Case Summary (BLD) | | | 12/10/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/10/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/28/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 3/28/2003 | | |
|
|
|
|
Case Summary (BLD) | | | 3/28/2003 | | |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 9/5/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9333 issued 10-23-02 to the Brookside Apts. by Amy.
|
BLD-Final | 9/3/2002 | 9/3/2002 | 9/3/2002 | P | PASS |
Jim Storey
|
|
|
bruce ###-#### need others sign off. final ok. 9/3/2002 3:53:38 PM
|
Permanent Occupancy | | 9/3/2002 | 9/3/2002 | | DONE |
|
|
|
|
BLD-Final | 8/29/2002 | 8/30/2002 | 8/30/2002 | A | CANC |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
FIRE-Final Inspection | 8/28/2002 | 8/29/2002 | 8/29/2002 | A | FAIL |
Rick Jackson
|
|
|
bruce ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie doors not latching; covers on detectors; need proper pressure gauge on dry sprinkler system 8/29/2002 10:39:51 AM
|
FIRE-Final Inspection | 8/29/2002 | 8/29/2002 | 8/29/2002 | P | PASS |
Rick Jackson
|
|
|
bruce; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Code Occupancy Approval | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Framing/Rough-in | 6/21/2002 | 6/24/2002 | 6/24/2002 | A | PASS |
Jim Storey
|
|
|
BRUCE ###-####
|
BLD-Framing/Rough-in | 6/20/2002 | 6/21/2002 | 6/21/2002 | A | NR |
Jim Storey
|
|
|
BRUCE ###-####
|
Override - Parcel Holds | | | 6/21/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
BLD-Framing/Rough-in | 6/19/2002 | 6/20/2002 | 6/20/2002 | A | NR |
Jim Storey
|
|
|
|
Override - Parcel Holds | | | 6/20/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
BLD-Framing/Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 | P | CANC |
Jim Storey
|
|
|
###-#### bruce out of time. 6/19/2002 6:02:41 PM
|
| | | 6/19/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
BLD-Energy code compliance | 5/31/2002 | 5/31/2002 | 5/31/2002 | P | PART |
Jim Storey
|
|
|
###-#### bruce all but office ok for cover. 5/31/2002 4:55:41 PM
|
| | | 5/31/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
BLD-Framing/Rough-in | 5/29/2002 | 5/29/2002 | 5/29/2002 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 10:36:29. Contact: . complet fire stopping. 5/29/2002 4:59:46 PM
|
Fee Review-notes | 5/28/2002 | 5/28/2002 | 5/28/2002 | | DONE |
|
|
|
resubmittals-changed from 2 permits to 1. additional plan check fees and admin. fees. lh
|
Plan routing begun/NEW & ADDTN | | | 5/18/2002 | | |
|
|
|
waiting for drainage calcs
|
Plan resubmittals received | | | 4/11/2002 | | DONE |
|
|
|
Received revised certificate of value. Routed to Linda Hartwell and Mike Phillips.
|
BLD-Framing/Rough-in | 4/10/2002 | 4/10/2002 | 4/10/2002 | P | NH |
Jim Storey
|
|
|
SHEER ###-#### TIM wrong number. 4/10/2002 4:16:36 PM
|
BLD-Framing/Rough-in | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PART |
Jim Storey
|
|
|
SHEER ###-#### exterior ok for cover. 4/3/2002 3:52:00 PM
|
CHANGE STATUS TO (ISS) | | | 3/29/2002 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 3/8/2002 | | 3/27/2002 | | PASS |
|
|
|
PLAN MODIFICATION
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/27/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/27/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/27/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/15/2002 | | 3/27/2002 | | PASS |
Mike Phillips
|
|
|
3/27/2002 10:10:44 M_P - activity updated through activity BLDA022 from case BLD01-00952.
|
Additional plans submitted | | | 3/20/2002 | | DONE |
|
|
|
Received two sets of additional sheets M1, M2, M3, and M4. Routed to Mike Phillips.
|
Plan resubmittals received | | | 3/15/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets AS1, AS2, CD-1, CP-1, CP-2, CP-3, CP-4, CP-5, CP-6, CP-7, CP-8, CP-9, CP-10, CP-11, CE-1, CE-2, CE-3, CE-4, CE-5, UP1, UP2, UP2a, UP2b, UP3, UP3a, UP6, UP7, D1, D-2, D3, D4, D5, D6, D6A, D7, SH.1, ST-1, and cover letter with response.
|
Routing - FIRE | 3/5/2002 | | 3/7/2002 | | PASS |
Bill Alexander
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 2/14/2002 | | 3/5/2002 | | FAIL |
|
|
|
Plan Modification
Plan review completed additional information required for further review prior to issuing permit.
Routed to Brian Murphy/Public Works. Per Mike Phillips.
|
Override - Parcel Holds | | | 3/1/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: No inspections per plan review. Plan modification in review. For further assistance, talk to Marlene Southard in plan review. Reason for OverRide:
|
BLD-Foundation | 2/21/2002 | 2/21/2002 | 2/21/2002 | P | PASS |
Jim Storey
|
|
|
tim ###-#### found slab ft on grade ok for cover. 2/21/2002 5:19:32 PM
|
Override - Parcel Holds | | | 2/21/2002 | | |
|
|
|
|
Routing - PUBLIC WORKS | 2/19/2002 | | 2/19/2002 | | PASS |
|
|
|
plan modification
|
Routing - PLUMBING | 2/11/2002 | | 2/14/2002 | | PASS |
|
|
|
Plan Modification per plans and 2000 upc
|
BLD-Concrete | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
TIM ###-#### CONCRETE
|
Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
Routing - PLANNING | 2/5/2002 | | 2/11/2002 | | PASS |
|
|
|
Plan Modification approved as per CUP00-00052 and per DRH00-95.
|
BLD-Foundation | 2/8/2002 | 2/8/2002 | 2/8/2002 | P | PASS |
Jim Storey
|
|
|
###-####
|
Override - Parcel Holds | | | 2/8/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
|
Override - Parcel Holds | | | 2/8/2002 | | |
|
|
|
|
Plan resubmittals received | | | 2/6/2002 | | DONE |
|
|
|
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 1/22/2002 | | 2/5/2002 | | FAIL |
|
|
|
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
|
BLD-Footing | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
Override - Parcel Holds | | | 1/29/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/15/2002 | | 1/22/2002 | | PASS |
|
|
|
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
|
Plan Modification Accepted | | | 1/15/2002 | | |
|
|
|
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
|
Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/13/2001 | | 9/21/2001 | | PASS |
Mike Phillips
|
|
|
9/21/01 10:58:55 JCM - activity updated through activity BLDA022 from case BLD01-00952.
|
Routing - PLAN CHECK | 8/29/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
Plan Reviewer's activity | | | 9/20/2001 | | PASS |
|
|
|
Plan resubmittals approved as submitted with attached comment list and relined notes added by the architect of record. JCM
|
Plan resubmittals received | | | 9/17/2001 | | DONE |
|
|
|
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7.
|
Plan Reviewer's activity | | | 9/5/2001 | | FAIL |
|
|
|
Additional informaiton required for third review.
|
Routing - FIRE | 8/24/2001 | | 8/28/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/23/2001 | | 8/24/2001 | | PASS |
|
|
|
Sewer design approved per page c-4 resubmitted 7/24/01, reroute plumbing within the buildings to connect to relocated sewer. Per 330
|
Routing - PLANNING | 8/21/2001 | | 8/22/2001 | | PASS |
|
|
|
Approved per DRH00-98.
|
Routing - PLAN CHECK | 8/7/2001 | | 8/21/2001 | | |
|
|
|
|
Routing - PLANNING | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PEND |
|
|
|
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
|
Routing - PARKS DEPARTME | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PASS |
|
|
|
Approved as per CFH00-00014 (Boise River System).
|
Routing - FIRE | 7/27/2001 | | 8/1/2001 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/29/2001 | | 7/27/2001 | | PASS |
|
|
|
resubmittals sent to outside eng via pdq
|
Routing - PLAN CHECK | 7/13/2001 | | 7/27/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 7/27/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
Plan resubmittals received | | | 7/25/2001 | | DONE |
|
|
|
Received 5 sets of plan resubmittals from Marbury Engineering, sheets C3 and C4. Forwarded same to Mike Phillips.
|
Routing - PLUMBING | 7/11/2001 | | 7/13/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 6/22/2001 | | 7/5/2001 | | FAIL |
|
|
|
revise page C-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page C4 design
|
Routing - PARKS DEPARTME | 6/11/2001 | | 6/22/2001 | | FAIL |
|
|
|
sent via our mail system. KMM
|
Routing - PUBLIC WORKS | 5/18/2001 | | 6/11/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2001 | | 6/11/2001 | | FAIL |
|
|
|
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
|
Routing Off Site - STRUCTURAL | 5/8/2001 | | 6/4/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/22/2001 | | DONE |
|
|
|
received drainage calcs. put with plans. kmm
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | PEND |
|
|
|
requires drainage calcs. contacted Rick Marbury ###-####
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | DONE |
|
|
|
|
Received Certificate of Value | | | 4/13/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/13/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/13/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/13/2001 | | |
|
|
|
|
Application received | | | 4/13/2001 | | FAIL |
|
|
|
|