Permit Information
Permit NumberBLD01-00601
StatusFinaled
Name PARK APARTMENTS II
Site Address 1085 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "A-11" BUILDING * To construct a new two story, with basement and mezzanines 3,968 sq.ft. wood framed, 10 unit apartment building. The basement is 2,192 sq.ft and has four unit @ 548 sq.ft. each. The first floor is 2,532 sq.ft. and contains four units, two @ 548 sq.ft and two @ 604 sq.ft with a 114 sq.ft. mezzanine. The second floor is 1,436 sq.ft. and contains two units @ 604 sq.ft. with a 114 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/15/2015 DONE
Permanent occupancy  7/18/2002 DONE
Perm. Occ. Cert. #9258 issued 7-18-02 to the Park Apts. II.
Permanent Occupancy 7/17/20027/17/2002 DONE
Details
BLD-Final7/17/20027/17/20027/17/2002PPASS
DetailsCarl Dependahl
dave; Phone #: ###-####; rails ok per 7/17/2002 3:46:59 PM 408 7/17/2002 3:50:39 PM
Fee Review-notes3/14/20013/14/20015/23/2002 DONE
Temporary occupancy  5/15/2002 DONE
Temp. Occ. Cert. #4809 issued 5-15-02 to the Park Apts.
BLD-Final5/14/20025/14/20025/14/2002PPART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/14/2002 at 09:09:38. Contact: ###-####. ok for temp 5/14/2002 5:01:41 PM
BLD-Final5/11/20025/13/20025/13/2002PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/11/2002 at 12:49:59. Contact: ###-####. need complete rail & temp. glass install... 5/13/2002 2:06:58 PM
FIRE-Final Inspection5/9/20025/10/20025/10/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/09/2002 at 16:53:09. Contact: ###-####.
BLD-Final5/9/20025/10/20025/10/2002PFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 05/09/2002 at 16:53:44. Contact: ###-####. need plbg final...chk rails per ubc 1003 5/10/2002 4:05:32 PM
Code Occupancy Approval  4/11/2002 PASS
SIGNED TEMP ON THIS BUILDING AND WILL HOLD FOR ALL LANDSCAPE OF PROJECT, LARGE BOND HAD BEEN POSTED.
Case Summary (BLD)  4/5/2002  
PubWorks Occupancy Approval  4/3/2002 DONE
Project complete, OK to sign Permanent Occupancy. 04/03/02 S.Landaluce & R.Rokovitz
BLD-Wall cover2/22/20022/25/20022/25/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/22/2002 at 16:29:19. Contact: ###-####...see frame insp same date. 2/25/2002 2:10:28 PM
BLD-Framing/Rough-in2/25/20022/25/20022/25/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/25/2002 2:09:43 PM ok to insul; need verify int. gypsum shear panels when installed
BLD-Energy code compliance2/25/20022/25/20022/25/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/25/2002 2:10:53 PM walls ok to cover
BLD-Wall cover2/20/20022/21/20022/21/2002PNH
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/20/2002 at 11:47:51. Contact: ###-####.
BLD-Framing/Rough-in2/19/20022/20/20022/20/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/19/2002 at 12:05:55. Contact: ###-####., w.i.p. on stairs., ok to insul 2/21/2002 9:16:21 AM 2/21/2002 9:16:55 AM 2/21/2002 9:18:02 AM
BLD-Framing/Rough-in2/18/20022/19/20022/19/2002AFAIL
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/18/2002 at 18:25:32. Contact: ###-####. C/n, complete fireblocks, nail protectors, repair overbored or cut studs at wet walls, seal draft stops per UBC 708; add firestop pads at elec . boxes w/i 24" on tenant separation walls per 709. Stairs to be completed...check at final w/ rails. 2/19/2002 1:29:42 PM
BLD-Aging Inspection12/18/200112/18/200112/18/2001 NR
DetailsCarl Dependahl
apts, wip 12/18/2001 4:32:46 PM
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Framing/Rough-in10/16/200110/16/200110/16/2001PNR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/16/2001 at 08:19:15. Contact: ###-####... 10/16/2001 2:52:49 PM has c/n in effect w/ bld01-00531...shear walls. resolve prior to full frame approval. 10/16/2001 2:54:26 PM
BLD-Framing/Rough-in10/10/200110/11/200110/10/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 10/10/2001 at 11:13:44. Contact: ###-####. ext nailing ok 10/10/2001 4:39:32 PM
BLD-Conference10/10/200110/10/200110/10/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/10/2001 4:36:27 PM w/ new supt. Dave re c/n in effect for 1st fl shear walls
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Foundation8/23/20018/24/20018/24/2001APART
DetailsCarl Dependahl
###-####= JIM FD SLAB
BLD-Framing/Rough-in8/3/20018/3/20018/3/2001PPART
DetailsCarl Dependahl
re bar-- jim ###-####
BLD-Foundation7/18/20017/19/20017/19/2001PPASS
DetailsJim Storey
re-bar ###-####
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permit ready for pickup
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 10:01:21 M_P - activity updated through activity BLDA022 from case BLD01-00601.
Routing - FIRE5/8/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. Contacted Chad Heimgigner requesting four additional copies. KMM
Plan resubmittals received  5/1/2001 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A1.6, S1.1, S1.2, A6.1, A6.2, TWO COPIES OFREVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A5.1, A6.1, A6.2, P-1. FOUR COPIES OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIL
Routing to fire.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing Off Site - STRUCTURAL3/15/2001 4/3/2001 FAIL
contacted pdq to take plans to outside eng. KMM
Additional information required for further review.
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
Approved by SAR and TKW(DRH00-00239)
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001  
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Application received  3/12/2001  
Print Pending Permit.LaserJet4  3/12/2001  
Received Certificate of Value  3/12/2001 DONE