Permit Information
Permit NumberBLD01-00873
StatusFinaled
Name FLINTZER RICHARD W & DOROTHY E
Site Address 211 N SEAFURY LN
Project NameBETHEL STREET APARTMENTS
Customer Number 
ePlanReviewNo
Description
BUILDING # 11 Type "A" building * To construct a new 4,196 sq.ft. two story, wood framed, four unit apartments building. Each unit is 943 sq.ft with a 60 sq.ft covered pation. The first floor is 2,150 sq.ft and the second floor is 2,046 sq.ft. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. CUP 01-00010 MJP PC#309-01
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/7/20037/7/20037/7/2003 DONE
Permanent occupancy  9/19/2002 DONE
Perm. Occ. Cert. #9363 issued 9-19-02 to the Bethel Street Apts.
BLD-Final8/28/20028/29/20028/29/2002APASS
DetailsTom Arcoraci
late am ###-#### ok for perm occ 8/29/2002 10:25:52 AM
Permanent Occupancy 8/29/20028/29/2002 DONE
Details
Temporary occupancy  8/29/2002 DONE
Temp. Occ. Cert. #4856 isued 8-29-02 to the Bethel Street Apts.
BLD-Final8/27/20028/28/20028/28/2002PFAIL
DetailsRuss Owen
###-#### nick c/n posted. 8/28/2002 3:54:14 PM
FIRE-Final Inspection8/26/20028/27/20028/27/2002APASS
DetailsTroy Cobbley
fire life/safety finaled 8/27/2002 8:43:49 AM
BLD-Energy code compliance7/11/20027/12/20027/12/2002PPASS
DetailsRuss Owen
roger - ###-####also framing ok. 7/12/2002 1:57:30 PM
BLD-Framing/Rough-in7/10/20027/10/20027/10/2002PPART
DetailsRuss Owen
I called the contractor there are no plans or truss calcs on site, he can not get to the plans at this time , I told him he could insulate as I have looked at each unit, but he would need to provide these plans at time of an insulation inspection. He agreed, this person was Jerry, other job contact out with knee surgery who has plans. 7/10/2002 2:42:41 PM
BLD-Framing/Rough-in6/21/20026/21/20026/21/2002PPART
DetailsTom Arcoraci
###-#### ok to side 6/21/2002 2:12:21 PM
BLD-Foundation5/15/20025/16/20025/16/2002PPART
DetailsTom Arcoraci
nick- ###-####
BLD-Foundation5/15/20025/16/20025/16/2002APASS
DetailsRuss Owen
wall brent ###-####
BLD-Footing5/15/20025/15/20025/15/2002PPART
DetailsTom Arcoraci
nick ###-#### ft--
Issue PAID IN FULL permit  5/14/2002 DONE
Print Occupancy Form  11/6/2001 DONE
Inspection Record Card- Bld  11/6/2001 DONE
Telephone call  11/6/2001 DONE
permit ready
Routing - PLANNING Land Div10/30/2001 11/2/2001 PASS
New parcel #'s will need to be entered from subdivision. Routed to Public Works.
Routing - PUBLIC WORKS11/2/2001 11/2/2001 ASS
Plan Reviewer's activity  11/2/2001 PASS
Print Pending Permit.LaserJet4  11/2/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/2/2001 DONE
Case Summary (BLD)  11/2/2001 DONE
Plan assigned to (M_P)4/6/2001 11/2/2001 PASS
DetailsMike Phillips
11/2/2001 15:52:04 M_P - activity updated through activity BLDA022 from case BLD01-00873.
Routing - PLAN CHECK10/5/2001 10/30/2001  
Override - Parcel Holds  10/30/2001  
Override - Parcel Holds  10/30/2001  
Routing - PLUMBING10/5/2001 10/5/2001 PASS
Routing - PLAN CHECK10/2/2001 10/5/2001  
Plan resubmittals received  10/5/2001 DONE
Received two copies of revised sheetsA8.0, A7.1 and one cover letter. Routed to Mike P. kmm
Routing - PLUMBING10/1/2001 10/2/2001 FAIL
Routing - PLAN CHECK9/28/2001 10/1/2001 PEND
Waiting for other to approve prior to issuing permit.
Routing - FIRE9/25/2001 9/26/2001 PASS
Plan resubmittals received  9/25/2001 DONE
Received one copy or revised sheets T-1, SITE, GRD, ST-P, S-1, S-2, DT-1, and one copy of water plan, by United Water Idaho. routed to mike p. kmm
Routing - PLUMBING9/25/2001 9/25/2001 FAIL
submit a civil plan showing water service size and location and 1% min. grade on sewer mains.
Routing - PUBLIC WORKS9/24/2001 9/24/2001 FAIL
Subdivision not recorded yet.
Routing - PLAN CHECK9/13/2001 9/24/2001  
Plan resubmittals received  9/19/2001 DONE
Received two copies of sheets A.1.0, A1.1, A2.0, A2.1, A3.0, A7.1, M1.0, two copies of struct. calcs and one copy of cover letter. Routed to Mike P. KMM
Routing - PLANNING9/12/2001 9/13/2001 PASS
Routing - PLAN CHECK9/7/2001 9/12/2001 HOLD
FAILED IN ALL DIVISIONS. Subdivision in process. Hold waiting for resubmittals.
Routing - PLUMBING9/6/2001 9/7/2001 FAIL
Routing - PLANNING9/4/2001 9/6/2001 FAIL
Plan resubmittals received  9/6/2001 DONE
received 4 sheets of revised site plan and routed to Sev Jones
Plan resubmittals received  9/6/2001 DONE
Received two copies of revised sheets P1.0, P1.1, P2.0. Put with plans and routed to Plumbing. kmm
Routing - PLAN CHECK7/25/2001 8/31/2001  
Routing - PUBLIC WORKS8/31/2001 8/31/2001 FAIL
Subdivision has not been recorded per Addressing.
Routing - FIRE7/23/2001 7/25/2001 FAIL
hydrant locations for entire project.
Routing - PLAN CHECK6/1/2001 7/23/2001 FAIL
Routing to fire.
Plan Reviewer's activity  7/23/2001 FAIL
Additional information required for a further review prior to issuing permit.
Plan Reviewer's activity  6/14/2001 FAIL
Waiting for structural calculations.
Routing - PLUMBING5/23/2001 5/31/2001 FAIL
see plumb. activity on bld01-00863 for details
Routing - PLANNING4/24/2001 5/22/2001 FAIL
Routing - PUBLIC WORKS4/12/2001 4/24/2001 FAIL
requires drainage plan revisions
Plan routing begun/NEW & ADDTN  4/12/2001 DONE
Plans ACCEPTED BY PLAN TECH  4/12/2001 DONE
Received Certificate of Value  4/11/2001 DONE
Override - Parcel Holds  4/6/2001  
Print Pending Permit.LaserJet4  4/6/2001  
Application received  4/6/2001