Case Summary (BLD) | | | 6/28/2016 | | |
|
|
|
|
Case Summary (BLD) | | | 6/28/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/28/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/28/2016 | | DONE |
|
|
|
|
BLD-Final | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Tony Young
|
|
|
JIM ###-####
|
DOC - Permit Finaled | 5/14/2002 | 5/14/2002 | 5/14/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 5/14/2002 2:50:00 PM
|
BLD-Final | 5/9/2002 | 5/9/2002 | 5/9/2002 | P | FAIL |
Dave Hannah
|
|
|
###-#### jim boyd for access openings in guardrails on balconie by columns over 4" as per 97 ubc section509.3 4" max 5/9/2002 4:01:07 PM
|
BLD-Other | 5/8/2002 | 5/8/2002 | 5/8/2002 | | DONE |
|
|
|
Check in the amount of $500 has been provided to cover grading requirements.
|
BLD-Grading Inspection | 5/7/2002 | 5/7/2002 | 5/7/2002 | | BOND |
Rita DeYoung
|
|
|
Final grading has been completed, but revegetation has not. Engineer has recomnmended a $500.00 bond to cover the cost of revegetation. Upon receipt of this bond the grading and drainage are conditionally approved.
|
FIRE-Final Inspection | 5/1/2002 | 5/2/2002 | 5/2/2002 | A | PASS |
Rick Jackson
|
|
|
jim ###-#### call first
|
FIRE-Final Inspection | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | FAIL |
Troy Cobbley
|
|
|
secure the power supply to outlet for alarms and lock valves on riser and backflow preventer 5/1/2002 1:38:11 PM
|
BLD-Conference | 2/12/2002 | 2/13/2002 | 2/13/2002 | A | PART |
Tony Young
|
|
|
###-#### JIMBOY
conf on hand rails 2/13/2002 1:57:02 PM
|
FIRE-Sprinkler Rough-in | 2/11/2002 | 2/12/2002 | 2/12/2002 | A | PART |
Troy Cobbley
|
|
|
Fire pump tested OK. Inspector to verify results with plan review. Other items on correction list not taken care yet 2/12/2002 3:02:18 PM
|
BLD-Conference | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PART |
Tony Young
|
|
|
###-####
conf. on handrail design 1/10/2002 9:58:37 AM
|
BLD-Conference | 11/16/2001 | 11/16/2001 | 11/16/2001 | P | PASS |
Tony Young
|
|
|
###-#### JIM
ok to cover 11/16/2001 4:04:23 PM
|
BLD-Energy code compliance | 11/14/2001 | 11/15/2001 | 11/15/2001 | P | PASS |
Tom Arcoraci
|
|
|
jim ###-####
|
Override - Parcel Holds | | | 11/14/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 11/9/2001 | 11/13/2001 | 11/13/2001 | P | PART |
Tony Young
|
|
|
###-#### JIM
c/n posted on inspection card, truss bracing and bearing on 2 ply 4 pt bearing, 2 other point loads,,, ok to insulate 11/13/2001 3:30:54 PM
|
Override - Parcel Holds | | | 11/9/2001 | | |
|
|
|
|
BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 | P | PASS |
Tony Young
|
|
|
###-####
conf. on draft stopping 10/5/2001 4:15:49 PM
|
Override - Parcel Holds | | | 10/5/2001 | | |
|
|
|
|
BLD-Framing/Rough-in | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PART |
Tony Young
|
|
|
shear panel ###-####
exterior shear ok 10/1/2001 3:30:11 PM
|
Override - Parcel Holds | | | 10/1/2001 | | |
|
|
|
|
BLD-Aging Inspection | 9/5/2001 | 9/5/2001 | 9/5/2001 | | PASS |
Tony Young
|
|
|
wip 9/5/2001 10:36:40 AM
|
BLD-Footing | 7/5/2001 | 7/6/2001 | 7/6/2001 | P | PART |
Tony Young
|
|
|
###-####
foundation , wip, verbal corrections 7/6/2001 1:01:11 PM
|
Override - Parcel Holds | | | 7/5/2001 | | |
|
|
|
|
BLD-Footing | 6/27/2001 | 6/28/2001 | 6/28/2001 | P | PART |
Tony Young
|
|
|
Lazaro ###-####
|
Override - Parcel Holds | | | 6/27/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/18/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/18/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 4/2/2001 | 4/2/2001 | 5/17/2001 | | PASS |
Dan Overy
|
|
|
5/17/2001 14:40:18 DJO - activity updated through activity BLDA022 from case BLD01-00662.
|
Plan Reviewer's activity | | | 5/17/2001 | | DONE |
|
|
|
received plans. approved by all other departments. ok to issue.
|
Plan Review Report | | | 5/17/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/17/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/17/2001 | | DONE |
|
|
|
|
Telephone call | | | 5/17/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLANNING | 3/15/2001 | 3/15/2001 | 5/8/2001 | | DONE |
|
|
|
Do not sign approved until the reduction in density survey removing lot line between lots 3 and 4 is recorded--per M. Southard (4/11/01) took to ashley r. 4/18/200/pe
The record of survey was recorded on May 2, 2001. abr
|
Routing - PUBLIC WORKS | 3/15/2001 | 3/15/2001 | 4/18/2001 | | DONE |
|
|
|
fees to be paid to north west sewer district. terry records took to dan o, to start review, ashley r. has a 10 day apeal period on it. when dan gets done will go back to terry r and continue routing. pe
|
Routing - PUBLIC WORKS GRADING | 3/15/2001 | 3/15/2001 | 4/17/2001 | | PASS |
Rita DeYoung
|
|
|
Revisions approved 4/17/01. Achd granted approval for driveway runoff to be discharged into ROW.
Grading plan must be revised.
Continue routing. took to terry records
|
Override - Parcel Holds | | | 4/3/2001 | | PASS |
|
|
|
dan did his review and took back to terry records 4/3/2001/pe
issue has been resolved.aem 5/16/01
|
Plans ACCEPTED BY PLAN CHECK | | | 4/2/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/2/2001 | | |
|
|
|
have started initial review on 4-2-01. cannot issue untill appeal period is over. will continue routing back to terry records.
|
Application received | | | 3/15/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/16/2001 | 5/16/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 3/15/2001 | | | | PEND |
Dan Overy
|
|
|
|