Permanent occupancy | | | 10/11/2001 | | DONE |
|
|
|
Perm. Occ. Cert. #8862 issued 10-11-01 to Buddies Pub in the Overland Market.
|
Permanent Occupancy | | 10/9/2001 | 10/9/2001 | | DONE |
|
|
|
|
BLD-Final | 10/8/2001 | 10/9/2001 | 10/9/2001 | A | PASS |
Russ Owen
|
|
|
jeff ###-#### . ok perm occupancy. 10/9/2001 10:04:53 AM
|
BLD-Final | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | NR |
Russ Owen
|
|
|
Let me know if everything is aok - Thanks! Still need mirror lowered in rest room. 9/27/2001 11:39:31 AM
|
BLD-Final | 9/7/2001 | 9/7/2001 | 9/7/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/7/2001 1:59:54 PM Reinsp Ok for permanant occupancy
|
Fee Review-notes | 3/21/2001 | 3/21/2001 | 9/7/2001 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PASS |
Joe Tawney
|
|
|
Reinsp OK for temp occ. Duct detectors connected to alarm system 7/27/2001 10:18:42 AM
|
BLD-Final | 7/26/2001 | 7/27/2001 | 7/27/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/26/2001 at 15:20:34. Contact: ###-####.ok temp oc needs all req signatures for perm oc and c/n rest room mirror. 7/27/2001 11:46:00 AM
|
Temporary occupancy | | | 7/27/2001 | | DONE |
|
|
|
Temp. Occ. Cert. #4568 issued 7-27-01 to Buddies Pub.
|
FIRE-Final Inspection | 7/23/2001 | 7/23/2001 | 7/23/2001 | P | FAIL |
Joe Tawney
|
|
|
###-#### Final Fail C/N issued 7/23/2001 6:23:53 PM
|
BLD-Other | 7/17/2001 | 7/18/2001 | 7/18/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 07/17/2001 at 12:23:08. Contact: ###-####. grid ok 7/17/2001 10:50:15 PM
|
BLD-Framing/Rough-in | 7/6/2001 | 7/6/2001 | 7/6/2001 | P | FAIL |
Russ Owen
|
|
|
Jeff Alexander ###-#### grid ceiling. 7/6/2001 3:33:47 PM
|
FIRE-Conference | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | PASS |
Joe Tawney
|
|
|
Conf with Jeff on fire life/safety issues 6/12/2001 1:39:13 PM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/11/2001 | 6/11/2001 | P | PASS |
Dave Hannah
|
|
|
later pm jeff ###-####
|
BLD-Conference | 6/1/2001 | 6/1/2001 | 6/1/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 06/01/2001 at 10:40:03. Contact: ###-####. doing own work had questions. 1/1/2002 2:19:27 PM
|
Issue PAID IN FULL permit | | | 5/2/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/26/2001 | | PASS |
Ron Hill
|
|
|
|
Inspection Record Card- Bld | | | 4/26/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/26/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/26/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (R_H) | 3/29/2001 | | 4/26/2001 | | PASS |
|
|
|
4/26/2001 08:18:12 RMH - activity updated through activity BLDA022 from case BLD01-00710.
|
Routing - PLUMBING | 4/25/2001 | 4/25/2001 | 4/25/2001 | | PASS |
|
|
|
per resubmitted plans dated 4/24/01 and 97 upc
|
Routing - PLUMBING | 4/24/2001 | 4/24/2001 | 4/24/2001 | | FAIL |
|
|
|
you cant wet vent a urinak on to a floor drain, vent the mens restroom fd, 1 1/4" min. water supply will be required. You show 3/4". Your showing all the cold water branch lines connecting to the main building water line, all piping must be routed thru the 1 1/4" min. shut off valve for this unit. a 3" clean out will be required at the bar area. additional cross connection may be required.
|
Routing - PLAN CHECK | 4/24/2001 | | 4/24/2001 | | |
Ron Hill
|
|
|
Recieved resubmitted plan sheets for plumbing routed back to plumbing for reveiw. On 3-24-01 at 1:30
|
Plan resubmittals received | | | 4/24/2001 | | DONE |
|
|
|
Received two sets of page 3 for plan resubmittals, from Mike Fairchild, Architect.frowarded same to Ron Hill. 4/24/01 DAR
|
Routing - PLAN CHECK | 4/18/2001 | | 4/24/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 4/18/2001 | | PEND |
|
|
|
Received resubmitted plumbing sheets and plans back from fire departments review. Routed to plumbing for review of resubmitted plumbing sheets. Permit pending plumbing departments review and approval.
|
Routing - FIRE | 4/13/2001 | | 4/18/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/17/2001 | | DONE |
|
|
|
Received plumbing plan resubmittals, forwarded same to Ron Hill. 4/17/01 DAR
|
Plan Reviewer's activity | | | 4/13/2001 | | PEND |
Ron Hill
|
|
|
Plans not approved by pumbing department, No corrections required from building plan review, routing to fire for review. Permit is pending Plumbing approval, and fire department approvals.
|
Routing - PLAN CHECK | 4/4/2001 | | 4/12/2001 | | PEND |
Ron Hill
|
|
|
permit pending, plumbing approvals and fire department review and approval
|
Routing - PLUMBING | 4/2/2001 | | 4/4/2001 | | FAIL |
|
|
|
provide a vent for each fixture, provide indirect waste receptors for bar/food prep area, provide a valve controlling all outlets in this tenant space, thermol expantion protection may be required, provide a fixture schedule for all fixtures and equipment, additional cross connection protection may be required.
|
Routing - PUBLIC WORKS | 3/29/2001 | | 4/2/2001 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/29/2001 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/22/2001 | | DONE |
|
|
|
Will fax signed arch/eng. record form.
|
Received Certificate of Value | | | 3/21/2001 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/21/2001 | | DONE |
|
|
|
|
Application received | | | 3/21/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 4/26/2001 | | | | |
|
|
|
|