Fee Review-notes | 4/13/2001 | 4/13/2001 | 12/16/2002 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 8/26/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9318 issued 8-26-02 to the Auto Zone.
|
Permanent Occupancy | | 8/23/2002 | 8/23/2002 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PASS |
Russ Owen
|
|
|
special inspection report ok . 8/23/2002 2:51:36 PM
|
BLD-Final | 8/23/2002 | 8/23/2002 | 8/23/2002 | P | PASS |
Russ Owen
|
|
|
ok for a perm oc. 8/23/2002 2:53:47 PM
|
BLD-Final | 8/20/2002 | 8/20/2002 | 8/20/2002 | P | PART |
Russ Owen
|
|
|
Pending all req signatures, and special inspection approval from engineer. 8/20/2002 3:17:08 PM
|
BLD-Final | 8/15/2002 | 8/16/2002 | 8/16/2002 | P | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 08/15/2002 at 15:22:18. Contact: ###-####. OK for a temp oc needs front door hardware key locks and special insp report approved by the engineer. 8/16/2002 4:06:10 PM c/n posted. 8/16/2002 4:06:15 PM
|
PubWorks Occupancy Approval | 8/13/2002 | 8/13/2002 | 8/13/2002 | | DONE |
|
|
|
Drainage project complete, signed permanent occupancy 8/12/02. M.Strasser
|
FIRE-Final Inspection | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Troy Cobbley
|
|
|
fire life/safety finaled 8/7/2002 8:11:10 AM
|
BLD-Conference | 7/26/2002 | 7/29/2002 | 7/29/2002 | A | PART |
Russ Owen
|
|
|
|
FIRE-Conference | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | DONE |
Troy Cobbley
|
|
|
spoke with the contractor about life/safety requirements prior to the final inspection 7/26/2002 11:02:09 AM
|
BLD-Conference | 7/25/2002 | 7/26/2002 | 7/26/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 07/25/2002 at 14:54:10. Contact: ###-####.
|
BLD-Framing/Rough-in | 7/3/2002 | 7/5/2002 | 7/5/2002 | A | PART |
Tom Arcoraci
|
|
|
ken - ###-#### ok to cover int and front 7/5/2002 10:11:50 AM
|
BLD-Framing/Rough-in | 6/13/2002 | 6/17/2002 | 6/17/2002 | A | PART |
Russ Owen
|
|
|
MASONRY WALL ###-#### SHAWN . did this on 6/14/ pm . ok pending special inspection. 6/17/2002 2:32:25 PM
|
BLD-Footing | 5/29/2002 | 5/31/2002 | 5/31/2002 | P | PART |
Russ Owen
|
|
|
ft insp- drew ###-####. 50 % complete, MTI will perform special inspection. 5/31/2002 4:14:56 PM
|
(F) Reprint permit | | | 4/29/2002 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/26/2002 | | DONE |
|
|
|
|
Telephone call | | | 4/2/2002 | | DONE |
|
|
|
TALKED TO JIM HENDRICK & SAID WILL DEFINITELY PICK UP PERMIT ON THE 14TH OR 15TH OF MAY/TOLD HIM IF THIS DID NOT HAPPEN I WILL VOID PERMIT/MLS
|
Telephone call | | | 2/19/2002 | | DONE |
|
|
|
left mess with jim hendrix that permit is ready--jim hendrix called & still wants permit/mls
|
Plan Reviewer's activity | | | 12/24/2001 | | DONE |
|
|
|
received request for extension of time on application. Extension granted for 180 additional days per UBC Sec. 107.4 to 4-13-2002. MLO
|
Telephone call | | | 11/29/2001 | | DONE |
|
|
|
talked to jim to verify plans are ready/he said will pick up in about a month/mls
|
Office Staff conference/action | | | 7/3/2001 | | DONE |
|
|
|
Jimmy at Auto Zone called to see if he could wait to pick up the permit for a month or two I told him that we would send out a letter he said he would keep in touch 1-###-#### ext 8727
|
Plan assigned to (MLO) | 4/16/2001 | | 7/2/2001 | | PASS |
Mike Otto
|
|
|
7/2/2001 14:50:21 MLO - activity updated through activity BLDA022 from case BLD01-00941.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/2/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/2/2001 | | DONE |
|
|
|
Called Jimmy Hendrix at ###-####
|
Inspection Record Card- Bld | | | 7/2/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 7/2/2001 | | DONE |
|
|
|
|
Routing - FIRE | 6/27/2001 | 6/27/2001 | 6/27/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/27/2001 | | 6/27/2001 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 6/4/2001 | | 6/8/2001 | | FAIL |
|
|
|
Requires drainage plan revision per Brian Murphy. 6/8/01 DAR
|
Routing - FIRE | 5/1/2001 | | 5/4/2001 | | FAIL |
|
|
|
Hdrant flow, rack storage height/commodities versus fire sprinklers--aerosols over exempt amount. Faxed to architect.
|
Plan Review Completed(1st rev) | | | 5/4/2001 | | FAIL |
|
|
|
plans returned to plan review
|
Routing - PLAN CHECK | 4/25/2001 | | 5/1/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 4/24/2001 | | 4/25/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 4/20/2001 | | 4/24/2001 | | PASS |
|
|
|
Approved per DRH00-240.
|
Routing - PUBLIC WORKS | 4/16/2001 | | 4/20/2001 | | FAIL |
|
|
|
Requires drainage plan revision per Brian Murphy. 4/20/01 DAR
|
Plans ACCEPTED BY PLAN TECH | | | 4/16/2001 | | DONE |
|
|
|
Called Jimmy Hendrix and advised him that a O&m manual and 3 more sets of civils are required by Public Works. Also that a seperate permit is required for the Racking. Plus a letter from United Water is required. 4/16/01 DAR
|
Application received | | | 4/13/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/13/2001 | | |
|
|
|
|