Case Summary (BLD) | | | 9/18/2014 | | DONE |
|
|
|
|
Fee Review-notes | 3/21/2001 | 3/21/2001 | 1/29/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 1/16/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #8993 issued 1-16-02 to Cloverdale Plumbing.
|
Permanent Occupancy | | 1/2/2002 | 1/2/2002 | | DONE |
|
|
|
|
BLD-Final | 1/2/2002 | 1/2/2002 | 1/2/2002 | P | PASS |
Russ Owen
|
|
|
MARK ###-#### Ok for perm oc all required signatures have signed permanent.1/2/2002 5:44:20 PM 1/2/2002 5:44:52 PM
|
FIRE-Final Inspection | 12/26/2001 | 12/27/2001 | 12/27/2001 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled 12/27/2001 2:30:13 PM
|
BLD-Final | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Russ Owen
|
|
|
###-####c/n posted. 12/27/2001 1:14:55 PM
|
BLD-Conference | 11/28/2001 | 11/28/2001 | 11/28/2001 | A | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 11/28/2001 11:35:24 AM Met with contractor. Explained where exit signs, emergency lights, fire extinguishers need to be placed. Also went over door hardware and access to the property
|
BLD-Framing/Rough-in | 10/24/2001 | 10/24/2001 | 10/24/2001 | P | PART |
Dave Hannah
|
|
|
Frank Page, ###-#### needs to move people form ext offices to new offices so they can start remoldeling ext offices ok t 10/24/2001 1:02:45 PM o move 10/24/2001 1:02:53 PM
|
FIRE-Final Inspection | 10/23/2001 | 10/23/2001 | 10/23/2001 | P | NR |
Troy Cobbley
|
|
|
###-#### Building not ready for life/safety final 10/24/2001 2:09:58 PM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/25/2001 | 9/25/2001 | A | PASS |
Russ Owen
|
|
|
###-#### FRANK. subject to ele re-insp. 9/25/2001 11:34:03 AM
|
BLD-Concrete | 8/30/2001 | 8/31/2001 | 8/31/2001 | P | PART |
Russ Owen
|
|
|
terry -###-####- concrete 2nd lift of block at non structural in-fill has been poured appears ok all cells grouted. 8/31/2001 4:08:48 PM
|
BLD-Framing/Rough-in | 8/29/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Russ Owen
|
|
|
frank ###-#### block insp
|
BLD-Foundation | 8/23/2001 | 8/23/2001 | 8/23/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 8/23/2001 5:07:34 PM Inspected garge foundation wall on 8/22/01, and approved pour, I was called by contractor today to check top of wall cap which indicates 2 rebar and 8 in thickness now 3-1/2 and 1 bar ,note 2 bars were put into wall and only req 1, wall was poured taller, verbal c/n to verify this is acceptable with engineer , note this area is only at the entrance of existing garge. 8/23/2001 5:15:51 PM
|
BLD-Footing | 8/21/2001 | 8/22/2001 | 8/22/2001 | A | PASS |
Russ Owen
|
|
|
###-#### frank.existing shop. 8/22/2001 11:19:47 AM
|
Issue PAID IN FULL permit | | | 6/8/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/30/2001 | | |
|
|
|
|
Print Occupancy Form | | | 5/30/2001 | | DONE |
|
|
|
|
Telephone call | | | 5/30/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Routing - PLAN CHECK | 5/29/2001 | | 5/29/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/29/2001 | | PASS |
|
|
|
|
Plan assigned to (CJW) | 3/29/2001 | | 5/29/2001 | | PASS |
Carl Westfall
|
|
|
5/29/01 16:07:50 CJW - activity updated through activity BLDA022 from case BLD01-00717.
|
Routing - PLUMBING | 5/22/2001 | | 5/29/2001 | | PASS |
|
|
|
verify premis protection with field inspector, no drainage required in covered parking area
|
Routing - PUBLIC WORKS | 5/18/2001 | | 5/22/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 5/7/2001 | | 5/18/2001 | | PASS |
|
|
|
Drawings approved, with conditions, after resubmittal review.
|
Plan resubmittals received | | | 5/17/2001 | | DONE |
|
|
|
Plan resubmittals received from Petersen Staggs Architechsplus small documents, same forwarded to Carl Westfall. 5/17/01 DAR
|
Routing - FIRE | 5/2/2001 | | 5/7/2001 | | PASS |
|
|
|
APPROVED WITHOUT WRITTEN COMMENT
|
Plan Review Completed(1st rev) | | | 5/7/2001 | | |
|
|
|
Failed first Plumbing, Public Works, and UBC review.
|
Routing - PLAN CHECK | 4/25/2001 | | 4/30/2001 | | |
|
|
|
Failed first UBC review.
|
Plan Reviewer's activity | | | 4/25/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started April 25, 2001 and finished April 30, 2001. A response from the architect was required. See the conditions list.
|
Routing - PLUMBING | 4/23/2001 | | 4/25/2001 | | |
|
|
|
Failed first Plumbing review. provide required floor drainage system in garage, include flammable liquids interceptor and connection to s.s., premis protection required.
|
Routing - PLANNING | 4/11/2001 | | 4/23/2001 | | PASS |
|
|
|
Ashley Rudel and Tempra Wilson. Approved per DRH
|
Routing - PUBLIC WORKS | 4/11/2001 | | 4/11/2001 | | |
|
|
|
Failed Public Works review. Requires plumbing plans. 4/11/01 DAR
|
Routing - PUBLIC WORKS | 3/29/2001 | | 4/10/2001 | | |
|
|
|
Failed Public Works review. Requires drainage plan per Brian Murphy. 4/10/01 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 3/22/2001 | | DONE |
|
|
|
|
Application received | | | 3/21/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/21/2001 | | |
|
|
|
|