Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD01-00603
StatusFinaled
Name PARK APARTMENTS II
Site Address 1017 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "B-2" BUILDING * To construct a new two story, with basement and mezzanines 5,144 sq.ft. wood framed, 12 unit apartment building. The basement is 2,220 sq.ft and has two units @ 562 sq.ft and two units @ 548 sq.ft.each. The first floor is 2,220 sq.ft. and contains two units @ 562 sq.ft. and two units and 548 sq.ft. each. The second floor contains four units @ 615 sq.ft with a 116 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  10/16/2015 DONE
Should not have been changed to RDY. Passed its final back in 2002
Case Summary (BLD)  10/15/2015 DONE
Permit Ready to Issue  10/15/2015 DONE
Case Summary (BLD)  10/15/2015 DONE
BLD-Final6/6/20026/7/20026/7/2002APASS
DetailsCarl Dependahl
ok 6/7/2002 11:32:49 AM
Permanent Occupancy 6/7/20026/7/2002 DONE
Details
Permanent occupancy  6/7/2002 DONE
Perm. Occ. Cert. #9160 issued 6-7-02 to the Park Apartments II.
BLD-Final6/6/20026/6/20026/6/2002PNR
DetailsCarl Dependahl
Cathy has the card
BLD-Final6/3/20026/5/20026/5/2002PNR
DetailsCarl Dependahl
###-####
BLD-Final6/4/20026/4/20026/4/2002PNR
DetailsCarl Dependahl
keep c/n 6/4/2002 6:37:49 PM
Fee Review-notes3/14/20013/14/20014/18/2002 DONE
Case Summary (BLD)  4/5/2002  
BLD-Final3/25/20023/26/20023/26/2002APART
DetailsCarl Dependahl
###-#### keep c/n, has t/o 3/26/2002 11:00:54 AM
FIRE-Final Inspection3/25/20023/26/20023/25/2002APASS
DetailsRick Jackson
###-####
BLD-Final3/23/20023/25/20023/25/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/23/2002 at 12:54:55. Contact: ###-####...keep c/n re rails 3/25/2002 10:34:32 AM
FIRE-Final Inspection3/23/20023/25/20023/25/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/23/2002 at 12:55:44. Contact: ###-####.
BLD-Final3/25/20023/25/20023/25/2002PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/25/2002 11:37:09 AM ; keep c/n , ok for t/o. 3/25/2002 3:24:06 PM
Temporary occupancy  3/25/2002 DONE
Temp. Occ. Cert. #4753 issued 3-25-02 to the Park Apts. II.
FIRE-Final Inspection3/22/20023/22/20023/22/2002PFAIL
DetailsRick Jackson
dave ###-#### extinguishers and handrails 3/22/2002 3:28:16 PM
BLD-Final3/22/20023/22/20023/22/2002PFAIL
DetailsCarl Dependahl
###-#### dave c/n, rails, finals 3/22/2002 4:01:49 PM
FIRE-Final Inspection3/21/20023/21/20023/21/2002PFAIL
DetailsRick Jackson
###-#### handrails and extinguishers 3/21/2002 4:21:12 PM
BLD-Framing/Rough-in1/15/20021/15/20021/16/2002APART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/15/2002 9:32:45 AM frame ok exc for eng's report re shear wall configuration.
BLD-Aging Inspection1/15/20021/15/20021/15/2002 NR
DetailsCarl Dependahl
wip, apts. 1/15/2002 4:25:06 PM
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Framing/Rough-in11/14/200111/15/200111/15/2001AFAIL
DetailsCarl Dependahl
###-#### ken c/n: fireblox, hangers, joist blocking removed, etc ok to in 11/15/2001 11:58:20 AM pend hvac ok 11/15/2001 11:58:41 AM
BLD-Framing/Rough-in11/13/200111/14/200111/14/2001ANR
DetailsCarl Dependahl
###-####...need hvac 11/14/2001 4:59:25 PM
BLD-Aging Inspection11/12/200111/12/200111/12/2001 NR
DetailsCarl Dependahl
wip 11/12/2001 10:55:46 AM
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Framing/Rough-in9/11/20019/11/20019/11/2001PPART
DetailsCarl Dependahl
###-#### initial stair framing..ok to hold stringers back from bldg wall to allow siding. 9/11/2001 3:05:34 PM
BLD-Framing/Rough-in8/7/20018/7/20018/7/2001PPART
DetailsCarl Dependahl
jim ###-#### shear nail ; 1st, 2nd fl nailing ok, c/n re sheathing not to sill at retaining wall locations 8/7/2001 4:55:36 PM
BLD-Concrete7/10/20017/10/20017/10/2001PPASS
DetailsTom Arcoraci
BLD-Foundation6/26/20016/27/20016/27/2001PPART
DetailsCarl Dependahl
stem wall ###-#### Jim
BLD-Foundation6/21/20016/22/20016/22/2001APART
DetailsCarl Dependahl
###-#### ret walls , 6/25/2001 9:27:35 AM
BLD-Footing6/22/20016/22/20016/22/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/22/2001 1:33:41 PM perim ok
BLD-Conference6/18/20016/18/20016/18/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/18/2001 9:13:44 AM w/ otis re c/n
BLD-Conference6/15/20016/15/20016/15/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/15/2001 8:32:20 AM flood plain cert req'd
BLD-Footing6/13/20016/14/20016/14/2001PPART
DetailsCarl Dependahl
late pm ###-####; ftg 6/14/2001 6:11:34 PM
BLD-Conference6/14/20016/14/20016/14/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/14/2001 6:13:34 PM pre/con; c/n isued...energy,clarifications. flood plain
BLD-Footing6/12/20016/12/20016/12/2001PNR
DetailsTom Arcoraci
Jim ###-####
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
TOOK TO MIKE P
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permit ready
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 10:07:01 M_P - activity updated through activity BLDA022 from case BLD01-00603.
Routing - FIRE4/11/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. Contacted Chad Heimbigner requesting four additional copies. KMM
Plan resubmittals received  5/1/2001 DONE
RECEIVED THREE COPIES OF REVSIED SHEETS A1.6, S1.1, S1.2, A6.1, A6.2. TWO COPIES OF REVISED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A3.3, A5.1, A6.1, A6.2, P-1. FOUR COPIES OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIE
Routing to fire.
Routing Off Site - STRUCTURAL3/15/2001 4/11/2001 DONE
contacted pdq to take to outside eng. KMM
Additional information required for further review.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
approved by SAR and TKW DRH00-00239
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001 DONE
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Application received  3/12/2001  
Print Pending Permit.LaserJet4  3/12/2001  
Received Certificate of Value  3/12/2001 DONE