Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD01-00594
StatusFinaled
Name PARK APARTMENTS II
Site Address 1011 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "A-1" BUILDING * To construct a new two story, with basement and mezzanines 3,968 sq.ft. wood framed, 10 unit apartment building. The basement is 2,192 sq.ft and has four unit @ 548 sq.ft. each. The first floor is 2,532 sq.ft. and contains four units, two @ 548 sq.ft and two @ 604 sq.ft with a 114 sq.ft. mezzanine. The second floor is 1,436 sq.ft. and contains two units @ 604 sq.ft. with a 114 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  10/15/2015 DONE
Case Summary (BLD)  10/15/2015 DONE
BLD-Final6/6/20026/7/20026/7/2002APASS
DetailsCarl Dependahl
ok 6/7/2002 11:32:44 AM
Permanent Occupancy 6/7/20026/7/2002 DONE
Details
Permanent occupancy  6/7/2002 DONE
Perm. Occ. Cert. #9159 issued 6-7-02 to the Park Apartments II.
BLD-Framing/Rough-in6/5/20026/6/20026/6/2002AFAIL
DetailsCarl Dependahl
keep c/n, install all handrails as per c/n. 6/6/2002 9:53:08 AM
BLD-Final6/6/20026/6/20026/6/2002PNR
DetailsCarl Dependahl
Cathy has the card
BLD-Final6/3/20026/5/20026/5/2002PNR
DetailsCarl Dependahl
###-####
BLD-Conference6/4/20026/4/20026/4/2002PPASS
DetailsCarl Dependahl
re finals... 6/4/2002 3:39:29 PM
Fee Review-notes3/14/20013/14/20014/18/2002 DONE
Case Summary (BLD)  4/4/2002  
BLD-Final3/25/20023/26/20023/26/2002APART
DetailsCarl Dependahl
###-#### keep c/n, has t/o 3/26/2002 11:00:42 AM
FIRE-Final Inspection3/25/20023/26/20023/25/2002APASS
DetailsRick Jackson
###-####
BLD-Final3/23/20023/25/20023/25/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/23/2002 at 12:52:53. Contact: ###-####. keep c/n ...install handrails per c/n 3/25/2002 10:34:11 AM
FIRE-Final Inspection3/23/20023/25/20023/25/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/23/2002 at 12:53:41. Contact: ###-####.
BLD-Final3/25/20023/25/20023/25/2002PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/25/2002 11:39:34 AM keep c/n ok for t/o 3/25/2002 3:15:27 PM
BLD-Conference3/25/20023/25/20023/25/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/25/2002 11:36:16 AM w/ handrail fabricator: install extensions 3/25/2002 3:13:57 PM
Temporary occupancy  3/25/2002 DONE
Temp. Occ. Cert. #4752 issued 3-25-02 to the Park Apts. II.
BLD-Final3/22/20023/22/20023/22/2002PFAIL
DetailsCarl Dependahl
###-#### dave c/n, stair rails, other finals, etc. 3/22/2002 3:59:55 PM
FIRE-Final Inspection3/22/20023/22/20023/22/2002PFAIL
DetailsRick Jackson
###-#### dave extinguisher tags and handrails 3/22/2002 3:28:05 PM
FIRE-Final Inspection3/21/20023/21/20023/21/2002PFAIL
DetailsRick Jackson
###-#### handrails and extinguishers 3/21/2002 4:21:01 PM
BLD-Conference3/13/20023/14/20023/14/2002APASS
DetailsCarl Dependahl
###-#### DAVE will bond landscape. 3/14/2002 11:13:01 AM
BLD-Conference3/12/20023/13/20023/13/2002PPART
DetailsRick Jackson
dave -###-#### for conf showed locations for fire lanes; need address, extinguishers, map signage at entrances and signs at entrance to park in marked stalls only 3/13/2002 2:33:20 PM
BLD-Conference3/1/20023/4/20023/4/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/1/2002 5:12:29 PM w/ bldr...complete handrails, stairs , etc for final insp 3/4/2002 3:02:23 PM
BLD-Conference2/28/20023/1/20023/1/2002ANR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/28/2002 5:12:17 PM 8694101
BLD-Conference2/27/20022/28/20022/28/2002APASS
DetailsCarl Dependahl
###-#### re guards...handrails, ok. 2/28/2002 5:20:43 PM
BLD-Aging Inspection1/14/20021/14/20021/17/2002 NR
DetailsCarl Dependahl
apt, wip 1/17/2002 10:29:08 AM
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Wall cover11/13/200111/13/200111/13/2001PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/13/2001 at 08:24:42. Contact: ###-####. ok to cover, need int gyp shear nail insp & flood certs; chk stairs/rails at final . .11/13/2001 1:50:02 PM 11/13/2001 1:51:35 PM
BLD-Framing/Rough-in11/13/200111/13/200111/13/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/13/2001 11:05:00 AM ok to cover walls; still need flood plain cert ( has at office?)
BLD-Wall cover11/9/200111/9/200111/9/2001PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 11/09/2001 at 10:02:33. Contact: ###-####.
BLD-Energy code compliance11/9/200111/9/200111/9/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/9/2001 5:00:39 PM ext walls ok; need chk 3rd fl draft stop seal, rest ok to begin cover.
BLD-Framing/Rough-in11/8/200111/8/200111/8/2001PPART
DetailsCarl Dependahl
###-#### DAVE keep c/n re fireblocks, chk at dropped clg lines upper floors, ok to insulate. eng'g rec'd re 1st fl walls 11/8/2001 5:01:38 PM
BLD-Wall cover10/19/200110/22/200110/22/2001AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/19/2001 at 10:47:31. Contact: ###-####... c/n: shear panels, hdwe, fireblox. 10/22/2001 2:41:20 PM
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Conference10/1/200110/1/200110/1/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/1/2001 8:57:05 AM w/ eng'r re c/n of 8-3-01
BLD-Conference9/26/20019/26/20019/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/26/2001 2:00:29 PM w/ Bob Peters, eng'r: need documentation for shear walls justifying configuration...shear at 189plf exceeds code allowed for single ply gyp per t-25-s. rejected prior letter, keep c/n.
BLD-Conference9/21/20019/21/20019/21/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/21/2001 8:36:54 AM w/ Carl W. re shearwall eng'g. "2nd opinion"... keep c/n
BLD-Conference9/21/20019/21/20019/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/21/2001 2:49:31 PM rec'd eng's detail
BLD-Conference9/20/20019/20/20019/20/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/20/2001 8:27:44 AM W/ NEW SUPT...RE C/N ON SHEAR WALLS
BLD-Conference9/11/20019/11/20019/11/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/11/2001 4:40:40 PM re frame details, fireblox, etc.
BLD-Conference9/10/20019/10/20019/10/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 9/10/2001 4:58:59 PM w/ Otis Lemon...need stamped detail/letter re shear, keep c/n.
BLD-Framing/Rough-in9/7/20019/7/20019/7/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 9/7/2001 3:25:42 PM 2nd c/n issued (1st 8-03-01)...re shear walls not sheathed to sill plates, eng'g not adequate, not stamped. a SWO will be issued if not addressed by 9-11
BLD-Framing/Rough-in8/28/20018/29/20018/29/2001AFAIL
DetailsCarl Dependahl
###-#### drywall; need stamped detail/fix as req'd for shear walls , ok to pre rock at tubs8/29/2001 1:21:05 PM 8/29/2001 1:21:58 PM
BLD-Conference8/28/20018/28/20018/28/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/28/2001 10:31:28 AM w/ supt re shear walls & carpentry
BLD-Framing/Rough-in8/23/20018/24/20018/24/2001APART
DetailsCarl Dependahl
###-#### jim ok to cover at tubs at party wall only. 8/24/2001 11:04:38 AM
BLD-Conference8/24/20018/24/20018/24/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/24/2001 8:47:11 AM ok to prerock tub walls
BLD-Conference8/22/20018/22/20018/22/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/22/2001 7:57:00 AM w/Jim, need eng's letter re walls
BLD-Framing/Rough-in8/20/20018/20/20018/20/2001PPART
DetailsCarl Dependahl
FR JIM ###-#### 1st fl walk thru, & ok to add ins sheathing. Awaiting eng's ok for shear at 1st fl ok to continue. 8/20/2001 3:49:03 PM
BLD-Conference8/17/20018/17/20018/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/17/2001 8:03:26 AM w/ Otis Lemon re energy code & shear walls for project....consult w/ 325?
Plan resubmittals received  8/15/2001 DONE
Received plan resubmittals from CSHQA, forwarded same to Mike Phillips. 8/15/01 DAR
BLD-Framing/Rough-in8/10/20018/10/20018/10/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/10/2001 2:01:26 PM keep c/n re shear walls; engr has proposed fix: block edges & add full ht. sheathing at adjacent closet on int. side.
BLD-Conference8/9/20018/9/20018/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/9/2001 10:20:25 AM w/ Jim re shear panel deficiencies; letter or ? to come today or SWO.?
BLD-Conference8/6/20018/6/20018/6/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/6/2001 9:02:22 AM w/ bldr re c/n of 8-3-01
Plan resubmittals received  8/6/2001 DONE
Received plan resubmittals from CSHQA Architects, three sets of S-1 and S-2, forwarded same to Mike Phillips. 8/6/01 DAR
BLD-Framing/Rough-in8/3/20018/3/20018/3/2001PPART
DetailsCarl Dependahl
jim ###-#### nailing insp c/n; need clarify shear walls not to sill plates. 8/3/2001 5:16:23 PM
BLD-Framing/Rough-in7/30/20017/31/20017/31/2001ANR
DetailsDave Hannah
shear wall nailing Jim ###-####
BLD-Framing/Rough-in7/31/20017/31/20017/31/2001PFAIL
DetailsDave Hannah
Scheduled by Inspector: 425 On 7/31/2001 11:12:51 AM shear nailing
BLD-Framing/Rough-in7/19/20017/20/20017/20/2001PNR
DetailsRuss Owen
shear nailing reinspection Jim ###-####
BLD-Framing/Rough-in7/20/20017/20/20017/20/2001PNR
DetailsRuss Owen
SHEAR\\###-####
BLD-Framing/Rough-in7/19/20017/19/20017/19/2001PFAIL
DetailsJim Storey
###-#### wrond size nail for sheer nailling 7/19/2001 4:21:46 PM
BLD-Foundation6/29/20017/2/20017/2/2001APART
DetailsRuss Owen
steel slab jim ###-####.subject to s-i 7/2/2001 11:23:29 AM
CHANGE STATUS TO (ISS)  6/29/2001 DONE
Application received  6/28/2001 PASS
revised c1.2 plan with regrade on upper ends of sewer main approved
BLD-Foundation6/19/20016/20/20016/20/2001PPART
DetailsCarl Dependahl
###-#### walls, steel ok 6/20/2001 5:16:10 PM
BLD-Conference6/18/20016/18/20016/18/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/18/2001 11:52:21 AM w/bldr re c/n
BLD-Footing6/12/20016/12/20016/12/2001PPASS
DetailsTom Arcoraci
Jim ###-####
Inspection Record Card- Bld  6/5/2001 DONE
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
TOOK TO MIKE P
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permits ready
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 09:27:02 M_P - activity updated through activity BLDA022 from case BLD01-00594.
Routing Off Site - STRUCTURAL5/2/2001 5/14/2001 DONE
Routing - FIRE5/8/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. Contacted Chad Heimbigner requesting four additional copies. KMM Put the one copy I received in my hold box. KMM
Routing - PLAN CHECK5/8/2001 5/8/2001  
Routing - PLUMBING5/2/2001 5/8/2001 PASS
the two upper branches of the main sewer system must be regraded to achieve .60%, plumbing drawings P-2,P-4 resubmitted 5/3/01 are approved.
Plan resubmittals received  5/3/2001 DONE
Plumbing plan resubmittals receivedfrom CSHQA. 2 sheets each P-2 and P-4, forwarded same to Plumbing, Bill Vandergrift. %/3/01
Routing - PLAN CHECK4/17/2001 5/3/2001 DONE
Plan resubmittals received  5/1/2001 DONE
Received three copies of revised sheets A1.6, S1.1, S1.2, A6.1, A6.2 TWO COPIES OF REVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A5.1, A6.1, A6.2, AND P-1. FOUR COPIES OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
Routing - FIRE4/11/2001 4/17/2001 FAIL
HYDRANT FLOW
Plan Review Completed(1st rev)  4/17/2001 FAIL
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIL
Routing to fire.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing Off Site - STRUCTURAL3/15/2001 4/3/2001 FAIL
contacted pdq to take plans to outside eng. KMM
Additional information required for further review.
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
Approved by SAR and TKW (DRH00-239).
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001 PEND
Pending DR review
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Received Certificate of Value  3/12/2001 DONE
Application received  3/12/2001