Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00595
StatusFinaled
Name PARK APARTMENTS II
Site Address 1025 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "A-3" BUILDING * To construct a new two story, with basement and mezzanines 3,968 sq.ft. wood framed, 10 unit apartment building. The basement is 2,192 sq.ft and has four unit @ 548 sq.ft. each. The first floor is 2,532 sq.ft. and contains four units, two @ 548 sq.ft and two @ 604 sq.ft with a 114 sq.ft. mezzanine. The second floor is 1,436 sq.ft. and contains two units @ 604 sq.ft. with a 114 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/15/2015 DONE
Permanent Occupancy 6/7/20026/7/2002 DONE
Details
BLD-Final6/6/20026/7/20026/7/2002APASS
DetailsCarl Dependahl
ok 6/7/2002 11:32:53 AM
Permanent occupancy  6/7/2002 DONE
Perm. Occ. Cert. #9161 issued 6-7-02 to the Park Apartments II.
BLD-Final6/6/20026/6/20026/6/2002PNR
DetailsCarl Dependahl
Cathy has the card
BLD-Final6/3/20026/5/20026/5/2002PNR
DetailsCarl Dependahl
###-####
BLD-Final6/4/20026/4/20026/4/2002PNR
DetailsCarl Dependahl
keep c/n 6/4/2002 6:37:56 PM
Fee Review-notes3/14/20013/14/20014/18/2002 DONE
Case Summary (BLD)  4/4/2002  
BLD-Final3/25/20023/26/20023/26/2002APART
DetailsCarl Dependahl
###-#### keep c/n, has t/o 3/26/2002 11:01:06 AM
FIRE-Final Inspection3/25/20023/26/20023/25/2002APASS
DetailsRick Jackson
###-####
BLD-Final3/23/20023/25/20023/25/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/23/2002 at 12:56:45. Contact: ###-####. keep c/n re handrails 3/25/2002 10:34:44 AM
FIRE-Final Inspection3/23/20023/25/20023/25/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/23/2002 at 12:57:48. Contact: ###-####.
Temporary occupancy  3/25/2002 DONE
Temp. Occ. Cert. #4754 issued 3-25-02 to the Park Apts. II.
BLD-Final3/22/20023/22/20023/22/2002PFAIL
DetailsCarl Dependahl
###-#### dave c/n, stair rails.. 3/22/2002 6:22:22 PM
FIRE-Final Inspection3/22/20023/22/20023/22/2002PFAIL
DetailsRick Jackson
###-#### dave extinguishers and handrails 3/22/2002 3:28:31 PM
FIRE-Final Inspection3/21/20023/21/20023/21/2002PFAIL
DetailsRick Jackson
###-#### handrails and extinguishers 3/21/2002 4:22:03 PM
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Wall cover12/3/200112/3/200112/3/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/03/2001 at 10:46:48. Contact: ###-####.
BLD-Framing/Rough-in11/28/200111/29/200111/29/2001APART
DetailsRuss Owen
jeff ###-####
BLD-Framing/Rough-in11/28/200111/29/200111/29/2001APART
DetailsRuss Owen
jeff ###-####
BLD-Conference10/31/200111/1/200111/1/2001APASS
DetailsTom Arcoraci
JEFF ###-#### will recall for carl 11/1/2001 10:05:49 AM
BLD-Conference10/22/200110/22/200110/22/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/22/2001 4:02:14 PM w/arch re shear wall...need add'l stamped letter addressing sheathing not to sill
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Conference9/21/20019/21/20019/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/21/2001 2:48:36 PM rec'd detail re shear panels, reviewed w/ Carl W...called CSDI.
BLD-Conference8/20/20018/20/20018/20/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/20/2001 3:49:53 PM w/ arch re fresh air & shear walls... need eng's letter.
BLD-Conference8/10/20018/10/20018/10/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/10/2001 2:02:13 PM re shear walls, keep c/n, ok to continue pending eng's report
BLD-Conference8/9/20018/9/20018/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/9/2001 10:21:12 AM w/ supt.re shear c/n...fix on way or SWO??
BLD-Concrete7/10/20017/10/20017/10/2001PPASS
DetailsTom Arcoraci
BLD-Foundation6/26/20016/27/20016/27/2001PPART
DetailsCarl Dependahl
stem wall Jim ###-####; incl ret wall 6/27/2001 4:23:57 PM
BLD-Footing6/15/20016/18/20016/18/2001APART
DetailsCarl Dependahl
jim ###-#### perim ftgs/ ret wall ftgs...providde survey 6/18/2001 11:53:53 AM
BLD-Conference6/15/20016/15/20016/15/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/15/2001 8:39:11 AM called cont. re c/n issues w bld01-00603 & project.
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
TOOK TO MIKE P
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permit ready for pickup
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 09:31:35 M_P - activity updated through activity BLDA022 from case BLD01-00595.
Routing Off Site - STRUCTURAL5/2/2001 5/14/2001 DONE
Routing - FIRE5/8/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. Contacted Chad Heimbigner requesting 4 additonal copies. KMM
Plan resubmittals received  5/1/2001 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A1.6, S1.1, S1.2, A6.1, A6.2. TWO COPIES OF REVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A5.1, A6.1, A6.2, P-1. FOUR COPIES OF RESPONSE LETTER.
ROUTED TO MIKE P. KMM
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIL
Routing to fire.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing Off Site - STRUCTURAL3/15/2001 4/3/2001 FAIL
contacted pdq to take plans to outside eng. KMM
Additional information required for further review
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
Approved by SAR and TKW (DRH00-00239)
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001 DONE
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Application received  3/12/2001  
Print Pending Permit.LaserJet4  3/12/2001  
Received Certificate of Value  3/12/2001 DONE
Routing - PLUMBING5/2/2001