Permit Information
Permit NumberBLD01-00739
StatusFinaled
Name PETERSON L MARVIN & JEAN
Site Address 9101 W FAIRVIEW AVE
Project NamePETERSON MOTORS
Customer Number 
ePlanReviewNo
Description
PETERSON MOTORS ADDITION - TO CONSTRUCT A NEW 2,800 SQ. FT., ONE STORY, SHOWROOM/SALES AREA ADDITION TO THE EAST END OF THE EXISTING PETERSON MOTORS AUTOMOBILE SALES AND SERVICE BUILDING. THIS BUILDING ADDITION IS CONSTRUCTED OF CONCRETE SLAB FLOORS, MASONRY EXTERIOR WALLS, STEEL STRUCTURAL FRAME AND METAL ROOF WITH SINGLE PLY ROOFING SYSTEM. THIS BUILDING IS FULLY FIRE SPRINKLED. THE SPRINKLERS ARE USED FOR AREA INCREASE. THIS PERMIT ALSO INCLUDES RELATED SITE IMPROVEMENTS. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED COMMENT LIST. DRH 01-00043/PC0253-01/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/7/20037/7/20037/7/2003 DONE
Permanent occupancy  10/18/2001 DONE
Perm. Occ. Cert. #8873 issued 10-18-01 to Peterson Motors (addn.)
BLD-Final10/17/200110/17/200110/17/2001PPASS
DetailsRuss Owen
Scheduled by Inspector: 407 On 10/17/2001 4:06:00 PM . Ok for permanent oc. 10/17/2001 4:08:54 PM
Permanent Occupancy 10/17/200110/17/2001 DONE
Details
BLD-Conference9/24/20019/24/20019/24/2001PPART
DetailsRuss Owen
CONF ONLY DAN - ###-####, went over items needed with contractor for permanent occupancy. 9/24/2001 1:48:44 PM
BLD-Final9/19/20019/19/20019/19/2001PFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 9/19/2001 2:04:01 PM c/n posted . 9/19/2001 3:35:58 PM
BLD-Final9/13/20019/17/20019/17/2001ANR
DetailsRuss Owen
###-#### KAREN SMITH. will recall no paper work at the site. 9/17/2001 1:15:19 PM
BLD-Final9/13/20019/14/20019/14/2001ACANC
DetailsRuss Owen
###-#### CANCELED BY KAREN SMITH 9-13-01
BLD-Final9/10/20019/13/20019/13/2001ACANC
DetailsRuss Owen
###-#### FN DAN CANCELED BY KAREN SMITH/////DLD 9-13-01
BLD-Final9/6/20019/11/20019/11/2001ACANC
DetailsRuss Owen
###-#### Karen--- CANCEL PER DAN LYDA
Fee Review-notes3/23/20013/23/20019/11/2001 DONE
BLD-Final8/30/20018/31/20018/31/2001AFAIL
DetailsRuss Owen
###-####.needs fire/life safety signed for a temp, other required signatures have been signed, also i have c/n posted fory 8/31/2001 11:35:20 AMexterior hc ramp hand rails to be installed ,and other items a noted on posted c/n at the site. NOT approved for occupancy at this time. 8/31/2001 11:36:24 AM
FIRE-Final Inspection8/31/20018/31/20018/31/2001PPASS
DetailsRick Jackson
###-####
BLD-Final8/31/20018/31/20018/31/2001PPART
DetailsRuss Owen
Scheduled by Inspector: 407 On 8/31/2001 2:54:13 PM ok temp oc c/n posted with contractor. 8/31/2001 4:10:16 PM
Temporary occupancy  8/31/2001 PART
Temp. Occ. Cert. #4587 issued 8-31-01 to Peterson Motors.
Override - Parcel Holds  8/30/2001  
FIRE-Final Inspection8/28/20018/29/20018/29/2001ANR
DetailsJoe Tawney
Final Not ready. Work not completed 8/29/2001 10:58:06 AM
Code Occupancy Approval  8/28/2001 FAIL
Inspected for compliance with DRH01-00043. Still need to complete landscaping and H/C Parking space. Bonded $3,137.00 for "Temporary".
BLD-Framing/Rough-in8/22/20018/22/20018/22/2001PPART
DetailsRuss Owen
ceiling inspection Dan ###-####, needs 6 lights tied at north side. 8/22/2001 3:34:47 PM
BLD-Framing/Rough-in8/3/20018/6/20018/6/2001APART
DetailsRuss Owen
###-#### steel stud.ok to cover. 8/6/2001 2:51:35 PM
BLD-Framing/Rough-in8/3/20018/6/20018/6/2001APART
DetailsRuss Owen
###-#### steel stud.ok to cover. 8/6/2001 2:51:35 PM
BLD-Conference7/30/20017/30/20017/30/2001PFAIL
DetailsRuss Owen
Scheduled by Inspector: 407 On 7/30/2001 11:55:14 AM .went by job to check status/ soffit c/n. 7/30/2001 1:02:25 PM
Issue PAID IN FULL permit  5/8/2001 DONE
Plan assigned to (JCM)3/26/2001 5/3/2001 PASS
DetailsJohn Menard
5/3/01 09:36:22 JCM - activity updated through activity BLDA022 from case BLD01-00739.
Plan resubmittals received  5/3/2001 DONE
Received two sets of plan resubmittals from Mark Knowles, sheets A2 AND A8. Forwarded same to John Menard. 2/3/01 DAR
Plan Reviewer's activity  5/3/2001 PASS
Reviewed and approved resubmitted plan sheets. JCM
PLANS/APPL TAKEN TO FRONT DESK  5/3/2001 PASS
Inspection Record Card- Bld  5/3/2001 DONE
Print Occupancy Form  5/3/2001 DONE
Telephone call  5/3/2001 DONE
###-####
Routing - PLAN CHECK4/26/2001 5/3/2001 PASS
Routing - FIRE4/23/2001 4/26/2001 PASS
Plan Review Completed(1st rev)  4/26/2001 FAIL
Routing - PLAN CHECK4/9/2001 4/23/2001 FAIL
Plan resubmittals requested  4/23/2001 FAIL
Mailed the architect of record a letter requesting revisions. JCM
Routing - PLUMBING4/6/2001 4/9/2001 PASS
Routing - PLANNING4/4/2001 4/6/2001 PASS
Approve per DRH01-43.
Routing - PUBLIC WORKS3/26/2001 4/4/2001 PASS
Plans ACCEPTED BY PLAN TECH  3/26/2001 DONE
Application received  3/23/2001