Permit Information
Permit NumberBLD01-00655
StatusFinaled
Name RAFANELLI AND NAHAS
Site Address 1452 S LOGGERS POND PL
Project NameRIVER QUARRY APARTMENTS II
Customer Number 
ePlanReviewNo
Description
To construct a new 640 sq.ft. maintenance building with restroom and office space. All construction per the approved plans and attached comment list. PC #0237-01 MJP DRH 01-0006 & CUP # 00-154
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent occupancy  7/3/2002 DONE
Perm. Occ. Cert. #9238 issued 7-3-02 to the River Quarry Apartments II, maintenance building.
BLD-Final6/17/20026/18/20026/18/2002APASS
DetailsJim Storey
###-#### mike
Permanent Occupancy 6/17/20026/17/2002 DONE
Details
BLD-Final6/12/20026/14/20026/14/2002AFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/12/2002 at 15:38:56. Contact: ###-####. fire stop/engery seal ele boxes. 6/14/2002 2:46:01 PM
FIRE-Final Inspection6/12/20026/12/20026/12/2002APASS
DetailsRick Jackson
Added by Inspector: 409 On 6/12/2002 11:01:16 AM
Code Occupancy Approval6/7/20026/7/20026/7/2002PPASS
DetailsWm. Michael Meloy
BLD-Framing/Rough-in5/1/20025/2/20025/2/2002APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/01/2002 at 16:19:16. Contact: ###-####. framing ok insulation ok 5/2/2002 11:32:27 AM
BLD-Aging Inspection10/8/200110/8/200110/8/2001 PASS
DetailsJim Storey
wip 10/8/2001 4:47:47 PM
BLD-Foundation8/7/20018/8/20018/8/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/07/2001 at 15:32:50. Contact: ###-####...ok pend report 8/8/2001 8:32:45 AM
BLD-Footing7/24/20017/25/20017/25/2001APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 07/24/2001 at 15:05:45. Contact: ###-####. placed with special insp. pending report. 7/25/2001 10:17:06 AM
(F) Reprint permit  6/13/2001 DONE
Issue PAID IN FULL permit  6/12/2001 DONE
Plan Reviewer's activity  6/6/2001 PASS
Print Pending Permit.LaserJet4  6/6/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/6/2001 DONE
Print Occupancy Form  6/6/2001 DONE
Inspection Record Card- Bld  6/6/2001 DONE
Telephone call  6/6/2001 DONE
PERMIT READY
Plan assigned to (M_P)3/14/2001 6/6/2001 PASS
DetailsMike Phillips
6/6/2001 10:03:23 M_P - activity updated through activity BLDA022 from case BLD01-00655.
Routing - FIRE5/14/20015/15/20015/15/2001 DONE
DetailsBill Alexander
Plan Reviewer's activity  5/14/2001 FAIL
Additional information required for further review
Routing - PLAN CHECK4/11/2001 5/14/2001 FAIL
Routing to fire.
Routing - PLUMBING4/6/2001 4/11/2001 PASS
provide a cleanout at the base of each waste or soil stack, 12 unit water system isometric didn't show clothes washers on the 2nd or 3rd floors, note 16 page P4.0- use approved material for inside the building, install main water risers in warm wall, pipe water heater drip pan drains to exterior insividually, water piping in exterior walls for kitchen sinks must be protected from freezing.
Routing - PLANNING3/29/2001 4/4/2001 FAIL
Routing - PARKS DEPARTME3/22/2001 3/28/2001 PASS
Routing - PUBLIC WORKS3/20/2001 3/22/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/20/2001 DONE
Application received  3/14/2001  
Print Pending Permit.LaserJet4  3/14/2001