Permit Information
Permit NumberBLD01-00808
StatusFinaled
Name SHORELINE PLAZA INC
Site Address 617 S 13TH ST
Project NameSHORELINE APARTMENTS
Customer Number 
ePlanReviewNo
Description
Section 1 of 2, eastern section * A two hour area separation wall will divide this 54 unit apartmetn building into two separate buildings. This portion is 3 stories with mezzanine, wood framed, 31,329 sq.ft. 36 unit apartment building above a three hour occupancy separation per UBC Section 311.2.2.1. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. NOTE: This building has a NFPA 13-R residential fire sprinkler system and can not be used for any code reductions. Refer to BLD 01- 00809 for other side of area separation wall and BLD01-00011 for parking structure permit. DRH-00-237 & CUP-00-00124 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/7/20037/7/20037/7/2003 DONE
Permanent occupancy  8/28/2002 DONE
Perm. Occ. Cert. #9325 issued 8-28-02 to the Shoreline Apts., east section.
Permanent Occupancy 8/27/20028/27/2002 DONE
Details
BLD-Final8/16/20028/19/20028/19/2002PPASS
DetailsCarl Dependahl
9419372 ...apts ok; canopy(ies) at entries to be completed thru BOI-ADA Housing Authority....not req'd to be type 1 construction (as previously noted on plans) 8/20/2002 1:31:30 PM
BLD-Final8/16/20028/16/20028/16/2002PCANC
DetailsCarl Dependahl
DARRELL; Phone #: ###-####
Plan resubmittals received  6/13/2002 DONE
Received two copies of resubmittal sheets A2.0, A2.1, A4.02, A5.0, A5.1 with transmittal. Routed to Mike Phillips.
BLD-Final5/15/20025/15/20025/15/2002ANR
DetailsCarl Dependahl
BLD-Final5/15/20025/15/20025/15/2002PPART
DetailsCarl Dependahl
c/n, ok for t/o 5/15/2002 5:58:00 PM
Temporary occupancy  5/15/2002 DONE
Temp. Occ. Cert. #4813 issued 5-15-02 to the Shoreline Apts., Sec. 1 of 2.
BLD-Final5/14/20025/14/20025/14/2002PCANC
DetailsRuss Owen
###-####
BLD-Final5/14/20025/14/20025/14/2002PNR
DetailsCarl Dependahl
Scheduled by Inspector: 407 On 5/14/2002 4:45:09 PM
Plan resubmittals received  5/14/2002 DONE
Received two sets of resubmittal sheets A2.0, A2.1, A4.02, A5.0, A5.1, WITH COVER LETTER. Routed to Carl Dependahl.
FIRE-Final Inspection5/10/20025/10/20025/10/2002PPASS
DetailsRick Jackson
Scheduled by Inspector: 409 On 5/10/2002 4:21:18 PM
BLD-Framing/Rough-in4/18/20024/19/20024/19/2002APASS
DetailsTom Arcoraci
DARRELL ###-#### grid ok 4/19/2002 10:06:26 AM
Override - Parcel Holds  4/18/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure. Reason for OverRide:
Override - Parcel Holds  4/18/2002 DONE
DetailsDarla L Downs
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure. Reason for OverRide:
Case Summary (BLD)  4/9/2002  
BLD-Energy code compliance1/30/20021/30/20021/30/2002PPART
DetailsCarl Dependahl
darrell-- ###-#### energy
Override - Parcel Holds  1/30/2002  
BLD-Framing/Rough-in1/11/20021/14/20021/14/2002ACANC
DetailsCarl Dependahl
darrell ###-#### fr
BLD-Framing/Rough-in1/14/20021/14/20021/14/2002PPART
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 1/14/2002 11:52:37 AM darrel, ###-#### 1st, 2nd fl... stairs, rails not complete, add osb at s.w.2 interiors...ok to continue. 1/14/2002 6:14:16 PM
Override - Parcel Holds  1/11/2002  
BLD-Aging Inspection12/18/200112/18/200112/18/2001 NR
DetailsCarl Dependahl
wip 12/18/2001 2:39:34 PM
BLD-Conference10/15/200110/15/200110/15/2001PPART
DetailsCarl Dependahl
###-#### darrell, "pre-con" w/ supt. 10/15/2001 4:38:53 PM
BLD-Conference10/12/200110/15/200110/15/2001ACANC
DetailsCarl Dependahl
###-#### DARRELL
Override - Parcel Holds  10/15/2001  
Override - Parcel Holds  10/15/2001 DONE
DetailsAnnett Moore
Parcel Tag Notes: All inspections can be made except the final and the issuance of the Certificate of Occupancy.
Prior to the final, the following must be completed and approved. Installation of a 4 hour area separation wall is required at the lobby area of the existing apartment building. A separate permit is requied to up grade the existing structure.
Override - Parcel Holds  10/12/2001  
Plan resubmittals received  10/11/2001 DONE
Received two copies of revised sheets A4.01 Routed to Carl D. kmm
BLD-Conference10/9/200110/9/200110/9/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/9/2001 5:04:22 PM reviewed submittal w/ bldr, vents ok as thru penetrations if n.c. & stopped at floor in walls
Plan resubmittals received  10/5/2001 DONE
Received two copies of revised sheets A4.1, A4.2, S9.0, S10.0, S11.0, S12.0, S14.0, routed to Carl D. kmm
BLD-Conference8/9/20018/10/20018/10/2001APASS
DetailsCarl Dependahl
###-#### darrell , precon w/ contractor 8/10/2001 12:12:48 PM
Issue PAID IN FULL permit  8/6/2001 DONE
Plan Reviewer's activity  7/31/2001 PASS
Print Pending Permit.LaserJet4  7/31/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  7/31/2001 DONE
Case Summary (BLD)  7/31/2001 DONE
Inspection Record Card- Bld  7/31/2001 DONE
Print Occupancy Form  7/31/2001 DONE
Telephone call  7/31/2001 DONE
Plan assigned to (M_P)3/30/2001 7/31/2001 PASS
DetailsMike Phillips
7/31/2001 10:39:46 M_P - activity updated through activity BLDA022 from case BLD01-00808.
Routing - PLAN CHECK5/24/2001 7/31/2001 DONE
Plan Reviewer's activity  7/30/2001 FAIL
Waiting for letter from architect to approve alternate.
Plan resubmittals received  7/30/2001 DONE
Received plan resubmittals from Tamura and Associates, one set of sheets A2.1,A2.2, A2.3 and A4.6, forwarded same to Mike Phillips. 7/30/01 DAR
Plan resubmittals received  7/12/2001 DONE
Received plan check resubmittals from Tamura and Associates, two sets of sheets A4.01, M1.0 and M2.0, forwarded same to Mike Phillips. 7/12/01 DAR
Plan Reviewer's activity  6/29/2001 FAIL
Called and left message. Need ducts installed in shafts, fire dampers in ceilings of bathrooms, wood not allowed at exit canopy on first floor and need lettter for alternate.
Routing Off Site - STRUCTURAL6/14/2001 6/26/2001 DONE
Contacted PDQ to take revised plans and calcs. of 6-14-01 to outside eng. KMM
Plan resubmittals received  6/19/2001 DONE
Plan resubmittals received from Tamura and Associates, Mark Sanders, two sets of Architectural and Mechanical sheets, forwarded same to Mike Phillips. 6/19/01 DAR
Plan resubmittals received  6/19/2001 DONE
Received plan resubmiottals from Doug Tamura and associates, forwarded same to Mike Phillips. 6/19/01 DAR
Plan resubmittals received  6/14/2001 DONE
Received three copies of revised sheets and calcs. and supplemental calcs. Routed to Mike P. KMM
Routing - FIRE5/21/2001 5/24/2001 PASS
Plan Review Completed(1st rev)  5/24/2001 FAIL
Plan Reviewer's activity  5/21/2001 FAIL
Additional information required for further review.
Print Pending Permit.LaserJet4  5/21/2001  
Routing - PLAN CHECK4/17/2001 5/21/2001 FAIL
Routing to fire.
Routing Off Site - STRUCTURAL4/3/2001 4/18/2001 FAIL
Sent engineering copy of plan sto consultantint engineer via PDQ. 4/3/01 DAR
Additional information required to be sent to outside engineer for further review.
Routing - PLUMBING4/11/2001 4/17/2001 PASS
use approved civil plans approved under bld01-00011, provide pan drains for 1st floor water heaters,piped separately to garage.
Routing - PLANNING4/5/2001 4/11/2001 PASS
Approved per CUP00-124 & CFH00-32 (Susan Riggs), and per DRH00-237 (Marty Santoyo).
Routing - PUBLIC WORKS4/3/2001 4/5/2001 PASS
Application received  3/30/2001  
Override - Parcel Holds  3/30/2001  
Print Pending Permit.LaserJet4  3/30/2001  
Telephone call  3/30/2001 DONE
called with plan review fees