BLD-Aging Inspection | 12/8/2003 | 12/8/2003 | 12/8/2003 | | DONE |
Russ Owen
|
|
|
|
DOC - Permit Finaled | 12/8/2003 | 12/8/2003 | 12/8/2003 | P | PASS |
Russ Owen
|
|
|
Finaled by inspector at 12/8/2003 5:00:37 PM
|
Fee Review-notes | 3/23/2001 | 3/23/2001 | 8/21/2002 | | DONE |
|
|
|
|
BLD-Final | 8/16/2002 | 8/16/2002 | 8/16/2002 | | DONE |
|
|
|
Final ok - approved for perm. occ. per Russ Owen.
|
Permanent occupancy | | | 8/16/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9298 issued 8-16-02 to the Hilton Garden Inn, section 1 of 3.
|
BLD-Final | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | PART |
Russ Owen
|
|
|
|
Permanent Occupancy | | 8/15/2002 | 8/15/2002 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled
|
FIRE-Final Inspection | 8/12/2002 | 8/12/2002 | 8/12/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled
|
BLD-Final | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Russ Owen
|
|
|
Needs fire/life safety for a temporary oc, has pending corrections for a permanent oc. 6/18/2002 5:07:17 PM 6/18/2002 5:07:36 PM
|
FIRE-Final Inspection | 6/18/2002 | 6/18/2002 | 6/18/2002 | P | PART |
Troy Cobbley
|
|
|
Fire alarm and fire life/safety finaled. Fire sprinkler given temp per Dave Miller for the window sprinklers
|
Temporary occupancy | | | 6/18/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4828 issued 6-18-02 to the Hilton Garden Inn, west section.
|
BLD-Final | 6/17/2002 | 6/17/2002 | 6/17/2002 | P | CANC |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/17/2002 10:26:41 AM
|
BLD-Final | 6/14/2002 | 6/14/2002 | 6/14/2002 | A | FAIL |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/14/2002 10:29:12 AM c/n posted. 6/14/2002 4:42:29 PM
|
BLD-Framing/Rough-in | 6/6/2002 | 6/7/2002 | 6/7/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/6/2002 3:57:27 PM
|
BLD-Framing/Rough-in | 6/5/2002 | 6/6/2002 | 6/6/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 6/5/2002 1:11:25 PM complete front lobby and main restrooms. ceiling. 6/6/2002 3:57:15 PM
|
BLD-Framing/Rough-in | 6/4/2002 | 6/5/2002 | 6/5/2002 | A | PART |
Russ Owen
|
|
|
CLAY ###-####
|
Override - Parcel Holds | | | 6/4/2002 | | |
|
|
|
|
BLD-Conference | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/22/2002 5:25:55 PM ok to cover rear raised roof. 5/23/2002 11:15:13 AM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/21/2002 11:49:34 AM kitchen hood 5/21/2002 12:34:12 PM
|
BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/21/2002 3:40:05 PM need truss details for rear roof ext. 5/21/2002 4:31:05 PM
|
BLD-Framing/Rough-in | 5/20/2002 | 5/20/2002 | 5/20/2002 | P | PART |
Russ Owen
|
|
|
###-#### will recall. 5/20/2002 4:59:27 PM
|
Override - Parcel Holds | | | 5/20/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 5/2/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/2/2002 | | DONE |
|
|
|
|
Telephone call | | | 5/2/2002 | | DONE |
|
|
|
called plan mod ready
|
Override - Parcel Holds | | | 5/2/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/1/2002 | 5/1/2002 | 5/1/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 5/1/2002 1:14:39 PM lower corridor ok fire caulk penetrations ok in room sections of corridor. only, rest not yet complete..5/1/2002 2:36:41 PM 5/1/2002 2:36:59 PM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/1/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/1/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/1/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/18/2002 | | 5/1/2002 | | PASS |
Mike Phillips
|
|
|
5/1/2002 14:40:46 M_P - activity updated through activity BLDA022 from case BLD01-00729.
|
Routing - PLAN CHECK | 4/26/2002 | | 5/1/2002 | | PASS |
|
|
|
Plan Modification
|
Plan resubmittals received | | | 4/26/2002 | | DONE |
|
|
|
Plan Modification. Received three sets of resubmittal sheets A3.0.1, S4.5, Structural Details page 1-5, Structural Roof Calculations, with cover letter/comments. Routed to Mike Phillips.
|
Routing - PLAN CHECK | 4/19/2002 | | 4/22/2002 | | FAIL |
|
|
|
PLAN MODIFICATION : Additional information required for a further review.
|
Case Summary (BLD) | | | 4/22/2002 | | |
|
|
|
|
Routing - PLANNING | 4/18/2002 | | 4/19/2002 | | PASS |
|
|
|
PLAN MODIFICATION OK PER SUSAN AND MARTY
|
Plan routing begun/NEW & ADDTN | | | 4/18/2002 | | DONE |
|
|
|
PLAN MODIFICATION
|
Plan resubmittals received | | | 4/18/2002 | | DONE |
|
|
|
Received two copies of MSDS listings and quantities. Routed to Mike P. kmm
|
BLD-Framing/Rough-in | 3/18/2002 | 3/18/2002 | 3/18/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 3/18/2002 12:11:40 PM beam in kitchen with holes needs approval also need the top of wall connections completed at the 2 1st floor shear walls. 3/19/2002 10:00:09 AM
|
BLD-Framing/Rough-in | 2/28/2002 | 2/28/2002 | 2/28/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/28/2002 4:00:14 PM
|
BLD-Framing/Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/22/2002 4:43:03 PM see notesm under 01-00736. 2/22/2002 4:50:47 PM
|
BLD-Framing/Rough-in | 2/20/2002 | 2/20/2002 | 2/20/2002 | P | PART |
Russ Owen
|
|
|
fr rich- ###-#### 2nd floor ok to insulate. 2/20/2002 3:21:10 PM
|
BLD-Framing/Rough-in | 2/18/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 02/18/2002 at 17:24:40. Contact: .3rd floor need fire stoping at 3 rest room walls/ will recall. 2/19/2002 2:42:59 PM
|
BLD-Framing/Rough-in | 2/14/2002 | 2/15/2002 | 2/15/2002 | A | FAIL |
Russ Owen
|
|
|
###-#### RICH . Need to complete fire stop at penetrations west of the first 2 hr wall. 2/15/2002 11:27:45 AM
|
BLD-Framing/Rough-in | 2/13/2002 | 2/13/2002 | 2/13/2002 | P | PART |
Russ Owen
|
|
|
###-#### RICH Shear ok at rest of west side of 3rd floor. ok to insulate the ceiling of the 2nd floor. still need fire caulking and shear nailing done at west side of 1st 2hr wall to the west exterior wall. 2/13/2002 3:48:24 PM
|
BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Russ Owen
|
|
|
R/I RICH ###-#### See bld 01-00736 for notes. 2/12/2002 4:21:30 PM
|
BLD-Framing/Rough-in | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/8/2002 11:20:58 AM see notes under 01-00736. 2/8/2002 4:14:33 PM
|
BLD-Framing/Rough-in | 2/7/2002 | 2/7/2002 | 2/7/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/7/2002 8:07:26 AM see bld 00736 for comments this day.2/7/2002 4:56:29 PM 2/7/2002 4:56:52 PM
|
BLD-Framing/Rough-in | 2/4/2002 | 2/5/2002 | 2/5/2002 | A | PART |
Russ Owen
|
|
|
###-#### went over roof trusses all ok except 1 truss at east end. The 4th floor still needs the area separation wall ele boxes paded and penetrations done note this wall has been insulated and drywalled. also there are pvc plumbing penetration which will be relocated and will need verification of protection. The 3rd floor can be insulated but has the same problem with the area separation walls and pvc flue pipes,also shear walls are not complete and rest room ceilings will need to be inspected prior to the drop celings being put in. See also bld 01-00737,01-00736. 2/5/2002 4:27:20 PM 2/5/2002 4:29:36 PM
|
BLD-Conference | 2/4/2002 | 2/4/2002 | 2/4/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by Inspector: 407 On 2/4/2002 12:11:40 PM see notes under 01--00736. 2/4/2002 1:01:29 PM
|
BLD-Framing/Rough-in | 1/21/2002 | 1/22/2002 | 1/22/2002 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 01/21/2002 at 14:46:56. Contact: ###-####.
|
Plan resubmittals received | | | 1/2/2002 | | DONE |
|
|
|
Received three copies of resubmittal sheets SK-67, SK-68, AND COVER LETTER. Routed to Russ Owens.
|
BLD-Aging Inspection | 12/10/2001 | 12/10/2001 | 12/10/2001 | | PART |
Russ Owen
|
|
|
wip. 12/12/2001 4:18:42 PM
|
Plan Reviewer's activity | | | 11/7/2001 | | |
|
|
|
Architect replaced. New architect is Russell Colburn
|
BLD-Aging Inspection | 10/8/2001 | 10/8/2001 | 10/8/2001 | | PART |
Russ Owen
|
|
|
work in process. 10/9/2001 11:58:57 AM
|
Case Summary (BLD) | | | 9/25/2001 | | |
|
|
|
|
BLD-Foundation | 8/6/2001 | 8/7/2001 | 8/7/2001 | A | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 08/06/2001 at 11:40:32. Contact: ###-####. spec on site 8/6/2001 10:37:59 PM
|
BLD-Footing | 7/19/2001 | 7/19/2001 | 7/19/2001 | P | PART |
Russ Owen
|
|
|
###-####.subject to s-i. 7/20/2001 3:33:20 PM
|
BLD-Footing | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PART |
Russ Owen
|
|
|
###-####
|
BLD-Foundation | 7/12/2001 | 7/12/2001 | 7/12/2001 | P | PART |
Russ Owen
|
|
|
|
BLD-Foundation | 7/10/2001 | 7/10/2001 | 7/10/2001 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/10/2001 at 10:38:48. Contact: .ok pending s-i report. 7/10/2001 4:36:46 PM
|
BLD-Foundation | 7/5/2001 | 7/6/2001 | 7/6/2001 | A | PART |
Russ Owen
|
|
|
###-####
|
BLD-Footing | 6/27/2001 | 6/28/2001 | 6/28/2001 | A | PART |
Russ Owen
|
|
|
Clay ###-#### ok subject to special insp. 6/28/2001 9:10:18 AM
|
BLD-Conference | 6/26/2001 | 6/27/2001 | 6/27/2001 | A | PART |
Russ Owen
|
|
|
Clay ###-#### meet with contractor,architect and subs for pre-job conference. 6/27/2001 10:46:30 AM
|
(F) Reprint permit | | | 6/26/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/22/2001 | | 6/25/2001 | | DONE |
|
|
|
Preparing for issuance. KMM
|
Print Occupancy Form | | | 6/25/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 6/25/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 6/25/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 6/25/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 3/23/2001 | | 6/25/2001 | | PASS |
Mike Phillips
|
|
|
6/25/2001 08:51:53 M_P - activity updated through activity BLDA022 from case BLD01-00729.
|
CHANGE ISSUED DATE | | | 6/25/2001 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 6/21/2001 | | 6/22/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/5/2001 | | 6/21/2001 | | PEND |
|
|
|
Routing to P.W.
|
Routing Off Site - STRUCTURAL | 6/14/2001 | | 6/21/2001 | | DONE |
|
|
|
contacted PDQ to take revised plans of 6-13-01 to outside eng. KMM
|
Plan Reviewer's activity | | | 6/21/2001 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Plan resubmittals received | | | 6/13/2001 | | DONE |
|
|
|
Received three plan sheets in resubmittals from Byron Lee Smith plus small documents, forwarded same to Mike Phillips. 6/13/01 DAR
|
Routing Off Site - STRUCTURAL | 5/18/2001 | | 6/6/2001 | | FAIL |
|
|
|
contacted pdq to take plans to outside eng.
Additional information required for further review.
|
Routing - PLANNING | 6/1/2001 | | 6/5/2001 | | PASS |
|
|
|
Approved per DRH01-17.
|
Plan resubmittals received | | | 5/30/2001 | | DONE |
|
|
|
Received plan resubmittals from Bryon Lee Smith, forwarded same to Mike Phillips. 5/30/01 DAR
|
Routing - PLUMBING | 5/25/2001 | 5/25/2001 | 5/25/2001 | | PASS |
|
|
|
plans approved with all kitchen waste routed thru grease interceptor
|
Routing - PUBLIC WORKS | 5/18/2001 | | 5/18/2001 | | FAIL |
|
|
|
Same as befroe. 5/18/01 DAR
|
Plan resubmittals received | | | 5/16/2001 | | DONE |
|
|
|
Two sets of plan resubmittals received plus three sets of structural plans and small documents from byron lee smith forwarded same to Mike PHIllips. 5/16/01 DAR
|
Routing - FIRE | 5/11/2001 | | 5/11/2001 | | PASS |
|
|
|
|
Routing - FIRE | 4/23/2001 | | 4/26/2001 | | PASS |
|
|
|
PLAN MODIFICATION
|
Routing Off Site - STRUCTURAL | 3/23/2001 | | 4/23/2001 | | FAIL |
|
|
|
contacted PDQ to take plans to outside eng. KMM
Additional review required by outsode engineering firm.
|
Routing - PLAN CHECK | 4/16/2001 | | 4/23/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 4/23/2001 | | FAIL |
|
|
|
Additional information required for further review.
|
Routing - PLUMBING | 4/9/2001 | | 4/16/2001 | | FAIL |
|
|
|
plumbing review can not be completed untill public works pretreatment review is complete.
|
Plan resubmittals received | | | 4/13/2001 | | DONE |
|
|
|
Received plan resubmittals from Byron Smith, Architect, two sets plus Architectual plans , forwarded same to Mike Phillips. 3/13/01 DAR
|
Routing - PLANNING | 4/4/2001 | | 4/9/2001 | | PASS |
|
|
|
.
|
Routing - PUBLIC WORKS | 3/23/2001 | | 4/4/2001 | | FAIL |
|
|
|
Requires proof of legal land division per Jim Rich. 4/4/01 DAR
|
Plan routing begun/NEW & ADDTN | | | 3/23/2001 | | DONE |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 3/23/2001 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 3/23/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 3/23/2001 | | DONE |
|
|
|
|
Application received | | | 3/22/2001 | | |
|
|
|
|