Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-00949
StatusVoid/No Violation
Name BROOKSIDE APARTMENTS
Site Address 390 W HALE ST
Project NameBROOKSIDE APARTMENTS
Customer Number 
ePlanReviewNo
Description
VOID 3/5/02 (Section 2 of 2) Building A1.2 * A two hour area separation wall will be constructed to divide this 17 unit apartment building into two separate builings. This section is two stories with a basement and contains 11 units. The basement is 3,858 sq.ft and contains three units and a shell only for a future office. The first floor is 3,831 sq.ft. and contain four units. The second floor is 3,091 sq.ft and contains three units. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. CUP 00-00052 DRH 00-98 MJP
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/10/2007 DONE
(F) Reprint permit  12/10/2007 DONE
VOIDED CHANGE STATUS  3/5/2002 DONE
Fire walls removed and incorporated in to the other building permit for this building.
Plan assigned to (M_P)1/15/2002 3/5/2002 DONE
DetailsMike Phillips
plan modification
Void permit area separation walls removed.
Routing - PLANNING2/5/2002 2/11/2002 PASS
Approved per DRH00-95.
Plan resubmittals received  2/6/2002 DONE
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
Routing - PUBLIC WORKS1/22/2002 2/5/2002 FAIL
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
BLD-Foundation1/22/20021/22/20021/22/2002PPART
DetailsJim Sly
Found rebar appears OK...... Pass pend STRATA concrete PSI OK 1/22/2002 2:37:58 PM
Override - Parcel Holds  1/22/2002  
Routing - PLANNING Land Div1/15/2002 1/22/2002 PASS
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
BLD-Footing1/14/20021/15/20021/15/2002APASS
DetailsJim Storey
###-####
Plan Modification Accepted  1/15/2002  
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
Issue PAID IN FULL permit  12/5/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/21/2001 PASS
Print Occupancy Form  9/21/2001 DONE
Override - Parcel Holds  9/21/2001  
Override - Parcel Holds  9/21/2001  
Inspection Record Card- Bld  9/21/2001 DONE
Plan assigned to (M_P)4/13/2001 9/21/2001 PASS
DetailsMike Phillips
9/21/01 10:58:00 JCM - activity updated through activity BLDA022 from case BLD01-00949.
Routing - PLAN CHECK8/29/2001 9/20/2001 PASS
Plan resubmittals received  9/20/2001 DONE
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
Plan Reviewer's activity  9/20/2001 PASS
Plan resubmittals reviewed and approved with attached comment list and redlined notes added by the architect of record. JCM
Plan resubmittals received  9/17/2001 DONE
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7.
Plan Reviewer's activity  9/5/2001 FAIL
Additional informaiton required for third review.
Routing - FIRE8/24/2001 8/28/2001 PASS
Routing - PLUMBING8/23/2001 8/24/2001 PASS
Sewer design approved per page c-4 resubmitted 7/24/01, reroute plumbing within the buildings to connect to relocated sewer. Per 330
Routing - PLANNING8/21/2001 8/22/2001 PASS
Approved per DRH00-98.
Routing - PLAN CHECK8/7/2001 8/21/2001  
Routing - PLANNING8/3/20018/3/20018/3/2001 PEND
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
Routing - PARKS DEPARTME8/3/20018/3/20018/3/2001 PASS
Approved as per CFH00-00014 (Boise River System).
Routing - FIRE7/27/2001 8/1/2001 FAIL
Routing - PLAN CHECK7/13/2001 7/27/2001 FAIL
Routing to fire.
Plan Reviewer's activity  7/27/2001 FAIL
Additional information required for further review prior to issuing permit.
Routing - PLUMBING7/11/2001 7/13/2001 FAIL
Routing - PLUMBING6/22/2001 7/5/2001 FAIL
Revise page c-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page C4 design
Routing - PARKS DEPARTME6/11/2001 6/21/2001 FAIL
sent via our mail system kmm
Routing - PUBLIC WORKS5/18/2001 6/11/2001 PASS
Routing - PLANNING6/11/2001 6/11/2001 FAIL
Prior to issuance of building paln, need approval by Boise City Parks and Recreation, City Forrester oif landscape plan in riparian area for te-vegetation of trees and shrubs removed by developer. DA
Routing Off Site - STRUCTURAL5/8/2001 6/4/2001 FAIL
contacted PDQ to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
Plans ACCEPTED BY PLAN TECH  5/22/2001 DONE
Plan resubmittals received  5/22/2001 DONE
received drainage calcs. Put with plans. kmm
Plan routing begun/NEW & ADDTN  5/18/2001 DONE
waiting for drainage calcs
Plans ACCEPTED BY PLAN TECH  5/7/2001 DONE
requires drainage cals. contacted rick Marbury at ###-####
Override - Parcel Holds  5/4/2001  
Override - Parcel Holds  5/4/2001  
Recd Pcfee & Taken To Pln CK  5/4/2001 DONE
Override - Parcel Holds  4/16/2001  
Override - Parcel Holds  4/16/2001  
Print Pending Permit.LaserJet4  4/16/2001 DONE
Override - Parcel Holds  4/13/2001  
Override - Parcel Holds  4/13/2001  
Received Certificate of Value  4/13/2001 DONE
Application received  4/13/2001  
Routing Off Site - STRUCTURAL6/29/2001    
resubmittals sent to outside eng. via pdq.
Routing - PLAN CHECK     
Plan Modification
Routing - PLUMBING     
Plan Modification