Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD01-00623
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMICRON GAS SYSTEM
Customer NumberPCS3517
ePlanReviewNo
Description
MICRON - ADDITIONAL HOUSE GAS SYSTEMS (PCS #00-20003517) - TO CONSTRUCT A 2640 SQ. FT. REINFORCED CONCRETE PAD TO SUPPORT THREE HELIUM STORAGE TRAILERS, A 1590 SQ. FT. REINFORCED CONCRETE PAD TO SUPPORT (2) 8'-0" DIAMETER ARGON TANKS AND (2) 10'-0" DIAMETER NYDROGEN TANKS AND RELATED EQUIPMENT AND A 720 SQ. FT. REINFORCED CONCRETE DELIVERY TRUCK PAD. THE STORAGE PADS WILL BE ENCLOSED BY A 6'-0" HIGH CHAIN LINK FENCE. THIS PERMIT IS ALSO TO CONSTRUCT APPROXIMATELY 45 LINEAL FEET OF 4' X 4' CONCRETE REINFORCED BELOW GRADE PIPE TUNNEL, AS WELL AS, (7) 9 FOOT HIGH PIPE SUPPORTS FOR OVERHEAD PIPE RACKS. THIS PERMIT ALSO COVERS THE CONSTRUCTION OF A NEW ACCESS DOOR AND MASONRY WALL TO CREATE A NEW 195 SQ. FT., ANALYTICAL ROOM WITHIN AN EXISTING STRUCTURE. THIS ANALYTICAL ROOM IS BEING CREATED BY ENCLOSING EXISTING CONCRETE SUPPORT WALL THAT SUPPORT AND EXISTING 2785 SQ. FT. ELEVATED REINFORCED CONCRETE SLAB. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS ON FILE. PC #0196-01 JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection1/14/20031/14/20031/14/2003 PASS
DetailsJim Storey
sign off card being faxed . final ok 1/14/2003 9:19:39 AM 1/14/2003 9:20:20 AM
Letter of compliance  1/14/2003 DONE
Letter of Compliance #22803 issued 1-14-03.
BLD-Final12/4/200112/5/200112/5/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/04/2001 at 15:56:32. Contact: ###-####.
FIRE-Final Inspection11/27/200111/28/200111/28/2001PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/27/2001 at 17:04:41. Contact: ###-####.
BLD-Aging Inspection8/29/20018/29/20018/29/2001 PASS
DetailsJim Storey
tanks being set work in progess 8/31/2001 9:59:06 AM
(F) Reprint permit  8/3/2001 DONE
(F) Reprint permit  8/3/2001 DONE
BLD-Aging Inspection6/19/20016/19/20016/19/2001 FAIL
DetailsJim Storey
ernie is following up as to job supper for permit. 6/19/2001 1:35:12 PM
BLD-Footing4/19/20014/19/20014/19/2001PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/19/2001 at 07:25:59. Contact: ###-####. placed with special insp.pending report. 4/19/2001 3:04:02 PM
BLD-Footing4/16/20014/17/20014/17/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/16/2001 at 15:40:00. Contact: ###-####. placed with special insp. 4/17/2001 11:11:06 AM
BLD-Footing4/12/20014/13/20014/13/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/12/2001 at 09:27:35. Contact: ###-####.
Issue & PRINT to be Invoiced  3/30/2001 DONE
Plan assigned to (JCM)3/13/2001 3/29/2001 PASS
DetailsJohn Menard
3/29/01 08:00:52 JCM - activity updated through activity BLDA022 from case BLD01-00623.
Routing - PLAN CHECK3/22/2001 3/29/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/29/2001 PASS
Inspection Record Card- Bld  3/29/2001 DONE
Print Occupancy Form  3/29/2001 DONE
Telephone call  3/29/2001 DONE
called Paul and left a message permit ready for pickup
Plan resubmittals received  3/28/2001 PASS
Received requested additional information and structural calculations. JCM
Plan Reviewer's activity  3/27/2001  
Received e-mail response from Paul Marcolina, it was incomplete. I e-mailed Paul Marcolina requesting additional information and structural calculations for this project. JCM
Routing - FIRE3/21/2001 3/22/2001 PASS
Plan Review Completed(1st rev)  3/22/2001 FAIL
Routing - PLAN CHECK3/21/2001 3/21/2001 FAIL
Routing - PLUMBING3/14/2001 3/21/2001 PASS
post new 3/4" hose bib "non-potable water - do not drink".
Plan resubmittals requested  3/21/2001 FAIL
E-mailed Paul Marcolina, at Micron, requesting additional information required to complete the plan review. JCM
Routing - PLANNING3/14/2001 3/14/2001 PASS
Routing - PUBLIC WORKS3/13/2001 3/14/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/13/2001 DONE
First Notice3/12/20013/12/20013/12/2001 DONE
Application received  3/12/2001