Permit Information
Permit NumberBLD01-00590
StatusFinaled
Name WHITNEY BAPTIST CHURCH
Site Address 2309 W DORIAN ST
Project NameWHITNEY BAPTIST
Customer Number 
ePlanReviewNo
Description
(WHITNEY BAPTIST CHURCH) This building is NOT fire sprinklered. To renovate portions of an existing church building (first floor and mezzanine). Work is to include two restrooms accessible to the disabled, a new Chancel (platform), glass block windows, interior nonbearing walls, wall furring, new doors, a small mezzanine expansion and remodel, and suspended ceilings all per approved drawings and plan review conditions on file. The occupant load capacity of the NAVE (350) shall be posted on an approved sign near the main exit. PC-0191-01 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy UNPAID FEE  3/21/2003 DONE
Permenant Occupancy #9600 Whitney baptist Church
Permanent Occupancy 3/17/20033/17/2003 DONE
Details
BLD-Aging Inspection3/17/20033/17/20033/17/2003 PART
DetailsJim Storey
rick to follow up with card to city. 3/17/2003 9:33:56 AM
Inspection Record Card- Bld  3/17/2003  
Print Occupancy Form  3/17/2003 DONE
BLD-Aging Inspection1/13/20031/13/20031/13/2003 PASS
DetailsJim Storey
ok for final all others signed off ok. 1/13/2003 7:21:02 AM
FIRE-Final Inspection10/11/200110/12/200110/12/2001APASS
DetailsRick Jackson
Rick, ###-####
BLD-Final10/11/200110/12/200110/12/2001PPASS
DetailsJim Storey
Rick, ###-#### final ok pending plm sign off. 10/12/2001 2:45:38 PM
BLD-Aging Inspection10/1/200110/1/200110/1/2001 PART
DetailsJim Storey
wip pending others. 10/2/2001 9:52:56 AM
BLD-Framing/Rough-in7/27/20017/30/20017/30/2001ANH
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/27/2001 at 13:46:13. Contact: ###-####. no access. 7/30/2001 8:46:45 AM
BLD-Framing/Rough-in7/30/20017/30/20017/30/2001PPASS
DetailsJim Storey
Rick ###-#### first floor ok fo cover. 7/30/2001 11:17:27 AM
BLD-Framing/Rough-in7/19/20017/20/20017/20/2001PPART
DetailsJim Storey
###-#### approved resubmital in to archive/ 2 nd floor ok for cover/ arch g bleaka on site will fire blk. furn chase at floor lines 7/23/2001 9:23:08 AM
BLD-Framing/Rough-in6/15/20016/18/20016/18/2001APART
DetailsTom Arcoraci
Rod ###-#### ok to cover east side not including balcony 6/17/2001 9:10:00 PM
Plan Reviewer's activity  5/14/2001 PASS
Revised Fire Review comments. FD waived all requirements for any Fire Alarm modifications, 5/11/01 in response to architect's request for a waiver. "Attached" review comments revised, Field Inspector notified.
Issue PAID IN FULL permit  5/11/2001 DONE
Routing - PLAN CHECK4/18/2001 5/10/2001 PASS
Drawings approved, with conditions, after resubmittal review.
Plan assigned to (CJW)3/21/2001 5/10/2001 PASS
DetailsCarl Westfall
5/10/01 12:48:56 CJW - activity updated through activity BLDA022 from case BLD01-00590.
Plan Reviewer's activity  5/10/2001  
Forwarded on to Dave Miller, Fire Department, a request from the architect that an alarm system not be required in this 38 year old assembly building (church).
PLANS/APPL TAKEN TO FRONT DESK  5/10/2001 PASS
Inspection Record Card- Bld  5/10/2001 DONE
Print Occupancy Form  5/10/2001 DONE
Telephone call  5/10/2001 DONE
left mess that permit is ready
Plan resubmittals received  5/9/2001 DONE
Received two copies of revised sheets
Plan resubmittals received  5/9/2001 DONE
Received two copies of revised sheets A-3.0, A-3.1, A-5.0, A-6.0. Support documentation regarding column covers, carpeting and woven fabric regarding flame spread, smoke generation and UBC standard 8-2 covering fabrics. Letter to David Miller regarding an alarm systems. Routed to Carl W. KMM
Routing - FIRE4/12/2001 4/17/2001 PASS
Plan Review Completed(1st rev)  4/17/2001  
Failed first UBC review.
Routing - PLAN CHECK3/28/2001 4/12/2001  
Failed first UBC review.
Plan Reviewer's activity  4/9/2001  
Failed first UBC review. UBC plan review started April 9, 2001 and finished April 12, 2001. A response from the architect was required. See the conditions list.
Routing - PLANNING3/23/2001 3/28/2001 PASS
Routing - PUBLIC WORKS3/21/2001 3/23/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/12/2001 DONE
Involved parties sheet needs to be signed. Faxed to George Blecha. KMM
First Notice3/9/20013/9/20013/9/2001 DONE
Received Certificate of Value  3/9/2001  
Application received  3/9/2001  
Recd Pcfee & Taken To Pln CK  3/9/2001 DONE