BLD-Final | 12/4/2001 | 12/5/2001 | 12/5/2001 | A | FAIL |
Tony Young
|
|
|
###-#### RICHARD
need house #s, and finsh pouring outside of driveway 12/5/2001 11:26:27 AM
|
BLD-Final | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | PASS |
Tony Young
|
|
|
###-#### richard 12/5/2001 11:19:16 AM
|
DOC - Permit Finaled | 12/5/2001 | 12/5/2001 | 12/5/2001 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 12/5/2001 2:43:10 PM
|
BLD-Grading Inspection | 12/4/2001 | 12/4/2001 | 12/4/2001 | | PASS |
Rita DeYoung
|
|
|
Final grading is complete and approved.
|
BLD-Aging Inspection | 10/17/2001 | 10/17/2001 | 10/17/2001 | | PART |
Tony Young
|
|
|
wip 10/17/2001 9:51:15 AM
|
BLD-Wall cover | 8/17/2001 | 8/17/2001 | 8/17/2001 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 08/17/2001 at 10:44:50. Contact: .
energy ok 8/17/2001 5:01:52 PM
|
BLD-Framing/Rough-in | 8/14/2001 | 8/14/2001 | 8/14/2001 | P | PASS |
Tony Young
|
|
|
###-####
shear ok per struct. eng. verbal// c/n made ok
ok to insulate 8/14/2001 3:50:10 PM
|
BLD-Framing/Rough-in | 8/8/2001 | 8/9/2001 | 8/9/2001 | A | FAIL |
Tony Young
|
|
|
FR -RE-INSP RICH ###-####
c/n posted, ok to side main level pending engineer approval 8/9/2001 11:06:14 AM
|
BLD-Framing/Rough-in | 8/2/2001 | 8/3/2001 | 8/3/2001 | A | NR |
Russ Owen
|
|
|
###-####. posted c/n needs foam seal package,needs plumbing inspection prior to a frame inspection, also left a note to remove siding for verification of shear nailing,also plans indicates nails I see no nails at any exposed osb,also attached engineering of floor straps and h-clips ,connections etc,may need the engineer to verifiy some of the requirements as plans do not show in clarity,But again no frame inspection done at this time just a general FYI. 8/3/2001 10:29:47 AM
|
BLD-Aging Inspection | 7/16/2001 | 7/16/2001 | 7/16/2001 | | CANC |
Tony Young
|
|
|
wip?? 7/16/2001 9:02:45 AM
|
BLD-Foundation | 5/15/2001 | 5/16/2001 | 5/16/2001 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/15/2001 at 10:29:05. Contact: ###-####.
|
BLD-Footing | 5/14/2001 | 5/15/2001 | 5/15/2001 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 13:40:01. Contact: ###-####.wip, ok w/ verbal corrections 5/15/2001 9:19:26 AM
|
BLD-Foundation | 5/14/2001 | 5/15/2001 | 5/15/2001 | P | CANC |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 05/14/2001 at 13:43:40. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 05/15/2001 at 08:52:48.
|
Issue PAID IN FULL permit | | | 5/10/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/4/2001 | | DONE |
|
|
|
|
Telephone call | | | 5/4/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (DJO) | 4/19/2001 | 4/19/2001 | 5/3/2001 | | PASS |
Dan Overy
|
|
|
5/3/2001 16:15:42 SAM - activity updated through activity BLDA022 from case BLD01-00919.
|
Override - Parcel Holds | | | 5/3/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 5/3/2001 | | |
|
|
|
|
Plan Review Report | | | 5/3/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/3/2001 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 4/20/2001 | | PEND |
|
|
|
have called engineer, architect and builder to discuss problems with plans. shear wall called out at side of powder room (no brg. below), overheight wall engineering, natural light, additional information about shear at front & side of structure, bearing does not align (modify foundation plan), sheet A4.1 (girder left to right?), A4.0 length and bearing location of girder to left of stairs, verify all beam locations. there also may be revisions on beams at rear of stairs (2) 9 1/4" micro-lams 20 ft. long with micro-lam point load (fails). also on sheet A4.0 there are (2) 9 1/4" micro-lams from fireplace to stairs. does this beam pick up roof loads (are trusses multiple bearing at this location?) so far, only the builder has expressed any interest.
|
Routing - PLANNING | 4/18/2001 | 4/18/2001 | 4/19/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 4/19/2001 | | |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 4/12/2001 | 4/12/2001 | 4/18/2001 | | PASS |
Rita DeYoung
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 4/12/2001 | 4/12/2001 | 4/18/2001 | | PASS |
|
|
|
|
Application received | | | 4/12/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 4/19/2001 | 4/19/2001 | | | PEND |
|
|
|
|
Pending Assignment by DJO | 4/12/2001 | | | | PEND |
Dan Overy
|
|
|
|