Plan assigned to (M_P) | 1/15/2002 | | 3/5/2002 | | DONE |
Mike Phillips
|
|
|
plan modification
Fire walls removed and incorporated in to the other building permit for this building.
|
VOIDED CHANGE STATUS | | | 3/5/2002 | | DONE |
|
|
|
Fire walls removed and incorporated in to the other building permit for this building.
|
BLD-Foundation | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PASS |
Jim Storey
|
|
|
|
Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
BLD-Footing | 2/7/2002 | 2/8/2002 | 2/8/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
Override - Parcel Holds | | | 2/7/2002 | | |
|
|
|
|
Plan resubmittals received | | | 2/6/2002 | | DONE |
|
|
|
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 1/22/2002 | | 2/5/2002 | | FAIL |
|
|
|
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
|
Routing - PLANNING Land Div | 1/15/2002 | | 1/22/2002 | | PASS |
|
|
|
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
|
Plan Modification Accepted | | | 1/15/2002 | | |
|
|
|
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
|
Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/16/2001 | | 9/21/2001 | | PASS |
Mike Phillips
|
|
|
9/21/01 11:00:18 JCM - activity updated through activity BLDA022 from case BLD01-00961.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/29/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
Plan Reviewer's activity | | | 9/20/2001 | | PASS |
|
|
|
Plan resubmittals reviewed and approved with attached coment list and redlines added by the architect of record. JCM
|
Plan Reviewer's activity | | | 9/5/2001 | | FAIL |
|
|
|
Additional informaiton required for third review.
|
Routing - FIRE | 8/24/2001 | | 8/28/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/23/2001 | | 8/24/2001 | | PASS |
|
|
|
Sewer design approved per page c-4 resubmitted 7/245/01, reroute plumbing within the buildings to connect to relocated sewer. Per 330
|
Routing - PLANNING | 8/21/2001 | | 8/22/2001 | | PASS |
|
|
|
Approved per DRH00-98.
|
Routing - PLAN CHECK | 8/7/2001 | | 8/21/2001 | | |
|
|
|
|
Routing - PLANNING | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PEND |
|
|
|
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
|
Routing - PARKS DEPARTME | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PASS |
|
|
|
Approved as per CFH00-00014 (Boise River System).
|
Routing - FIRE | 7/27/2001 | | 8/1/2001 | | DONE |
|
|
|
hydrant flow
|
Routing Off Site - STRUCTURAL | 6/29/2001 | | 7/27/2001 | | PASS |
|
|
|
resubmittals sent to outside eng. via pdq
|
Routing - PLAN CHECK | 7/13/2001 | | 7/27/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 7/27/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
Routing - PLUMBING | 7/11/2001 | | 7/13/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 6/22/2001 | | 7/5/2001 | | FAIL |
|
|
|
revise page cp4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page C4 design
|
Routing - PARKS DEPARTME | 6/11/2001 | | 6/21/2001 | | FAIL |
|
|
|
sent via our mail system. KMM
|
Routing - PUBLIC WORKS | 5/18/2001 | | 6/11/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2001 | | 6/11/2001 | | FAIL |
|
|
|
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
|
Routing Off Site - STRUCTURAL | 5/8/2001 | | 6/4/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/22/2001 | | DONE |
|
|
|
received drainage calcs. put with plans. KMM
|
Plan routing begun/NEW & ADDTN | | | 5/18/2001 | | |
|
|
|
waiting for drainage calcs
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | PEND |
|
|
|
Requires drainage calcs. Contacted Rick Marbury ###-####. KMM
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Application received | | | 4/16/2001 | | |
|
|
|
|
Received Certificate of Value | | | 4/13/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
Plan Modification
|
Routing - PLUMBING | | | | | |
|
|
|
Plan Modification
|
Routing - PLANNING | 2/5/2002 | | | | |
|
|
|
Plan Modification
|