
Print Occupancy Form  5/4/2001 DONE
Telephone call  5/4/2001 DONE
talked to rick to verify plans are ready
Plan assigned to (JCM)3/9/2001 5/4/2001 PASS
DetailsJohn Menard
5/4/01 13:44:57 JCM - activity updated through activity BLDA022 from case BLD01-00588.
Routing - PLANNING3/14/2001 5/3/2001 PEND
Pending Design Review approval.
Routing - PUBLIC WORKS5/1/2001 5/2/2001 PASS
Routing - PLANNING5/2/2001 5/2/2001 FAIL
Plans do not comply with CU conditions; please note requirement for cross-access agreements.
Routing - PLAN CHECK4/27/2001 5/1/2001  
Routing - FIRE4/27/2001 4/27/2001 PASS
Routing - PLAN CHECK4/5/2001 4/27/2001  
Plan resubmittals received  4/12/2001 DONE
Received plan resubmittals from BRS, Rick Toews, small documents and two sets of sheet A3.0. 4/12/01 DAR
Routing - FIRE4/2/2001 4/5/2001 FAIL
hydrant?
Plan Review Completed(1st rev)  4/5/2001 FAIL
Plan resubmittals requested  4/2/2001 FAIL
Mailed the architect of record a copy of the comment list requesting revisions. JCM
Routing - PLAN CHECK3/21/2001 4/2/2001  
Routing - PLUMBING3/16/2001 3/21/2001 PASS
premis backflow preventor must be a 2", fixture schedule calls for a 1 1/2". ceiling space may be a return air plenum, if so , all material in the ceiling must be approved for use in a plenum, verify
Routing - PUBLIC WORKS3/9/2001 3/14/2001 FAIL
Requires drainage plan revision pretreat. per Brian M. KMM
Application received  3/9/2001  
Plans ACCEPTED BY PLAN TECH  3/9/2001 DONE
Received Certificate of Value  3/9/2001 DONE
Plan routing begun/NEW & ADDTN  3/9/2001 DONE