BLD-Conference | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | PASS |
Tony Young
|
|
|
JUST NEEDS TO BE DOC FINALED
|
DOC - Permit Finaled | 8/6/2002 | 8/6/2002 | 8/6/2002 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 8/6/2002 2:21:20 PM
|
PostCard Mailed | | | 7/13/2002 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
BLD-Final | 12/10/2001 | 12/10/2001 | 12/10/2001 | P | PASS |
Dave Hannah
|
|
|
###-#### c.c # 22017 issued 12/10/2001 12:58:15 PM
|
BLD-Grading Inspection | 11/15/2001 | 11/15/2001 | 11/15/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading has been completed according to the approved plan.
|
BLD-Aging Inspection | 10/17/2001 | 10/17/2001 | 10/17/2001 | | PART |
Tony Young
|
|
|
wip 10/17/2001 9:51:25 AM
|
BLD-Energy code compliance | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PASS |
Steven Webb
|
|
|
scott ###-#### OK TO COVER-- 8/17/2001 12:57:08 PM
|
BLD-Framing/Rough-in | 8/9/2001 | 8/9/2001 | 8/9/2001 | P | PART |
Tony Young
|
|
|
###-#### scott
verbal corrections on straps, fireblocks, post under truss, sheet rock shear, sheet rock backside of elec. panel, ok to insulate. 8/9/2001 3:10:35 PM
|
BLD-Other | 7/16/2001 | 7/16/2001 | 7/16/2001 | P | PASS |
Tony Young
|
|
|
mark -###-####- to put up gar doors
ok to sheet rock around garage doors, part of lid for doors 7/16/2001 2:29:54 PM
|
BLD-Framing/Rough-in | 7/2/2001 | 7/2/2001 | 7/2/2001 | P | PART |
Tony Young
|
|
|
Mark ###-####
c/n posted, ext nailing ok/// verify hold downs and eng. fix at frame insp. 7/2/2001 2:13:12 PM
|
BLD-Aging Inspection | 6/25/2001 | 6/25/2001 | 6/25/2001 | | PASS |
Tony Young
|
|
|
wip 6/25/2001 9:41:06 AM
|
BLD-Foundation | 4/23/2001 | 4/23/2001 | 4/23/2001 | P | PART |
Carl Dependahl
|
|
|
###-####...steel in place, ok to set hds 4/23/2001 3:08:16 PM
|
Override - Parcel Holds | | | 4/23/2001 | | |
|
|
|
|
BLD-Footing | 4/17/2001 | 4/18/2001 | 4/18/2001 | A | PART |
Tony Young
|
|
|
###-#### KEVIN
|
Override - Parcel Holds | | | 4/17/2001 | | |
|
|
|
|
Telephone call | | | 4/10/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Override - Parcel Holds | | | 4/10/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/10/2001 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 4/4/2001 | 4/4/2001 | 4/9/2001 | | PASS |
Dan Overy
|
|
|
4/9/2001 15:34:51 DJO - activity updated through activity BLDA022 from case BLD01-00691.
|
Plan Reviewer's activity | | | 4/9/2001 | | DONE |
|
|
|
received truss layout, footing engineering and tall wall engineering.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/9/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/9/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/9/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 4/5/2001 | | PEND |
|
|
|
|
Plan Review Report | | | 4/5/2001 | | PEND |
|
|
|
|
Plan Reviewer's activity | | | 4/5/2001 | | PEND |
|
|
|
have called Scott Adaimson. preliminary truss layout submitted by Franklin Building supply is not being used. Idaho truss maybe? Spinning my wheels without correct truss framing. will put on hold until necessary information is submitted.
|
Plan Reviewer's activity | | | 4/4/2001 | | PEND |
|
|
|
have started initial review. will require additional information reqarding girder reaction loads, point loads, beam sizing and possible footing modification.
|
Plans ACCEPTED BY PLAN CHECK | | | 4/4/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS | 4/2/2001 | 4/2/2001 | 4/3/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 4/2/2001 | 4/2/2001 | 4/3/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 3/19/2001 | 3/19/2001 | 3/30/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3. Grading plan needs revision to eliminate grading beyond the top of the slope at the rear of the lot. TOOK TO TERRY RECORDS
|
Application received | | | 3/19/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 4/3/2001 | 4/3/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 3/19/2001 | | | | PEND |
Dan Overy
|
|
|
|