Permit Information
Permit NumberBLD01-00714
StatusFinaled
Name HEWLETT-PACKARD
Site Address 11311 W CHINDEN BLVD
Project NameHP #6S - TEST LAB
Customer Number 
ePlanReviewNo
Description
(HP BUILDING#6 - 6S - TEST LAB) To remodel existing Maintenance Shop room ofr use as a new equipment Test Lab room of 970 sq. ft. To remove existing overhead door and frame & finish around new set of double doors to be used to move equipment in and out of room. To use non-combustible, nonbearing metal frame walls and sheetrock cover to create a new entry vestibule and mechanical rooms, To install new suspended ceiling grid system; modify the existing sprinkler system for NFPA #13 & UBC Sec. 904 Code compliance; upgrade mechanical to meet ventilation & test equipment needs; provide new interior finishes; extend N2 gas, compressed air & sewer line to the new space; Install exit door security Access-Egress Control per Boise City Policy, copy attached. All per approved plans, notes on plans and attached plan review comments. A "Letter of Completion / Compliance" is required for final occupancy & use of this test lab facility. NOTE: DECLARED TO HAVE NO HAZARDOUS CHEMICALS USED IN TEST FACILITY BEYOND ALLOWABLE LIMITS OF TABLES 3-D & 3-E, UBC. PC#01-255/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/17/2010 DONE
Fee Review-notes3/21/20013/21/20011/29/2002 DONE
e-mailed Tim with HP for final information
DOC - Permit Finaled  12/26/2001 DONE
Final/Tom again on 12-26-01.
BLD-Aging Inspection12/24/200112/24/200112/24/2001 PART
DetailsTom Arcoraci
ok for perm 12/26/2001 8:21:10 AM
BLD-Aging Inspection10/22/200110/22/200110/22/2001 PASS
DetailsTom Arcoraci
done 10/22/2001 9:12:52 AM
BLD-Aging Inspection8/20/20018/20/20018/20/2001 PASS
DetailsTom Arcoraci
Office Staff conference/action  6/19/2001 DONE
Letter of Compliance #21541 issued 6-19-01.
BLD-Final6/15/20016/18/20016/18/2001PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 06/15/2001 at 10:31:13. Contact: ###-####. ok for perm occ 6/18/2001 4:32:59 AM
FIRE-Alarm Testing5/31/20016/7/20016/7/2001PPASS
DetailsJoe Tawney
Final OK for certificate of compliance 6/7/2001 6:30:35 PM
Issue PAID IN FULL permit  5/7/2001 DONE
Inspection Record Card- Bld  5/1/2001 DONE
Print Occupancy Form  5/1/2001 DONE
Telephone call  5/1/2001 DONE
left mess that permit is ready
Routing - PLAN CHECK4/25/2001 4/30/2001 PASS
Approved as noted and attached.
PLANS/APPL TAKEN TO FRONT DESK  4/30/2001 PASS
To permit desk for issuance of building permit.
Plan assigned to (DRS)3/30/2001 4/30/2001 PASS
DetailsDan Stuart
4/30/2001 17:09:38 DRS - activity updated through activity BLDA022 from case BLD01-00714.
Routing - FIRE4/20/2001 4/25/2001 PASS
Plan Review Completed(1st rev)  4/25/2001 PASS
Routing - PLAN CHECK4/3/2001 4/20/2001 PEND
ROUTING TO FIRE DEPARTMENT FOR REVIEW. No resubmittals required to plan check division. Copies of evaluation reports to be provide to structural field inspector for EIFS System proposed for project exterior and to show appropriate flame spread & smoke developement for foam plastic or other rigid insulation with appropriate index barrier of 15 for separation from interior habitable areas.
Print Pending Permit.LaserJet4  4/19/2001  
Routing - PUBLIC WORKS3/30/2001 4/3/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/26/2001 DONE
Danny is waiting for H occupancy questionaire. If it comes back as hazardous he will require stamped and signed mech. and plumb. KMM
Received Certificate of Value  3/22/2001 DONE
Application received  3/21/2001  
Recd Pcfee & Taken To Pln CK  3/21/2001