Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD01-00813
StatusFinaled
Name HEMMER INVESTMENTS L L C
Site Address 5858 W FRANKLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
*BRICO OF IDAHO* To remodel a 9,800 sq.ft. space for new retail / office/ warehouse tenant use per approved plans on file, to include notes on plans and attached plan review conditions. This space will be divided into 2 control areas in accordance with Table 3-D & 3-E, footnote #1, UBC and UFC provisions, by 1-hour occupancy separation construction, to accomodate the flammable and commbustible liquids inventory to be within allowable limits for an "S-1" / "M" occupancy. Work to include construction of 1-hour rated occupancy separation walls from floor to bottom of concrete double-'T' roof deck, using non-combustible framing for non-bearing walls; to create the two control areas for hazardous material inventory control; to serve as occupancy separation between the adjacent "S-3" occupancy tenant on the west side, Xtreme Motor Sports; and a 1-hour occupancy separation wall is also required between the front area retail sales area and the storage areas due to the size of the storage area (> 1000 s.f.) and the fact the tenant or building is not sprinklered. The quantities and arrangement of the hazardous materials SHALL be incompliance with the layout plan as presented by the third party hazmat specialist, Will Winslow, to comply Table 3-D & 3-E, 1997 UBC for allowable limits. Purpose of this permit is to regulate the hazardous products to meet code & establish a certificate of occupancy for the tenant in a timely manner. A CERTIFICATE OF OCCUPANCY IS REQUIRED AS A CONDITION OF THIS PERMIT. P.C.#01-269/drs
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/27/2002  
Fee Review-notes4/2/20014/2/20011/29/2002 DONE
FIRE-Final Inspection1/9/20021/11/20021/11/2002APASS
DetailsTroy Cobbley
Fire life/safety finaled OK for perm occ. 1/11/2002 10:13:26 AM
BLD-Framing/Rough-in1/9/20021/11/20021/11/2002PPASS
DetailsTom Arcoraci
###-####
BLD-Final1/11/20021/11/20021/11/2002PPASS
DetailsTom Arcoraci
Added by Inspector: 408 On 1/11/2002 3:07:56 PM ok for perm
Permanent Occupancy 1/11/20021/11/2002 DONE
Details
Permanent occupancy  1/11/2002 DONE
Perm. Occ. Cert. #8990 issued 1-11-01 to Brico of Idaho, Inc.
BLD-Framing/Rough-in12/11/200112/11/200112/11/2001PFAIL
DetailsTom Arcoraci
###-#### cn posted 12/11/2001 2:01:59 PM
FIRE-Final Inspection12/7/200112/10/200112/10/2001PFAIL
DetailsTroy Cobbley
provide approved egress (landings and ramps) at exits and provide electrical corrections per Boise Fire Dept. at the LP tank 12/10/2001 4:15:04 PM
FIRE-Final Inspection11/28/200111/29/200111/29/2001AFAIL
DetailsTroy Cobbley
verify main retail entrance landing slope is OK, relocate exit sign in conference room, repair exit signs, provide fire extinguishers at LP and Fuel Oil tanks, verify no duct detectors are needed 11/29/2001 4:30:51 PM
BLD-Final11/28/200111/28/200111/28/2001PNR
DetailsRuss Owen
doug ###-####needs fire/life safety 11/28/2001 3:48:05 PM
BLD-Final10/1/200110/2/200110/2/2001ANR
DetailsTom Arcoraci
fn doug- ###-####
BLD-Framing/Rough-in9/19/20019/20/20019/20/2001APART
DetailsTom Arcoraci
###-#### ok to cover new 1-hour wall verify other 1-hour wall at next insp 9/20/2001 10:31:16 AM
Issue PAID IN FULL permit  8/21/2001 DONE
Telephone call  8/16/2001 DONE
left mess that permit is ready
Routing - FIRE8/14/20018/15/20018/15/2001 PASS
DetailsBill Alexander
Routing - PLAN CHECK8/15/2001 8/15/2001 PASS
Approved as noted on plans and attached plan review conditions of fire and plan check divisions.
PLANS/APPL TAKEN TO FRONT DESK  8/15/2001 PASS
Routing to permit desk for issue of permit.
Inspection Record Card- Bld  8/15/2001 DONE
Print Occupancy Form  8/15/2001 DONE
Plan assigned to (DRS)4/10/2001 8/15/2001 PASS
DetailsDan Stuart
8/15/2001 11:56:48 DRS - activity updated through activity BLDA022 from case BLD01-00813.
Routing - PLAN CHECK8/14/20018/14/20018/14/2001 PEND
Inserted new plan sheets into plans and routed to fire code analyst.
Plan resubmittals received  8/13/2001  
New plan sheets SP1 & A-2 submitted along with new inventory control update to add LP Fuel used in fork lift and to reduce Nitrous Oxide used in Power Extreme Motorsports from 529 cf to 250 cf, OHH. Also received copies of plan for installation of fuel tanks & dispensing at East side of property, approved by Dave Miller, 9/29/99, and electrical hoo-up for propane tank installed at North end of property under BLD99-02895. Routing to fire dept for re-review.
Routing - FIRE7/20/20017/20/20017/23/2001 FAIL
DetailsBill Alexander
Did not answer questions in regards to motorized vehicle use meeting Article 82 and/or 64.
Routing - PLAN CHECK7/20/20017/20/20017/20/2001 PEND
Routing to fire code analyst for re- review.
Additional plans submitted  7/19/2001 DONE
Received Hazardous Materials Inventory Statement, forwarded same to Dan Stuart. 7/19/01 DAR
Plan Reviewer's activity  5/21/2001  
Recieved fax from Page Dougherty of ICBO confirming a maximum of 2 control areas. I faxed a copy of this response to Cornel Larson with a note to include the other tenant space inventory in the totals of control area 2. He is forwarding to Will Winslow.
Routing - PLAN CHECK4/11/2001 5/21/2001 FAIL
Waiting for aditional information from architect.
Routing - FIRE5/15/20015/18/20015/18/2001 FAIL
DetailsBill Alexander
Code interpretation requires 2, not 4 control areas as established by the reports/documents. Need information on LP storage/dispensing. Fuel Island despensing. Lck information on forklift operations (LP/Battery) and related issues with.
Plan resubmittals received  5/18/2001 DONE
Received plan resubmittals from Larson Architects, two sets of sheets O and A-1, forwarded same to Dan Stuart. 5/18/01 DAR
Plan resubmittals requested  5/18/2001 FAIL
Architect response to control area requirments is still felt to be incorrect. Waiting for ICBO response. If response favors plan check interpretation, the entire building can only be 2 control areas and the hazardous materials inventory for existing tenants will need to be included in the haz mat specialist, Will Winslow, chemical hazardous materials report.
Plan resubmittals requested  5/15/2001 FAIL
Plans incomplete. Exiting, Control Areas and separations in question. Contacted ICBO for interp on control areas.
Routing - PUBLIC WORKS4/10/2001 4/11/2001 PASS
Application received  4/2/2001  
Recd Pcfee & Taken To Pln CK  4/2/2001 DONE
Telephone call  8/17/1999 DONE
Dan West, BriCo of Idaho from Twin Falls Area inquired about obtaining a Certificate of Occupancy for opening an office, retail & storage warehouse at 5858 Franklin Road. Mr. West was instructed to obtain an architect to perform a code analsys of the site and provide floor plans to accompany the analysis to show complying items and means to correct non-complying items. As the warehouse and display / sales area would have quantities of flammable and combustible product, a third party technical expert on hazardous materials was to provide an inventory report for the quantities and classification of each product type to help determine the applicable code occupancy classification & requirements. Mr. west contacted Gregg Ostrow, project architect for SLRMC to see if he would be interested in being the architect for the project. I received calls from Gregg Ostrow concerning the project on 8/24/99 & 8/31/99 after which further contact stopped. It was though that the tenant had found out that the costs to establish his business at this location was more than he desired to spend.

In late October or early November of 2000 the owner of the building applied for a permit to create two new tenant spaces. At this time it was revealed that there were three additional occupancy spaces that had been created in the past and were currently occupied illegally. One of the tenants was BriCo of Idaho. Materials at the site indicated that the tenant was most likely a hazardous occupancy. An outdoor fuel island had been installed and out outside dispensing station for propane gas sales. At this time the owner was notified that the illegal tenants would need to take immediate steps to comply with City of Boise code. A time framwe agreement was provided to guide the developement of plans and submitals for permits to perform code upgrades for the purpose of establishing a certificate of occupancy for the existing tenant and to allw the city to move ahaed with the review and approval of plans to create two ne w vanilla finsh plans for future tenants. The proposed date of plan submittals was Feb. 7, 2001. Plans were submitted with the technical report for review and approval on 4/24/01.
Routing - PLAN CHECK5/18/2001