Letter of compliance | | | 5/25/2001 | | DONE |
|
|
|
Letter of Compliance #21516 issued 5-25-01.
|
BLD-Final | 5/21/2001 | 5/22/2001 | 5/22/2001 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 05/21/2001 at 14:27:27. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/24/2001 | 4/25/2001 | 4/25/2001 | A | PART |
Jim Sly
|
|
|
fr insp- also a eiss insp--rich ###-#### Sheathing OK... paperwork for EFIS Moisture control with contractor. 4/25/2001 1:40:15 PM
|
Issue PAID IN FULL permit | | | 4/16/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/16/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/5/2001 | | PASS |
|
|
|
Copy of application, permit and ER-Report #4962 to permit desk for issuance of permit. Project value set at $38,614.00 per C.V. submitted.
|
Inspection Record Card- Bld | | | 4/5/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 4/5/2001 | | DONE |
|
|
|
|
Telephone call | | | 4/5/2001 | | DONE |
|
|
|
called permit ready, left message
|
Plan assigned to (DRS) | 4/4/2001 | 4/4/2001 | 4/4/2001 | | PASS |
Dan Stuart
|
|
|
4/4/2001 18:07:00 DRS - activity updated through activity BLDA022 from case BLD01-00849.
|
Routing - PLAN CHECK | 4/4/2001 | 4/4/2001 | 4/4/2001 | | PASS |
|
|
|
Established that zoning had approved the exterior modification - CZC01-00038 issued. Obtained an application from the general contractor and the Evaluation Services Report Number based on the specified manufacture. The system selected ER-4962 is approved to be installed on wood frame construction. The report requires the installer be approved by the Parex, Incorporated, parent company and that installation cards be prepared and provided to the structural inspector as a condition of final inspection and approval for the project.
|
Print Pending Permit.LaserJet4 | | | 4/4/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 4/4/2001 | | |
|
|
|
|
Application received | | | 4/4/2001 | | |
|
|
|
|