Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00653
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1508 S LOGGERS POND PL
Project NameRIVER QUARRY APARTMENTS II
Customer Number 
ePlanReviewNo
Description
BUILDING # 25 (SECTION 1 OF 2) A TWO HOUR AREA SEPARATION WALL WILL BE USED TO DIVIDE THIS 24 UNIT TYPE III BUILDING INTO TWO SEPARATE BUILDINGS. * TO CONSTRUCT A NEW THREE STORY, WOOD FRAMED, TYPE V ONE-HOUR, 12 UNIT APARTMENT BUILDING. EACH FLOOR IS APPROXIMATELY 3,078 SQ.FT. AND CONTAINS FOUR UNITS, 2-TWO BEDROOMS, ONE BATHROOM UNITS @ 954 SQ.FT EACH AND 2-ONE BEDROOM ONE BATHROOM @ 585 SQ.FT. EACH. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. NOTE: THIS BUILDING IS FIRE SPRINKLERED PER NFPA 13-R. MJP (P.C.#0235-01 ) REFER TO BLD 01-00654 FOR OTHER SECTION OF THIS BUILDING.DRH 01-0006 & CUP # 00-154
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/7/20037/7/20037/7/2003 DONE
No fire review fee was charged.
Case Summary (BLD)  4/2/2003  
Permanent occupancy  5/17/2002 DONE
Perm. Occ. Cert. #9141 issued 5-17-02 to the River Quary Apartments.
FIRE-Final Inspection5/3/20025/6/20025/6/2002ACANC
DetailsRick Jackson
FIRE FN- FRANK- ###-#### completed on 5/3/02 5/6/2002 8:32:13 AM
FIRE-Final Inspection5/3/20025/3/20025/3/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/3/2002 4:29:08 PM
BLD-Final5/2/20025/3/20025/3/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/02/2002 at 16:20:34. Contact: ###-####. final ok 5/3/2002 5:11:38 PM
Permanent Occupancy 5/3/20025/3/2002 DONE
Details
Code Occupancy Approval  4/26/2002 PASS
FIRE-Final Inspection4/24/20024/25/20024/25/2002AFAIL
DetailsRick Jackson
###-#### sound level in bedrooms below 70 DB 4/25/2002 11:27:15 AM
BLD-Energy code compliance1/17/20021/18/20021/18/2002PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/17/2002 at 11:49:18. Contact: ###-####.
BLD-Energy code compliance1/18/20021/18/20021/18/2002APASS
DetailsRuss Owen
Scheduled by a contractor via Hello! on 01/18/2002 at 07:19:16. Contact: ###-####.
BLD-Framing/Rough-in1/14/20021/15/20021/15/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 01/14/2002 at 16:50:33. Contact: ###-####.
BLD-Aging Inspection10/15/200110/15/200110/15/2001 PASS
DetailsJim Storey
wip 10/15/2001 8:36:48 AM
BLD-Concrete8/14/20018/15/20018/15/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 08/14/2001 at 12:41:59. Contact: ###-####. placed w/special insp. 8/15/2001 11:58:30 AM
BLD-Foundation7/26/20017/27/20017/27/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/26/2001 at 08:04:51. Contact: ###-####. placed with special insp. pending report. 7/27/2001 11:42:41 AM
BLD-Footing6/28/20016/29/20016/29/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/28/2001 at 11:48:50. Contact: ###-####. placed with specl insp. 6/29/2001 9:13:38 AM
Issue PAID IN FULL permit  6/12/2001 DONE
Plan Reviewer's activity  6/6/2001 PASS
Print Pending Permit.LaserJet4  6/6/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/6/2001 DONE
Print Occupancy Form  6/6/2001 DONE
Inspection Record Card- Bld  6/6/2001 DONE
Telephone call  6/6/2001 DONE
PERMIT READY
Plan assigned to (M_P)3/14/2001 6/6/2001 PASS
DetailsMike Phillips
6/6/2001 09:58:50 M_P - activity updated through activity BLDA022 from case BLD01-00653.
Routing - FIRE5/14/20015/15/20015/15/2001 PASS
DetailsBill Alexander
Plan Reviewer's activity  5/14/2001 FAIL
Additional information required for further review
Routing - PLAN CHECK4/11/2001 5/14/2001 FAIL
Routing to fire.
Routing - PLUMBING4/6/2001 4/11/2001 DONE
provide a cleanout at the base of each waste or soil stack, 12 unit water system isometric didn't show clothes washers on the 2nd or 3rd floors, 16 page P4.0- use approved material for inside the building, install main water risers in warm wall, pipe water heater drip pan drains to exterior individually, water piping in exterior walls for kitchen sinks must be protedted from freezing.
Routing - PLANNING3/29/2001 4/4/2001 FAIL
Routing - PARKS DEPARTME3/22/2001 3/28/2001 PASS
Routing - PUBLIC WORKS3/20/2001 3/22/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/20/2001 DONE
Application received  3/14/2001  
Print Pending Permit.LaserJet4  3/14/2001