Type "A-10" BUILDING * To construct a new two story, with basement and mezzanines 3,968 sq.ft. wood framed, 10 unit apartment building. The basement is 2,192 sq.ft and has four unit @ 548 sq.ft. each. The first floor is 2,532 sq.ft. and contains four units, two @ 548 sq.ft and two @ 604 sq.ft with a 114 sq.ft. mezzanine. The second floor is 1,436 sq.ft. and contains two units @ 604 sq.ft. with a 114 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/15/2015 DONE
Permanent occupancy  7/18/2002 DONE
Perm. Occ. Cert. #9259 issued 7-18-02 to the Park Apts. II.
Permanent Occupancy 7/17/20027/17/2002 DONE
Details
BLD-Final7/17/20027/17/20027/17/2002PPASS
DetailsCarl Dependahl
dave; Phone #: ###-#### 7/17/2002 2:41:55 PM
Fee Review-notes3/14/20013/14/20015/23/2002 DONE
BLD-Final4/26/20024/26/20024/26/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/26/2002 at 08:12:13. Contact: ###-####. c/n rails, plbg, ok t/o 4/26/2002 5:05:52 PM
Temporary occupancy  4/26/2002 DONE
Temp. Occ. Cert. #4801 issued 4-26-02 to the Park Apts.
BLD-Final4/24/20024/25/20024/25/2002PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/24/2002 at 17:04:02. Contact: ###-####. cn issued not ready 4/25/2002 2:58:14 PM
FIRE-Final Inspection4/23/20024/24/20024/24/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/23/2002 at 15:38:38. Contact: ###-####.
BLD-Final4/23/20024/24/20024/24/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/23/2002 at 15:39:31. Contact: ###-####.
Code Occupancy Approval  4/11/2002 PASS
SIGNED FINAL AS WE ARE HOLDING LARGE BOND FOR LANDSCAPE.
Case Summary (BLD)  4/5/2002  
BLD-Wall cover1/31/20022/1/20022/1/2002APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/31/2002 at 18:04:32. Contact: .
2/1/2002 9:26:38 AM
BLD-Framing/Rough-in1/29/20021/30/20021/30/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/29/2002 at 17:35:32. Contact: ., c/n air seal stairs, stud shoes, etc 1/30/2002 5:33:41 PM
BLD-Aging Inspection12/24/200112/24/200112/27/2001 NR
DetailsCarl Dependahl
apts,wip 12/27/2001 8:56:55 AM
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Conference10/23/200110/23/200110/23/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/23/2001 9:00:25 AM w/ Otis L. at site re 1st fl shear walls...add'l eng'g req'd.
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Framing/Rough-in9/24/20019/25/20019/25/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/24/2001 at 17:11:29. Contact: ###-####. upper floor shear wall nailing ok 9/25/2001 10:28:04 AM
BLD-Framing/Rough-in9/19/20019/19/20019/19/2001PPART
DetailsCarl Dependahl
fr insp -dave shear 1st fl shear nailing ok. 9/20/2001 10:14:03 AM Still need eng's report re sheathing not to sill plates. 9/20/2001 10:21:48 AM
BLD-Framing/Rough-in9/10/20019/10/20019/10/2001PPART
DetailsCarl Dependahl
FR JIM ###-#### shear wall straps 1st to 2nd fl 9/10/2001 4:49:10 PM
BLD-Framing/Rough-in9/7/20019/7/20019/7/2001PPART
DetailsCarl Dependahl
###-#### remainder 1st fl shear ok 9/7/2001 3:27:50 PM
BLD-Framing/Rough-in9/5/20019/5/20019/5/2001PPART
DetailsCarl Dependahl
###-#### jim 1st fl shear ok 9/5/2001 3:44:15 PM
BLD-Foundation8/8/20018/8/20018/8/2001APART
DetailsCarl Dependahl
###-####; slab ok 8/8/2001 3:32:09 PM
BLD-Foundation7/26/20017/26/20017/26/2001PPASS
DetailsJim Storey
stem wall rebar ok 7/26/2001 9:26:01 AM
BLD-Footing7/5/20017/5/20017/5/2001PPASS
DetailsJim Storey
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
TOOK TO MIKE P
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permit ready for pickup
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 09:43:46 M_P - activity updated through activity BLDA022 from case BLD01-00600.
Routing - FIRE5/8/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. Contacted Chad Heimbigner requesting four additional copies. kmm
Plan resubmittals received  5/1/2001 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A1.6, S1.1, S1.2, A6.1, A6.2. TWO COPIES OF REVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A5.1, A6.1, A6.2, P-1. FOUR COPIES OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIL
Routing to fire.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing Off Site - STRUCTURAL3/15/2001 4/3/2001 FAIL
contacted pdq to take plans to outside eng. KMM
Additional information required for further review.
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
Approved by SAR and TKW (DRH00-00239)
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001 DONE
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Application received  3/12/2001  
Print Pending Permit.LaserJet4  3/12/2001  
Received Certificate of Value  3/12/2001 DONE