Permit Information
Permit NumberBLD01-00645
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1458 S LOGGERS POND PL
Project NameRIVER QUARRY APARTMENTS II
Customer Number 
ePlanReviewNo
Description
BUILDING # 21, TYPE II, 12 UNITS * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. THE FIRST FLOOR CONTAINS 4-ONE BEDROOM, ONE BATHROOM @ 790 SQ.FT EACH WITN 2684 SQ.FT OF GARAGE AREA. THE SECOND FLOOR CONTAINS 3-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH. 1- THREE BEDROOM TWO BATHROOM UNIT @ 1344 SQ.FT. THE THIRD FLOOR CONTAINS 3-TWO BEDROOM TWO BATHROOM UNIT @ 1146 SQ.FT. EACH AND 1-THREE BEDROOM TWO BATHROOM UNIT AT 1344 SQ.FT. THE FIRST FLOOR IS APPROXIMATELY 3160 SQ.FT. FOR LIVING AREA THE SECOND FLOOR IS APPROXIMATELY 4782 SQ.FT. OF LIVING AREA THE THIRD FLOOR IS APPROXIMATELY 4782 SQ.FT. FOR LIVING AREA. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING MUST BE FIRE SPRINKLERED TO MEET NFPA 13-R. MJP (P.C.#0230-01 ) DRH 01-0006 & CUP # 00-154
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/7/20037/7/20037/7/2003 DONE
There was no fire fee charged.
Additional values from subcontractors.
Case Summary (BLD)  4/2/2003  
Permanent occupancy  7/3/2002 DONE
Perm. Occ. Cert. #9240 issued 7-3-02 to the River Quarry Apts., Bldg. #21.
Permanent Occupancy 6/28/20026/28/2002 DONE
Details
BLD-Final6/27/20026/28/20026/28/2002AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/27/2002 at 14:00:51. Contact: ###-####.
FIRE-Final Inspection6/28/20026/28/20026/28/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 6/28/2002 2:00:11 PM
BLD-Final6/28/20026/28/20026/28/2002PPASS
DetailsJim Storey
final ok
Code Occupancy Approval6/28/20026/27/20026/27/2002APASS
DetailsWm. Michael Meloy
FIRE-Final Inspection6/13/20026/14/20026/14/2002AFAIL
DetailsRick Jackson
###-#### frank need canopies for fire sprinklers 6/14/2002 11:07:07 AM
FIRE-Final Inspection6/12/20026/13/20026/13/2002PFAIL
DetailsRick Jackson
FRANK ###-#### need fire zones defined to monitoring company; canopies on fire sprinklers; heater in riser room 6/13/2002 3:57:37 PM
BLD-Energy code compliance4/8/20024/9/20024/9/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/08/2002 at 11:30:02. Contact: ###-####.
BLD-Framing/Rough-in4/8/20024/9/20024/9/2002APASS
DetailsJim Storey
out of time.
BLD-Framing/Rough-in4/5/20024/8/20024/8/2002PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/05/2002 at 08:09:10. Contact: ###-####.
BLD-Energy code compliance4/2/20024/3/20024/3/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2002 at 14:40:27. Contact: ###-####. c/n made ok 2 nd 3rd floors ok for cover. 4/3/2002 3:29:05 PM
BLD-Energy code compliance4/2/20024/3/20024/3/2002PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/02/2002 at 14:40:27. Contact: ###-####.
BLD-Framing/Rough-in4/1/20024/2/20024/2/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/01/2002 at 08:29:21. Contact: ###-####. 2nd and third floor ok to insulate/ fire stop pipe hangers/ one ceilling patch and dryer vent framing protectin. 4/2/2002 10:17:12 AM
FIRE-Final Inspection3/22/20023/22/20023/22/2002PFAIL
DetailsRick Jackson
frank- ###-#### fire fn need supervisory signal at panel 3/22/2002 4:50:12 PM
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PASS
DetailsJim Storey
wip 10/22/2001 9:32:08 AM
BLD-Foundation8/17/20018/20/20018/20/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/17/2001 at 11:16:31. Contact: ###-####. covered with special insp. 8/20/2001 8:20:07 AM
BLD-Footing7/11/20017/12/20017/12/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 07/11/2001 at 10:00:41. Contact: ###-####...bar in place; ok pend spec insp report; Strata onsite. 7/12/2001 11:10:42 AM
Issue PAID IN FULL permit  6/12/2001 DONE
Plan assigned to (M_P)3/14/2001 6/6/2001 PASS
DetailsMike Phillips
6/6/2001 09:45:52 M_P - activity updated through activity BLDA022 from case BLD01-00645.
Plan Reviewer's activity  6/6/2001 PASS
Print Pending Permit.LaserJet4  6/6/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/6/2001 DONE
Print Occupancy Form  6/6/2001 DONE
Inspection Record Card- Bld  6/6/2001 DONE
Print Occupancy Form  6/6/2001  
Inspection Record Card- Bld  6/6/2001 DONE
Telephone call  6/6/2001 DONE
PERMIT READY
Routing - FIRE5/14/20015/15/20015/15/2001 PASS
DetailsBill Alexander
Plan Reviewer's activity  5/14/2001 FAIL
Additional information required for further review
Routing - PLAN CHECK4/11/2001 5/14/2001 FAIL
Routing to fire.
Routing - PLUMBING4/6/2001 4/11/2001 PASS
provide a cleanout at the base of each waste or soil stack, 12 unit water system isometric didn't show clothes washers on the 2nd or 3rd floors, 16 page P4.0 - use approved material for inside the building, install main water risers in warm wall, pipe water heater drip pan drains to exterior individually, water piping in exterior walls for kitchen sinks must be protected from freezing.
Routing - PLANNING3/29/2001 4/4/2001 FAIL
Routing - PARKS DEPARTME3/22/2001 3/28/2001 PASS
Routing - PUBLIC WORKS3/20/2001 3/22/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/20/2001 DONE
Application received  3/14/2001  
Print Pending Permit.LaserJet4  3/14/2001