BLD-Final | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | PASS |
Steven Webb
|
|
|
C. of C. #22470 issued. 7/22/2002 2:19:46 PM
|
DOC - Permit Finaled | 7/22/2002 | 7/22/2002 | 7/22/2002 | P | PASS |
Steven Webb
|
|
|
Finaled by inspector at 7/22/2002 2:20:50 PM
|
PostCard Mailed | | | 7/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Final | 12/6/2001 | 12/7/2001 | 12/7/2001 | A | FAIL |
Steven Webb
|
|
|
Garage code 4444 + enter. Terry ###-#### c/n issued--air seal needed behind elec. plates on exterior walls. 12/7/2001 9:48:38 AM
|
BLD-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | PART |
Steven Webb
|
|
|
wip 10/8/2001 10:11:17 AM
|
BLD-Aging Inspection | 8/7/2001 | 8/7/2001 | 8/7/2001 | | PART |
Steven Webb
|
|
|
wip 8/7/2001 8:32:01 AM
|
BLD-Wall cover | 6/7/2001 | 6/7/2001 | 6/7/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 07:20:40. Contact: . C/N issued-Do Not Cover 6/7/2001 8:42:03 AM
|
BLD-Wall cover | 6/7/2001 | 6/7/2001 | 6/7/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/07/2001 at 10:03:23. Contact: .
|
BLD-Framing/Rough-in | 6/6/2001 | 6/6/2001 | 6/6/2001 | P | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/06/2001 at 07:36:05. Contact: . C/N dated 6/5/02 items corrected. 6/6/2001 12:41:39 PM
|
BLD-Framing/Rough-in | 6/4/2001 | 6/5/2001 | 6/5/2001 | A | PART |
Steven Webb
|
|
|
###-#### c/n posted-ok to insulate. 6/5/2001 9:14:04 AM
|
BLD-Other | 5/30/2001 | 6/1/2001 | 6/1/2001 | P | CANC |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 07:32:28. Contact: . Cancelled by contractor--meant for shear, shear passed by Ins. 425 on 5/30/01 6/1/2001 2:08:42 PM
|
BLD-Other | 5/30/2001 | 5/31/2001 | 5/31/2001 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 05/30/2001 at 14:36:21. Contact: .
|
BLD-Other | 5/24/2001 | 5/25/2001 | 5/25/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/24/2001 at 20:18:02. Contact: . Prior c/n items not completed. Do not side. 5/25/2001 8:54:19 AM
|
BLD-Other | 5/23/2001 | 5/24/2001 | 5/24/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 05/23/2001 at 09:14:04. Contact: . C/N posted-- 5/24/2001 10:16:38 AM
|
BLD-Foundation | 4/18/2001 | 4/19/2001 | 4/19/2001 | A | PART |
Steven Webb
|
|
|
early am please Mike ###-#### wip 4/19/2001 12:09:55 PM
|
BLD-Footing | 4/17/2001 | 4/17/2001 | 4/17/2001 | P | PART |
Steven Webb
|
|
|
Randy ###-#### wip 4/17/2001 3:54:29 PM
|
Issue PAID IN FULL permit | | | 4/12/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 3/26/2001 | | DONE |
|
|
|
|
Telephone call | | | 3/26/2001 | | DONE |
|
|
|
left mess that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/23/2001 | | DONE |
|
|
|
|
Plan assigned to (SAM) | 3/21/2001 | | 3/23/2001 | | PASS |
Steve Munroe
|
|
|
3/23/2001 15:35:12 SAM - activity updated through activity BLDA022 from case BLD01-00657.
|
Plan Reviewer's activity | | | 3/21/2001 | | PEND |
|
|
|
3/21/01 15:30 Called and talked to Terry with Brighton. I informed him that I have questions on the footing sizes from the engineer and whether the attic trusses are three point bearing. He will get back with me.
3/22/01 13:30 Called and talked to Terry. I informed him that I will be out of the office next week.
3/23/01 15:00 Dale Swink called me and explained his calcs on the footings.
|
Print Pending Permit.LaserJet4 | | | 3/21/2001 | | |
|
|
|
|
Plan Review Report | | | 3/21/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 3/14/2001 | 3/14/2001 | 3/16/2001 | | PASS |
|
|
|
|
Pending Assignment by DJO | 3/14/2001 | | 3/16/2001 | | DONE |
Dan Overy
|
|
|
3/16/2001 13:08:56 LW - activity updated through activity BLDA169 from case BLD01-00657.
|
Routing - PLANNING | 3/14/2001 | 3/14/2001 | 3/15/2001 | | PASS |
|
|
|
|
Application received | | | 3/14/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 3/19/2001 | 3/19/2001 | | | PEND |
|
|
|
|