Fee Review-notes | 4/12/2001 | 4/12/2001 | 2/20/2003 | | DONE |
|
|
|
|
BLD-Aging Inspection | 2/4/2003 | 2/4/2003 | 2/4/2003 | | PASS |
Carl Dependahl
|
|
|
shell only, ok, prev. finalled 2/4/2003 4:23:00 PM
|
DOC - Permit Finaled | 2/4/2003 | 2/4/2003 | 2/4/2003 | P | PASS |
Carl Dependahl
|
|
|
Finaled by inspector at 2/4/2003 4:24:44 PM
|
BLD-Final | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/29/2002 4:18:35 PM shell ok for lc
|
BLD-Conference | 3/28/2002 | 3/28/2002 | 3/28/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/28/2002 10:26:10 AM keep t/o open wip...need p& z
|
BLD-Conference | 12/27/2001 | 12/27/2001 | 12/27/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/27/2001 5:19:12 PM w/ Tarrie W...need eng's letter stamped.
|
BLD-Framing/Rough-in | 12/19/2001 | 12/19/2001 | 12/19/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 12/19/2001 10:30:32 AM rec'd eng's letter re bolts/lintels at new openings; ok.
|
BLD-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 | | NR |
Carl Dependahl
|
|
|
wi 12/19/2001 2:51:58 PM wip 12/19/2001 2:52:08 PM
|
BLD-Concrete | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Tom Arcoraci
|
|
|
###-#### wes
|
BLD-Conference | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/15/2001 3:12:38 PM rec'd engs clarification for bolts at concrete.
|
BLD-Conference | 10/5/2001 | 10/5/2001 | 10/5/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/5/2001 9:40:27 AM w/ Arch...eng'r to insp work at existing conc wall, keep c/n pending report.
|
BLD-Conference | 10/2/2001 | 10/2/2001 | 10/2/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/2/2001 12:21:49 PM left c/n re lack of insps...need engs ok for struct work. forwarded thru Id. Comm'l const to arch.
|
Issue PAID IN FULL permit | | | 8/2/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 5/9/2001 | | 6/25/2001 | | PASS |
|
|
|
Approved after review of submitted June 22, 2001 supplemental engineering.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/25/2001 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 6/25/2001 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 4/13/2001 | | 6/25/2001 | | PASS |
Carl Westfall
|
|
|
6/25/01 13:13:22 CJW - activity updated through activity BLDA022 from case BLD01-00917.
|
Plan resubmittals received | | | 6/22/2001 | | DONE |
|
|
|
Received two copies of Supplemental structural calculations and one copy of cover letter. Routed to Carl W. KMM
|
Routing - FIRE | 5/4/2001 | | 5/9/2001 | | PASS |
|
|
|
APPROVED WITHOUT WRITTEN COMMENT
|
Plan Review Completed(1st rev) | | | 5/9/2001 | | |
|
|
|
Failed first UBC review.
|
Routing - PLAN CHECK | 4/16/2001 | | 5/4/2001 | | |
|
|
|
Failed first UBC review.
|
Plan Reviewer's activity | | | 5/3/2001 | | |
|
|
|
Failed first UBC review. UBC plan review started May 3, 2001 and finished the next day. A response from the architect/engineer was required. See the conditions list.
|
Routing - PLANNING | 4/16/2001 | | 4/16/2001 | | PASS |
|
|
|
Jeff Neberman.
|
Application received | | | 4/12/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/12/2001 | | |
|
|
|
|