Code Occupancy Approval | | | 7/22/2004 | | PASS |
|
|
|
LANDSCAPE AND FENCE AS REQUIRED FINAL SIGNED AND RELEASE OF BOND.
|
BLD-Final | 7/7/2003 | 7/8/2003 | 7/8/2003 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 7/7/2003 at 4:13:54 PM. Contact: ###-####.
|
DOC - Permit Finaled | 7/8/2003 | 7/8/2003 | 7/8/2003 | A | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 7/8/2003 9:29:18 AM
|
BLD-Final | 6/4/2003 | 6/5/2003 | 6/5/2003 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### rob needs all finals ect......
6/5/2003 10:59:52 AM
|
BLD-Framing/Rough-in | 3/3/2003 | 3/3/2003 | 3/3/2003 | P | PASS |
Tom Arcoraci
|
|
|
###-#### rob
|
BLD-Framing/Rough-in | 2/24/2003 | 2/24/2003 | 2/24/2003 | P | PART |
Russ Owen
|
|
|
###-#### . the draft stop needs to sealed at large areas. and center wall is bearing and needs blocking as writen. posted c/n insulation is not complete. 2/24/2003 3:02:28 PM
|
BLD-Framing/Rough-in | 2/7/2003 | 2/7/2003 | 2/7/2003 | P | PART |
Steven Webb
|
|
|
jim call 1st before insp--###-####-re-insp C/N posted--ok to insulate. 2/7/2003 2:27:19 PM
|
BLD-Framing/Rough-in | 1/21/2003 | 1/21/2003 | 1/21/2003 | P | FAIL |
Tom Arcoraci
|
|
|
robert ###-#### CN POSTED DRAFT STOP HEADERS ECT... 1/21/2003 1:49:09 PM
|
BLD-Foundation | 9/18/2002 | 9/19/2002 | 9/19/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok per bob a and tom a 9/19/2002 10:04:20 AM
|
Issue PAID IN FULL permit | | | 9/13/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/6/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/6/2002 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2002 | | DONE |
|
|
|
PERMIT READY AND FEES DUE
|
Plan assigned to (SAM) | 8/19/2002 | | 9/5/2002 | | PASS |
Steve Munroe
|
|
|
9/5/2002 14:01:46 SAM - activity updated through activity BLDA022 from case BLD01-00732.
|
Case Summary (BLD) | | | 9/5/2002 | | |
|
|
|
|
Plan Review Report | | | 9/5/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/14/2002 | | 9/5/2002 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 8/20/2002 | | PEND |
|
|
|
I talked to Rob Barclay and let him know that I have two different plans in my office and neither one matches what is constructed. He said he will come in and get a set of plans and make it so they match what is constructed.
|
MISC ACTIONS | | | 8/15/2002 | | PASS |
Bob Archibald
|
|
|
Ok for issuance of permit, agreement from owner received.
|
Routing - PLANNING | 8/12/2002 | | 8/14/2002 | | PASS |
|
|
|
Approved.
|
Routing - PLANNING | 8/9/2002 | | 8/12/2002 | | FAIL |
|
|
|
Driveway setbacks have not been shown on the site plan. The driveway requires a 3'0" setback from property lines. Left phone message with Barclay Construction.
|
Routing - PUBLIC WORKS | 8/8/2002 | | 8/9/2002 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/22/2001 | 3/22/2001 | 8/8/2002 | | HOLD |
|
|
|
HOLD. Waiting for legal action per Bob Archibald. 8/8/2002-Released to prcoceed per Bob A. and Marlene.
|
Plan Reviewer's activity | | | 8/7/2002 | | DONE |
|
|
|
Added new general contractor's name permit (Barclay Construction). Waiting for bond, then begin routing again per Bob A.
|
MISC ACTIONS | | | 8/6/2002 | | PART |
Bob Archibald
|
|
|
Conference with owner, contractor and HomServ. Reviewed condition list and requirements to begin and complete this duplex. Ryan-owner, Rob-Barclay Construction and Mike-Homserv. Application submitted and will begin routing when bond is posted with Cathy($2500).
|
MISC ACTIONS | | | 7/24/2002 | | PART |
Bob Archibald
|
|
|
Have spoken to four parties requesting information on requirements to complete structure. Informed them permits required and to contact our Plan Review Dept.. Also gave Perry P. a heads up that potential applicants should be contacting him.
|
MISC ACTIONS | | | 6/14/2002 | | PART |
Bob Archibald
|
|
|
Certified mail receipts received from both the title co. and trustee.
|
MISC ACTIONS | | | 6/7/2002 | | PART |
Bob Archibald
|
|
|
Notice of non compliance recorded with Ada County. Recording sent by certified mail to title company and trustee. A double fee will be required on all associated permits on this property.
|
MISC ACTIONS | | | 5/22/2002 | | PART |
Bob Archibald
|
|
|
Phone conference with Tina from First American Title. Stay on bankruptcy has been lifted and property will be listed for trustee sale mid July. She informed me to contact bankrupt trustee for more info.
|
MISC ACTIONS | | | 5/16/2002 | | PART |
Bob Archibald
|
|
|
Left phone message with Stephanie at Wells Fargo requesting information regarding this property, ###-####. No response from certified notices.
|
MISC ACTIONS | | | 3/28/2002 | | PART |
Bob Archibald
|
|
|
Certified mail receipt returned.
|
MISC ACTIONS | | | 3/25/2002 | | PART |
Bob Archibald
|
|
|
Sent N&O by certified mail to owner of record. Also cc'd Wells Fargo by regular mail.
|
BLD-Final | 7/30/2001 | 7/31/2001 | 7/31/2001 | A | FAIL |
Russ Owen
|
|
|
###-####. The first stop work order placed in may is still posted, and it does not appear that any more work has been done. 7/31/2001 10:59:24 AM
|
Override - Parcel Holds | | | 7/30/2001 | | |
|
|
|
|
Routing - PLANNING | 5/11/2001 | 5/11/2001 | 5/11/2001 | | FAIL |
|
|
|
Driveway setbacks do not comply with ordinance requirements. 3'0" setbacks required at side (west) and front (south) yards.
|
Override - Parcel Holds | | | 5/10/2001 | | |
|
|
|
|
Stop Work Order | 5/10/2001 | | 5/10/2001 | | DONE |
|
|
|
Parcel tag also entered noting stop work. Double fee all trades.
|
Office Staff conference/action | | | 5/3/2001 | | HOLD |
|
|
|
HOLDING PLANS AT MY DESK UNTIL LINDA GETS BACK TO SEE ABOUT VOIDING THIS PERMIT. 5/3/2001/PE
|
Routing - PLANNING | 3/22/2001 | 3/22/2001 | 3/26/2001 | | FAIL |
|
|
|
Driveway setbacks do not comply with ordinance requirements.
|
Office Staff conference/action | | | 3/26/2001 | | HOLD |
|
|
|
marty put plans in rejection drawer at mapping counter. pe 3/26/2001
|
Application received | | | 3/22/2001 | | |
|
|
|
|