**(GRACE CHAPEL)** To remodel a 3,341 sq.ft. office building to create a new church per approved plans on file and DRH01-00234. Work to include, demolition of restrooms and removal of exterior porches,new work to include upgrade construction of north wall to one-hour fire resistive construction, construction of two accessible restrooms, construction of two new accessible ramps, three new exterior landings with two new sets of stairs, infill existing openings and installation of new windows, construction of interior partitions to create an assembly room two class rooms storage room break room and restrooms, Installation of new Mechanical system, Miscelaneous related interior finishes, Separate permits required for plumbing, mechaincal and electrical work. Note: A Certificate of Occupancy is required at completion of job and prior to occupying this building. (P.C.#0283-01)*RmH*
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
(F) Reprint permit  9/7/2006 DONE
Fee Review-notes4/6/20014/6/20011/29/2002 DONE
FIRE-Final Inspection7/26/20017/27/20017/27/2001APASS
DetailsJoe Tawney
Reinsp OK for permanant occupancy 7/30/2001 7:55:29 AM
BLD-Final7/27/20017/27/20017/27/2001PPASS
DetailsTom Arcoraci
###-#### ok for perm occ 7/27/2001 2:45:22 AM
Letter of compliance  7/27/2001 DONE
Letter of Compliance #21614 issued 7-27-01.
FIRE-Final Inspection7/20/20017/23/20017/23/2001AFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 7/23/2001 8:55:40 AM
FIRE-Final Inspection7/20/20017/20/20017/20/2001PCANC
DetailsRick Jackson
###-#### inspector #409 didn't have enough time to do the inspection; called general and he will reschedule for 7/23 7/20/2001 4:05:23 PM
BLD-Conference7/18/20017/18/20017/18/2001PPASS
DetailsTom Arcoraci
Bill ###-####
BLD-Framing/Rough-in7/10/20017/11/20017/11/2001PPASS
DetailsDave Hannah
###-#### int walls ok to cover 7/11/2001 2:14:03 PM
BLD-Framing/Rough-in6/21/20016/22/20016/22/2001APASS
DetailsTom Arcoraci
bill ###-#### exterior sheet rock nailing... ext drywall ok 6/21/2001 8:50:36 PM
BLD-Conference6/13/20016/13/20016/13/2001PPASS
DetailsTom Arcoraci
Bill ###-#### ramps to narrow have arch check cabo ansi for curb inside 44 inch width 6/13/2001 3:10:13 AM
Case Summary (BLD)  5/16/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/16/2001 PASS
DetailsRon Hill
Inspection Record Card- Bld  5/16/2001 DONE
Print Occupancy Form  5/16/2001 DONE
Telephone call  5/16/2001 DONE
left mess that permit is ready
Issue PAID IN FULL permit  5/16/2001 DONE
Plan assigned to (R_H)4/27/2001 5/16/2001 PASS
Details
5/16/2001 13:33:14 RMH - activity updated through activity BLDA022 from case BLD01-00880.
Routing - PLAN CHECK5/10/2001 5/16/2001 PASS
DetailsRon Hill
Plan resubmittals received  5/11/2001  
resubmittal 2 each A-0.0-A-1.0--A.2.0 D.1.0 COMMENT LETTER. TOOK TO RON HILL. PE
Routing - FIRE5/7/20015/10/20015/10/2001 PASS
DetailsBill Alexander
Routing - PLAN CHECK4/30/2001 5/7/2001 FAIL
DetailsRon Hill
Faxed and mailed requirements to the architect Randy Haverfield, at 11:30 on 5-07-01, Routed to fire same day.
Meeting  4/30/2001 DONE
Faxed Chris a copy of the church's parcel showing property line. Also faxed a copy of Marlene's email about starting a "density reduction survey" for the parking lot. KMM
Routing - PUBLIC WORKS4/27/2001 4/30/2001 PASS
Routing - PLANNING4/30/2001 4/30/2001 PASS
CHANGE STATUS TO (PND)  4/27/2001 DONE
Per Linda H. I have received missing items. KMM
Plans ACCEPTED BY PLAN TECH  4/27/2001 DONE
Meeting  4/25/2001 DONE
Met with Chris Meade. We decided to seperate into two permits. One for the parking lot and one for the T.I. Chris is to call Bill V. to see if he is going to require a plumb. plan for the intior work. Brian M. spoke to Chris about the drainage for the parking lot. Needs to submit a soils report with the O & M manual. I also reminded Chris about drainage calculation. I gave Chris an application and requirements for the Parking lot. Tempra requested that if they met the conditions of their DR and submitted a landscape plan to her and landscape plans with the T.I., she would be able to sign off on the TI plans before signing off the parking lot. I am to let Linda know when to put plan back into pend. status. KMM
VOIDED CHANGE STATUS  4/19/2001 DONE
changes to job will start over. May reactivate to pend. on the 25th of April if plan submittal is complete. Kmm Lkh
Telephone call  4/17/2001 DONE
Chris Meade is going to have permit expired. I have him talking with Linda to Proceed with the expiration and distribution of funds. Chris will be in to pickup plans after permit is expired. KMM
Telephone call  4/10/2001 DONE
Spoke with Chris Meade. He stated civil requirements should be to me by monday 4/16/01 and mech. around 4/20/01. I accepted this time frame as long as he understood that our time frame of 4 to 7 weeks would not start until I received the civil requirements and could start routing plans at that time. KMM
Plans ACCEPTED BY PLAN TECH  4/9/2001 HOLD
I asked for these items before T.I. and parking lot were going to be seperated into two permits.
Submittal requires 1. Five copies of civil sheets.
2. O&M manual
3. Drainage calculations.
4. Two copies of landscape plans.
Spoke with Mr. Haverfield about above items. He stated they are working on civil and landscape plans. He will let owner know what is need and call me or have them call me back with a time frame. I told Mr. Haverfield we may void permit until above items received (depending on time frame of getting above items to me.) KMM
Received Certificate of Value  4/6/2001 DONE
Application received  4/6/2001