| Case Summary (BLD) | | | 8/27/2002 | | |
|
|
|
|
| Fee Review-notes | 4/2/2001 | 4/2/2001 | 1/29/2002 | | DONE |
|
|
|
|
| FIRE-Final Inspection | 1/9/2002 | 1/11/2002 | 1/11/2002 | A | PASS |
Troy Cobbley
|
|
|
Fire life/safety finaled OK for perm occ. 1/11/2002 10:13:26 AM
|
| BLD-Framing/Rough-in | 1/9/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
###-####
|
| BLD-Final | 1/11/2002 | 1/11/2002 | 1/11/2002 | P | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 1/11/2002 3:07:56 PM ok for perm
|
| Permanent Occupancy | | 1/11/2002 | 1/11/2002 | | DONE |
|
|
|
|
| Permanent occupancy | | | 1/11/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #8990 issued 1-11-01 to Brico of Idaho, Inc.
|
| BLD-Framing/Rough-in | 12/11/2001 | 12/11/2001 | 12/11/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### cn posted 12/11/2001 2:01:59 PM
|
| FIRE-Final Inspection | 12/7/2001 | 12/10/2001 | 12/10/2001 | P | FAIL |
Troy Cobbley
|
|
|
provide approved egress (landings and ramps) at exits and provide electrical corrections per Boise Fire Dept. at the LP tank 12/10/2001 4:15:04 PM
|
| FIRE-Final Inspection | 11/28/2001 | 11/29/2001 | 11/29/2001 | A | FAIL |
Troy Cobbley
|
|
|
verify main retail entrance landing slope is OK, relocate exit sign in conference room, repair exit signs, provide fire extinguishers at LP and Fuel Oil tanks, verify no duct detectors are needed 11/29/2001 4:30:51 PM
|
| BLD-Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | NR |
Russ Owen
|
|
|
doug ###-####needs fire/life safety 11/28/2001 3:48:05 PM
|
| BLD-Final | 10/1/2001 | 10/2/2001 | 10/2/2001 | A | NR |
Tom Arcoraci
|
|
|
fn doug- ###-####
|
| BLD-Framing/Rough-in | 9/19/2001 | 9/20/2001 | 9/20/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### ok to cover new 1-hour wall verify other 1-hour wall at next insp 9/20/2001 10:31:16 AM
|
| Issue PAID IN FULL permit | | | 8/21/2001 | | DONE |
|
|
|
|
| Telephone call | | | 8/16/2001 | | DONE |
|
|
|
left mess that permit is ready
|
| Routing - FIRE | 8/14/2001 | 8/15/2001 | 8/15/2001 | | PASS |
Bill Alexander
|
|
|
|
| Routing - PLAN CHECK | 8/15/2001 | | 8/15/2001 | | PASS |
|
|
|
Approved as noted on plans and attached plan review conditions of fire and plan check divisions.
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2001 | | PASS |
|
|
|
Routing to permit desk for issue of permit.
|
| Inspection Record Card- Bld | | | 8/15/2001 | | DONE |
|
|
|
|
| Print Occupancy Form | | | 8/15/2001 | | DONE |
|
|
|
|
| Plan assigned to (DRS) | 4/10/2001 | | 8/15/2001 | | PASS |
Dan Stuart
|
|
|
8/15/2001 11:56:48 DRS - activity updated through activity BLDA022 from case BLD01-00813.
|
| Routing - PLAN CHECK | 8/14/2001 | 8/14/2001 | 8/14/2001 | | PEND |
|
|
|
Inserted new plan sheets into plans and routed to fire code analyst.
|
| Plan resubmittals received | | | 8/13/2001 | | |
|
|
|
New plan sheets SP1 & A-2 submitted along with new inventory control update to add LP Fuel used in fork lift and to reduce Nitrous Oxide used in Power Extreme Motorsports from 529 cf to 250 cf, OHH. Also received copies of plan for installation of fuel tanks & dispensing at East side of property, approved by Dave Miller, 9/29/99, and electrical hoo-up for propane tank installed at North end of property under BLD99-02895. Routing to fire dept for re-review.
|
| Routing - FIRE | 7/20/2001 | 7/20/2001 | 7/23/2001 | | FAIL |
Bill Alexander
|
|
|
Did not answer questions in regards to motorized vehicle use meeting Article 82 and/or 64.
|
| Routing - PLAN CHECK | 7/20/2001 | 7/20/2001 | 7/20/2001 | | PEND |
|
|
|
Routing to fire code analyst for re- review.
|
| Additional plans submitted | | | 7/19/2001 | | DONE |
|
|
|
Received Hazardous Materials Inventory Statement, forwarded same to Dan Stuart. 7/19/01 DAR
|
| Plan Reviewer's activity | | | 5/21/2001 | | |
|
|
|
Recieved fax from Page Dougherty of ICBO confirming a maximum of 2 control areas. I faxed a copy of this response to Cornel Larson with a note to include the other tenant space inventory in the totals of control area 2. He is forwarding to Will Winslow.
|
| Routing - PLAN CHECK | 4/11/2001 | | 5/21/2001 | | FAIL |
|
|
|
Waiting for aditional information from architect.
|
| Routing - FIRE | 5/15/2001 | 5/18/2001 | 5/18/2001 | | FAIL |
Bill Alexander
|
|
|
Code interpretation requires 2, not 4 control areas as established by the reports/documents. Need information on LP storage/dispensing. Fuel Island despensing. Lck information on forklift operations (LP/Battery) and related issues with.
|
| Plan resubmittals received | | | 5/18/2001 | | DONE |
|
|
|
Received plan resubmittals from Larson Architects, two sets of sheets O and A-1, forwarded same to Dan Stuart. 5/18/01 DAR
|
| Plan resubmittals requested | | | 5/18/2001 | | FAIL |
|
|
|
Architect response to control area requirments is still felt to be incorrect. Waiting for ICBO response. If response favors plan check interpretation, the entire building can only be 2 control areas and the hazardous materials inventory for existing tenants will need to be included in the haz mat specialist, Will Winslow, chemical hazardous materials report.
|
| Plan resubmittals requested | | | 5/15/2001 | | FAIL |
|
|
|
Plans incomplete. Exiting, Control Areas and separations in question. Contacted ICBO for interp on control areas.
|
| Routing - PUBLIC WORKS | 4/10/2001 | | 4/11/2001 | | PASS |
|
|
|
|
| Application received | | | 4/2/2001 | | |
|
|
|
|
| Recd Pcfee & Taken To Pln CK | | | 4/2/2001 | | DONE |
|
|
|
|
| Telephone call | | | 8/17/1999 | | DONE |
|
|
|
Dan West, BriCo of Idaho from Twin Falls Area inquired about obtaining a Certificate of Occupancy for opening an office, retail & storage warehouse at 5858 Franklin Road. Mr. West was instructed to obtain an architect to perform a code analsys of the site and provide floor plans to accompany the analysis to show complying items and means to correct non-complying items. As the warehouse and display / sales area would have quantities of flammable and combustible product, a third party technical expert on hazardous materials was to provide an inventory report for the quantities and classification of each product type to help determine the applicable code occupancy classification & requirements. Mr. west contacted Gregg Ostrow, project architect for SLRMC to see if he would be interested in being the architect for the project. I received calls from Gregg Ostrow concerning the project on 8/24/99 & 8/31/99 after which further contact stopped. It was though that the tenant had found out that the costs to establish his business at this location was more than he desired to spend.
In late October or early November of 2000 the owner of the building applied for a permit to create two new tenant spaces. At this time it was revealed that there were three additional occupancy spaces that had been created in the past and were currently occupied illegally. One of the tenants was BriCo of Idaho. Materials at the site indicated that the tenant was most likely a hazardous occupancy. An outdoor fuel island had been installed and out outside dispensing station for propane gas sales. At this time the owner was notified that the illegal tenants would need to take immediate steps to comply with City of Boise code. A time framwe agreement was provided to guide the developement of plans and submitals for permits to perform code upgrades for the purpose of establishing a certificate of occupancy for the existing tenant and to allw the city to move ahaed with the review and approval of plans to create two ne w vanilla finsh plans for future tenants. The proposed date of plan submittals was Feb. 7, 2001. Plans were submitted with the technical report for review and approval on 4/24/01.
|
| Routing - PLAN CHECK | 5/18/2001 | | | | |
|
|
|
|