Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00617
StatusFinaled
Name FAIRVIEW OFFICE PARK
Site Address 10020 W FAIRVIEW AVE
Project NameFAIRVIEW OFFICE PARK
Customer Number 
ePlanReviewNo
Description
To construct a new, two story, wood framed, 10,670 sq. ft. shell and core office building with elevator and restrooms on each floor. The first floor is 5,370 sq.ft and the second floor is 5,300 sq.ft. Each floor has four unfinished areas at 1,025 sq.ft each for rent. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. NOTE: This building is a shell and core only. To occupy the future office spaces permits and Certicicate of Occupancies are required to finish and occupying these spaces. MJP DRH00-00248 PC#199-01 MODIFICATION * 8/28/01 Change construction materials in the walls from wood studs to metal stud framing. All changes are per approved plans and structural engineer's calculations. MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Plan Reviewer's activity  10/16/2003  
While doing a T.I. remodel where a modification to the shear wall was involved, it was discovered that the actual second floor framing construction was not on record. It appears that after the Plan modification of steel floor framing, the inspector approved the floor framing to be constructed with wood as per the original plan. The floor framing was changed back to wood, however, the floor framing configuration resembles the steel floor framing plan with respect to floor joist directions/location and beam/column support locations. These structural changes were not reviewed in the office nor was another plan modification done. The inspector approved these conditions in the field but no subsequent plan was scanned into the Records Department. I have obtained a copy of the as-built plans approved in the field and have forwarded them to the Records Department.
Fee Review-notes3/12/20013/12/20018/21/2002 DONE
Letter of compliance  8/15/2002 DONE
Letter of Compliance #22562 issued 8-14-02.
BLD-Final5/14/20025/14/20025/14/2002PPASS
DetailsDave Hannah
###-#### VAL
BLD-Final5/13/20025/13/20025/13/2002PCANC
DetailsRuss Owen
###-####
Code Occupancy Approval5/13/20025/13/20025/13/2002PDONE
DetailsWm. Michael Meloy
Signed off 5/14/2002 11:46:32 AM
Code Occupancy Approval  5/13/2002 PASS
FIRE-Final Inspection5/10/20025/10/20025/10/2002PPASS
DetailsTroy Cobbley
fire life/safety finaled 5/13/2002 8:01:47 AM
BLD-Final5/7/20025/8/20025/8/2002ANR
DetailsDave Hannah
###-####
BLD-Final5/7/20025/8/20025/8/2002ACANC
DetailsDave Hannah
###-#### Gave back to Dave. 5/8/2002 11:15:44 AM
FIRE-Final Inspection5/1/20025/2/20025/2/2002PFAIL
DetailsTroy Cobbley
elevator recall did not work, change door hardware to ADA approved type, remove thumbturn and put up sticker on main exit, provide fire extinguisher, relocate 2nd floor smoke detector to deck, verify need for "knox box". Approved plan notes are missing. Notified Val that there may be other items on the notes that will need addressing 5/2/2002 3:30:18 PM
FIRE-Final Inspection5/1/20025/2/20025/2/2002ACANC
DetailsTroy Cobbley
duplicate inspection 5/2/2002 2:04:38 PM
BLD-Framing/Rough-in4/1/20024/1/20024/1/2002PPART
DetailsDave Hannah
###-#### VALc/n on site 4/1/2002 3:02:48 PM
BLD-Conference2/1/20022/1/20022/1/2002PDONE
DetailsDave Hannah
###-####
BLD-Conference1/23/20021/23/20021/23/2002PDONE
DetailsDave Hannah
Added by Inspector: 425 On 1/23/2002 3:47:16 PM Bob A Val and myself disscussed 1hr wall on east side of building
BLD-Energy code compliance1/17/20021/18/20021/18/2002APASS
DetailsDave Hannah
###-####
BLD-Framing/Rough-in1/15/20021/16/20021/16/2002APART
DetailsDave Hannah
fr insp chris ###-#### trusses are ok draft stop ok freaming ok needs hangers for sec floor south end have to check 1hr ext wall 1/16/2002 12:57:10 PM
BLD-Framing/Rough-in1/11/20021/11/20021/11/2002PFAIL
DetailsDave Hannah
###-#### didnt do a c/n to much all the truss supports not in all the 2ply truss not nailed no supprots under ends of beams and grider trusses hangers missing or not nailed beam straping need eng on inter shear wall draft stoppes in attic 1/11/2002 3:37:16 PM
BLD-Framing/Rough-in1/9/20021/10/20021/10/2002ANR
DetailsTom Arcoraci
###-####
BLD-Aging Inspection12/24/200112/24/200112/24/2001 DONE
DetailsDave Hannah
W.I.P 12/24/2001 10:14:36 AM
BLD-Framing/Rough-in10/23/200110/24/200110/24/2001APASS
DetailsDave Hannah
shear insp --val ###-#### OK TO COVER EXT WALLS 10/24/2001 10:35:20 AM
BLD-Framing/Rough-in10/16/200110/17/200110/17/2001AFAIL
DetailsDave Hannah
###-#### after 9am shear nailing on southwall need rfi from engineer 10/17/2001 12:26:42 PM
BLD-Footing8/29/20018/29/20018/29/2001PPASS
DetailsDave Hannah
###-####
BLD-Conference8/29/20018/29/20018/29/2001PDONE
DetailsDave Hannah
val-- ###-#### for conf we are going back to org city approved plans for wood framing 8/29/2001 3:25:51 PM
Override - Parcel Holds  8/29/2001  
Plan assigned to (M_P)8/16/2001 8/28/2001 PASS
DetailsMike Phillips
8/28/2001 11:43:59 M_P - activity updated through activity BLDA022 from case BLD01-00617.
Plan Reviewer's activity  8/28/2001 PASS
MODIFICATION * Plan modification complete and approved.
Override - Parcel Holds  8/28/2001  
Print Pending Permit.LaserJet4  8/28/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/28/2001 DONE
Case Summary (BLD)  8/28/2001 DONE
Print Occupancy Form  8/28/2001 DONE
Telephone call  8/28/2001 DONE
called applicant gave dollar amount
BLD-Footing8/22/20018/22/20018/22/2001PPASS
DetailsDave Hannah
okay by mike phillups to do footing inspection val ###-#### columns and ext stairs footings 8/22/2001 4:07:12 PM
Override - Parcel Holds  8/22/2001  
CHANGE STATUS TO (PND)  8/15/2001 DONE
Additional plans submitted  8/15/2001 PEND
Plan modification with new structural plans submitted for review. New PC#01-669 assigned for Modification. Routing plans to Mike Phillips per directions from Marlene.
BLD-Footing8/7/20018/7/20018/7/2001PPASS
DetailsDave Hannah
for elevator ###-####
BLD-Footing7/31/20018/1/20018/1/2001ANR
DetailsRuss Owen
Scheduled by a contractor via Hello! on 07/31/2001 at 16:27:10. Contact: ###-####. 11am boards only 1/2 up. i reschedualed this myself. 8/1/2001 11:13:48 AM
BLD-Footing8/1/20018/1/20018/1/2001PPASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/1/2001 11:53:22 AM walls. 8/1/2001 4:13:08 PM
BLD-Footing7/26/20017/27/20017/27/2001APASS
DetailsDave Hannah
###-####
BLD-Footing7/25/20017/26/20017/26/2001ACANC
DetailsDave Hannah
###-#### cancelled by val
(F) Reprint permit  7/16/2001 DONE
Issue PAID IN FULL permit  7/13/2001 DONE
CHANGE ISSUED DATE  7/13/2001 DONE
Plan assigned to (M_P)4/4/2001 7/11/2001 PASS
DetailsMike Phillips
7/11/2001 10:32:29 M_P - activity updated through activity BLDA022 from case BLD01-00617.
Routing - PLAN CHECK7/9/2001 7/11/2001 DONE
Plan Reviewer's activity  7/11/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  7/11/2001 DONE
Inspection Record Card- Bld  7/11/2001 DONE
Print Occupancy Form  7/11/2001 DONE
Telephone call  7/11/2001 DONE
LEFT MESS THAT PERMIT IS READY
Routing - PLANNING7/6/2001 7/9/2001 PASS
Need to review new exterior stairs and approve locations.
Routing - PLAN CHECK5/7/2001 7/8/2001 PASS
Approved per DRH00-245 for P & Z.
Plan Reviewer's activity  7/6/2001 PEND
Routing back to planning for another review for exterior stairs.
Plan resubmittals received  6/28/2001  
Plan resubmittals received  6/28/2001 DONE
Plan resubmittals received from Daems & Myers Architectural Alliance, Inc., Richard DaemsTwo sets of resubmittals and small Documents, same forwarded to Mike Phillips. 6/28/01 DAR
Plan Reviewer's activity  6/7/2001 FAIL
Additional informaiton required for further review. Called andleft message for Richard Deams to call me and discuss item in his response.
Plan resubmittals received  6/6/2001 DONE
Plan resubmittals received from Daems & Myers Architectural alliance Inc.Two sets of sheets T, A7, A8, A9 and small documents, forwarded same to Mike Phillips. 6/6/01 DAR
Plan Reviewer's activity  5/24/2001 FAIL
Additional information required for further review.
Routing - FIRE5/2/2001 5/7/2001 PASS
Routing - PLANNING4/26/2001 5/2/2001 PASS
Approved per DRH00-248, and as noted on sheet C1.
Routing - PLAN CHECK4/26/2001 5/2/2001  
Plan resubmittals received  4/30/2001 DONE
Received two sets 0f plan resubmittals from Daens & Myers Architectural Alliance, Inc. A & E sheets. forwarded same to Mike Phillips. 4/30/01 DAR
Routing - PLUMBING4/23/2001 4/26/2001 PASS
Route to fire when out of plumb. water service and branch line to urinals must be increased to 1 1/4".
Routing - PLAN CHECK4/11/2001 4/23/2001  
Routing to fire, planning and plumbing for follow up review.
Plan resubmittals received  4/19/2001 DONE
Received four copies of revised sheets. TC1, A3, A4, A6,A7, A8, A10,A12, S1, S3, S4, P1, P2, SP2. One copy of letter to Fire, one copy of response to comments, one copy of response to plumb. Routed to Mike P. KMM Some sheets not stamped or signed. KMM
Routing - FIRE4/5/2001 4/11/2001 FAIL
hydrant flow & location
Plan Review Completed(1st rev)  4/11/2001 FAIL
Plan Reviewer's activity  4/5/2001 FAIL
Additional information required for further review.
Routing - PLAN CHECK3/29/2001 4/5/2001 FAIL
Routing to fire.
Plan assigned to (JCM)3/14/2001 4/4/2001  
DetailsJohn Menard
Assigned to Mike Phillips. JCM
Routing - PLUMBING3/27/2001 3/29/2001 FAIL
fixture schedule lists a 3" waste for the janitor sink, your isometric shows 1 1/2" waste, with the drinking fountain wet venting into the janitor sink, min. wet vent is 2". wet venting is limited to fixtures on the same level, your isometric shows numberous 2nd. floor wet venting, provide waste stacks for 2nd. floor fixtures and venting for all fixtures. provide a plan showing location and sizing for the potable water system, include premis protection and thermol expantion protection. provide a plan showing the size and location of the water service piping, detail 5 page P-1- water heater pan is not an approved location for water heater T&P drain, pipe to janitor sink or to exterior.
Routing - PLANNING3/21/2001 3/27/2001 FAIL
Plans do not comply with DRH00-248, conditions #1b and 1e.
Routing Off Site - STRUCTURAL3/14/2001 3/27/2001 PASS
contacted PDQ to take plans to outside eng. KMM
No further review required. mjp
Routing - PUBLIC WORKS3/19/2001 3/21/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/19/2001 DONE
Plan resubmittals received  3/15/2001 FAIL
Received six copies of civil sheets, however they were not stamped or signed. Contacted Lynn of Barnett structures to let him know. He stated I should have by Mon. 3/19/01
Plans ACCEPTED BY PLAN TECH  3/14/2001 HOLD
Requires five stamped and signed civil sheets. Sterling hoped to have them to me by 3/14/01. I contacted Kristi of Deams & Myers Arch. requesting stamped and signed civil sheets. Plans in my hold box. KMM
Additional plans submitted  3/14/2001 DONE
Received third set of plans for outside eng. KMM
Received Certificate of Value  3/12/2001 DONE
Application received  3/12/2001  
Routing - PLAN CHECK8/15/20018/15/2001  PEND
DetailsMike Phillips
PLAN MODIFICATION - STRUCTURAL