Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD01-00607
StatusFinaled
Name PARK APARTMENTS II
Site Address 1071 S DALE ST
Project NamePARK APARTMENTS II
Customer Number 
ePlanReviewNo
Description
Type "B-9" BUILDING * To construct a new two story, with basement and mezzanines 5,144 sq.ft. wood framed, 12 unit apartment building. The basement is 2,220 sq.ft and has two units @ 562 sq.ft and two units @ 548 sq.ft.each. The first floor is 2,220 sq.ft. and contains two units @ 562 sq.ft. and two units and 548 sq.ft. each. The second floor contains four units @ 615 sq.ft with a 116 sq.ft. mezzanine. All construction per the approved plans, attached comment list, CABO/ANSI A 117.1. DRH 00-00239 CUP 00-00136 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  10/15/2015 DONE
Permanent occupancy  7/18/2002 DONE
Perm. Occ. Cert. #9261 issued 7-17-02 to the Park Apts. II.
Permanent Occupancy 7/17/20027/17/2002 DONE
Details
BLD-Final7/17/20027/17/20027/17/2002PPASS
DetailsCarl Dependahl
dave; Phone #: ###-####
Fee Review-notes3/14/20013/14/20015/23/2002 DONE
BLD-Final4/26/20024/26/20024/26/2002PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/26/2002 at 08:11:21. Contact: ###-####. c/n rails, plbg ok for t/o 4/26/2002 5:06:41 PM
Temporary occupancy  4/26/2002 DONE
Temp. Occ. Cert. #4800 issued 4-26-02 to the Park Apts.
BLD-Final4/24/20024/25/20024/25/2002PFAIL
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/24/2002 at 17:02:58. Contact: ###-####. cn issued not ready 4/25/2002 2:58:27 PM
FIRE-Final Inspection4/23/20024/24/20024/24/2002APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/23/2002 at 15:36:50. Contact: ###-####.
BLD-Final4/23/20024/24/20024/24/2002ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 04/23/2002 at 15:37:38. Contact: ###-####.
Code Occupancy Approval  4/11/2002 PASS
SIGNED FINAL AS WE ARE HOLDING LARGE BOND FOR LANDSCAPE.
Case Summary (BLD)  4/5/2002  
BLD-Wall cover1/26/20021/28/20021/28/2002ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 01/26/2002 at 09:58:22. Contact: ###-####.
BLD-Energy code compliance1/28/20021/28/20021/28/2002PPASS
DetailsDave Hannah
Added by Inspector: 425 On 1/28/2002 4:47:41 PM walked project with carl dependahl insulation ok ok to cover still have issues with stairs and first level shear walls
BLD-Wall cover1/24/20021/25/20021/25/2002ACANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/24/2002 at 18:14:12. Contact: ###-####.
BLD-Framing/Rough-in1/25/20021/25/20021/25/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 407 On 1/25/2002 11:43:30 AM ...verify flood certs as req'd; no insp 1/25/2002 6:02:59 PM
BLD-Framing/Rough-in1/18/20021/22/20021/22/2002APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/18/2002 at 16:06:09. Contact: ###-####...need verify common stair dimensions. 1/22/2002 3:02:34 PM
BLD-Framing/Rough-in1/22/20021/22/20021/22/2002PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/22/2002 12:21:56 PM c/n,ext stairs, engs letter re gyp shear, verify flood certs recorded w/ city.
Case Summary (BLD)  12/6/2001  
Case Summary (BLD)  12/6/2001  
BLD-Aging Inspection11/28/200111/28/200111/28/2001 NR
DetailsCarl Dependahl
wip 11/28/2001 6:06:49 PM
Plan resubmittals received  10/10/2001 DONE
Recieved one copy of cover letter and information from Structural Eng. Routed to Carl D. kmm
Print Pending Permit.LaserJet4  10/5/2001  
BLD-Framing/Rough-in9/24/20019/25/20019/25/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/24/2001 at 17:10:12. Contact: ###-####. upper floors shear ok 9/25/2001 10:28:19 AM
BLD-Framing/Rough-in9/19/20019/19/20019/20/2001PPART
DetailsCarl Dependahl
fr insp -dave shear 1st fl shear nailing ok 9/20/2001 10:15:12 AM...Still need eng's report/details re: shear wall sheathing not continuous to sills; question regarding stud size,spacing as per T23-IV-B. at brg walls 1st fl. 9/20/2001 10:24:27 AM
BLD-Framing/Rough-in9/5/20019/5/20019/5/2001PPART
DetailsCarl Dependahl
###-#### jim 1st fl shear ok. 9/5/2001 3:44:41 PM
BLD-Framing/Rough-in8/3/20018/3/20018/3/2001PPART
DetailsCarl Dependahl
rebar insp --jim ###-####
BLD-Foundation7/26/20017/26/20017/26/2001PPASS
DetailsJim Storey
stem wall\\###-#### rebar ok 7/26/2001 9:26:20 AM
BLD-Footing7/5/20017/5/20017/5/2001PPASS
DetailsJim Storey
Inspection Record Card- Bld  6/5/2001 DONE
Print Occupancy Form  6/5/2001 DONE
Issue PAID IN FULL permit  6/4/2001 DONE
Routing - PLAN CHECK5/11/2001 5/25/2001 DONE
TOOK TO MIKE P
Plan Reviewer's activity  5/25/2001 PASS
Print Pending Permit.LaserJet4  5/25/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/25/2001 DONE
Case Summary (BLD)  5/25/2001 DONE
Inspection Record Card- Bld  5/25/2001 DONE
Print Occupancy Form  5/25/2001 DONE
Telephone call  5/25/2001 DONE
called permit ready for pickup
Plan assigned to (M_P)3/12/2001 5/25/2001 PASS
DetailsMike Phillips
5/25/2001 10:11:45 M_P - activity updated through activity BLDA022 from case BLD01-00607.
Routing - FIRE5/8/2001 5/11/2001 PASS
Plan resubmittals received  5/10/2001 DONE
Received one copy of revised sheet C1.2. Requested four additional copies
Plan resubmittals received  5/1/2001 DONE
RECEIVED THREE COPIES OF REVISED SHEETS A1.6, S1.1, S1.2, A6.1, A6.2. TWO COPIES OF REVSIED SHEETS A2.1, A2.2, A2.3, A2.4, A2.5, A3.1, A3.2, A5.1, A6.1, A6.2, P-1. FOUR COPIES OF RESPONSE LETTER. ROUTED TO MIKE P. KMM
Plan Reviewer's activity  4/11/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK4/4/2001 4/11/2001 FAIL
Routing to fire.
Routing Off Site - STRUCTURAL3/15/2001 4/11/2001 FAIL
contacted pdq to take plans to outside eng. KMM
Additional information required for further review.
Routing - PLUMBING3/30/2001 4/4/2001 FAIL
Routing - PARKS DEPARTME3/28/2001 3/30/2001 PASS
Routing - PLANNING3/20/2001 3/28/2001 PASS
Approved by SAR and TKW (DRH00-00239)
Routing - PUBLIC WORKS3/15/2001 3/20/2001 PASS
Plan routing begun/NEW & ADDTN  3/15/2001 DONE
Plans ACCEPTED BY PLAN TECH  3/15/2001 DONE
Recd Pcfee & Taken To Pln CK  3/14/2001 DONE
Application received  3/12/2001  
Print Pending Permit.LaserJet4  3/12/2001  
Received Certificate of Value  3/12/2001 DONE