Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-00964
StatusFinaled
Name INLAND CONSTRUCTION
Site Address 356 W HALE ST
Project NameBROOKSIDE APARTMENTS
Customer Number 
ePlanReviewNo
Description
Building C2 * MODIFICATION 01/14.02 * To construct a new 19,077 sq.ft. three story, wood framed, 18 unit apartment building. NOTE: This building is fully fire sprinklered per alternate signed & approved by Tim Hogland for second exit from the third floor. Each floor is 6,359 sq.ft. and contains 2- two bedroom, two bath units and 2- one bedroom, one bath units. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. CUP 00-00052 DR14628 00-98 MJP PC # 02-027 Two, two hour area separation wall will be constructed to divide this 18 unit apartment building into three separate builings. This section is two stories with a basement and contains 6 units. The basement is 1,627 sq.ft and contains two units. The first floor is 1,579 sq.ft. and contain two units. The second floor is 1,579 sq.ft and contains two units. All construction per the approved plans, attached comment list and CABO/ANSI A117.1. CUP 00-00052 DRH 00-98 MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/10/2007 DONE
(F) Reprint permit  12/10/2007 DONE
Permanent occupancy UNPAID FEE  10/22/2002 DONE
Perm. Occ. Cert. #9416 issued 10-22-02 to the Brookside Apts.
BLD-Final9/25/20029/26/20029/26/2002APASS
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
Permanent Occupancy 9/26/20029/26/2002 DONE
Details
BLD-Final8/15/20028/16/20028/16/2002APART
DetailsJim Storey
###-#### bruce 8/15/2002 4:13:00 PM final ok pending plm. temp sign off to perm. 8/16/2002 9:32:29 AM
Temporary occupancy  8/16/2002 DONE
Temp. Occ. Cert. #4849 issued 8-16-02 to the Brookside Apts.
BLD-Final8/15/20028/15/20028/15/2002PCANC
DetailsJim Storey
###-#### bruce clone out of time after micron insp. will do insp in am. called contractor. 8/15/2002 4:14:25 PM
Code Occupancy Approval8/9/20028/9/20028/9/2002PPASS
DetailsWm. Michael Meloy
BLD-Final8/7/20028/8/20028/8/2002AFAIL
DetailsJim Storey
###-#### BRUCE/ not ready 8/8/2002 11:06:47 AM
FIRE-Final Inspection8/6/20028/7/20028/7/2002APASS
DetailsRick Jackson
BRUCE; Phone #: ###-####
FIRE-Final Inspection7/31/20028/1/20028/1/2002ACANC
DetailsRick Jackson
Scheduled by a contractor via Hello! on 07/31/2002 at 11:24:11. Contact: ###-####. alarms not pretested by contractor 8/1/2002 9:05:52 AM
Code Occupancy Approval7/19/20027/19/20027/19/2002PCANC
DetailsWm. Michael Meloy
BLD-Framing/Rough-in5/30/20025/30/20025/30/2002PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/30/2002 at 07:04:12. Contact: . soffits ok for cover. 5/30/2002 3:03:44 PM
BLD-Framing/Rough-in5/29/20025/29/20025/29/2002APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/29/2002 at 07:17:14. Contact: . ok to insulate walls. slamer studs/draft stop/access at over builds/ girder trussess nailling. 5/29/2002 5:00:51 PM
Fee Review-notes5/28/20025/28/20025/28/2002 DONE
resubmittals-changed from 2 permits to 1. additional plan check fees and admin. fees. lh
BLD-Framing/Rough-in5/24/20025/24/20025/24/2002PNR
DetailsJim Storey
###-#### bruce
   5/24/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
BLD-Framing/Rough-in5/7/20025/7/20025/7/2002PPART
DetailsJim Storey
fire caulking tim ###-#### first tower ok pending mech. 5/7/2002 4:36:38 PM
BLD-Energy code compliance4/19/20024/22/20024/22/2002APASS
DetailsJim Storey
tim -###-#### energy code framing c/n made ok insulation ok for cover. per approved plan. 4/22/2002 11:32:00 AM
BLD-Energy code compliance4/18/20024/18/20024/18/2002PPART
DetailsJim Storey
###-#### PRE ROCK AREA ONLY furnce and shower/tubs ok. 4/18/2002 2:16:08 PM
Override - Parcel Holds  4/18/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
BLD-Framing/Rough-in4/16/20024/17/20024/17/2002APART
DetailsJim Storey
fr insp -tim- ###-#### wip / 4/17/2002 1:42:53 PM
BLD-Framing/Rough-in4/12/20024/15/20024/15/2002ACANC
DetailsJim Storey
###-####--cancel per tim
BLD-Framing/Rough-in4/12/20024/15/20024/15/2002ACANC
DetailsJim Storey
###-####
BLD-Framing/Rough-in4/15/20024/15/20024/15/2002PPART
DetailsJim Storey
fr insp -tim ###-#### wip ok to insulate walls only. 4/15/2002 4:37:37 PM
Plan resubmittals received  4/11/2002 DONE
Received revised certificate of value. Routed to Linda Hartwell and Mike Phillips.
BLD-Conference4/2/20024/3/20024/3/2002ACANC
DetailsJim Storey
john ###-#### for conf
BLD-Conference4/2/20024/3/20024/3/2002ACANC
DetailsJim Storey
john ###-#### for conf
BLD-Conference4/1/20024/2/20024/2/2002AFAIL
DetailsJim Storey
###-#### c/n isued. 4/2/2002 4:07:44 PM
BLD-Framing/Rough-in3/29/20023/29/20023/29/2002PPASS
DetailsJim Storey
tim ###-#### fr
CHANGE STATUS TO (ISS)  3/29/2002 DONE
Override - Parcel Holds  3/28/2002  
PLANS/APPL TAKEN TO FRONT DESK  3/27/2002 DONE
Override - Parcel Holds  3/27/2002  
Print Pending Permit.LaserJet4  3/27/2002 DONE
Case Summary (BLD)  3/27/2002 DONE
Override - Parcel Holds  3/27/2002  
Inspection Record Card- Bld  3/27/2002 DONE
Print Occupancy Form  3/27/2002 DONE
Plan assigned to (M_P)1/15/2002 3/27/2002 PASS
DetailsMike Phillips
3/27/2002 10:58:35 M_P - activity updated through activity BLDA022 from case BLD01-00964.
Routing - PLAN CHECK3/8/2002 3/27/2002 PASS
Additional plans submitted  3/20/2002 DONE
Received two sets of additional sheets M1, M2, M3, and M4. Routed to Mike Phillips.
Plan resubmittals received  3/15/2002 DONE
Received two sets of resubmittal sheets AS1, AS2, CD-1, CP-1, CP-2, CP-3, CP-4, CP-5, CP-6, CP-7, CP-8, CP-9, CP-10, CP-11, CE-1, CE-2, CE-3, CE-4, CE-5, UP1, UP2, UP2a, UP2b, UP3, UP3a, UP6, UP7, D1, D-2, D3, D4, D5, D6, D6A, D7, SH.1, ST-1, and cover letter with response.
Routing - FIRE3/5/2002 3/7/2002 PASS
DetailsBill Alexander
Plan Modification
Routing - PLAN CHECK2/14/2002 3/5/2002 FAIL
Plan Modification
Plan review complete additional informaiton required for further review prior to issuing permit.
Routed to Brian Murphy/Public Works. Per Mike Phillips.
BLD-Framing/Rough-in2/27/20022/27/20022/27/2002PPART
DetailsTom Arcoraci
###-#### john ok to set tubs ok cover furance area ok to cover stair lids andwalls 2/27/2002 3:55:49 PM
Override - Parcel Holds  2/27/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No inspections per plan review. Plan modification in review. For further assistance, talk to Marlene Southard in plan review. Reason for OverRide:
Override - Parcel Holds  2/27/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: No inspections per plan review. Plan modification in review. For further assistance, talk to Marlene Southard in plan review. Reason for OverRide: nothing to do with mod.
Routing - PUBLIC WORKS2/19/2002 2/19/2002 PASS
plan modification
Routing - PLUMBING2/11/2002 2/14/2002 PASS
Plan Modification per plans and 2000 upc
BLD-Concrete2/12/20022/12/20022/12/2002PPART
DetailsJim Storey
CONCRETE TIM ###-####
BLD-Framing/Rough-in2/12/20022/12/20022/12/2002PPART
DetailsJim Storey
###-#### shear
Override - Parcel Holds  2/12/2002  
Override - Parcel Holds  2/12/2002 DONE
DetailsRita DeYoung
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide: area not mod.
Override - Parcel Holds  2/12/2002  
Routing - PLANNING2/5/2002 2/11/2002 PASS
Plan Modification approved as per CUP00-00052 and per DRH00-95.
Plan resubmittals received  2/6/2002 DONE
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
Routing - PUBLIC WORKS1/22/2002 2/5/2002 FAIL
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
BLD-Framing/Rough-in2/1/20022/1/20022/1/2002PPART
DetailsJim Storey
###-#### sheer 2/4/2002 3:22:46 PM
Override - Parcel Holds  2/1/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
Override - Parcel Holds  2/1/2002  
BLD-Framing/Rough-in1/25/20021/25/20021/25/2002PPART
DetailsJim Storey
###-#### JOHN 1st fl sheer at party walls ok 1/25/2002 3:24:56 PM
BLD-Framing/Rough-in1/22/20021/22/20021/22/2002PPART
DetailsJim Sly
###-#### john Should have been Conc slab insp...... Poured W/O City insp..... Need Letter Special insp. 1/22/2002 2:45:59 PM
Override - Parcel Holds  1/22/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
Override - Parcel Holds  1/22/2002 DONE
DetailsAnnett Moore
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
Override - Parcel Holds  1/22/2002  
Routing - PLANNING Land Div1/15/2002 1/22/2002 PASS
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
Plan Modification Accepted  1/15/2002  
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
BLD-Concrete1/8/20021/9/20021/9/2002APASS
DetailsJim Storey
john ###-#### concrete wall
BLD-Footing12/27/200112/28/200112/28/2001APASS
DetailsJim Storey
###-#### ft 12/28/2001 10:54:23 AM
Issue PAID IN FULL permit  12/5/2001 DONE
Plan assigned to (M_P)4/16/2001 9/21/2001 PASS
DetailsMike Phillips
9/21/01 11:00:45 JCM - activity updated through activity BLDA022 from case BLD01-00964.
PLANS/APPL TAKEN TO FRONT DESK  9/21/2001 PASS
Print Occupancy Form  9/21/2001 DONE
Override - Parcel Holds  9/21/2001  
Override - Parcel Holds  9/21/2001  
Inspection Record Card- Bld  9/21/2001 DONE
Routing - PLAN CHECK8/29/2001 9/20/2001 PASS
Plan resubmittals received  9/20/2001 DONE
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
Plan Reviewer's activity  9/20/2001 PASS
Plan resubmittals reviewed and approved with attached comment list and redlines added by the architect of record. JCM
Plan resubmittals received  9/17/2001 DONE
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7
Plan Reviewer's activity  9/5/2001 FAIL
Additional informaiton required for third review.
Routing - FIRE8/24/2001 8/28/2001 PASS
Routing - PLUMBING8/23/2001 8/24/2001 PASS
Sewer design approved per page c-4 resubmitted 7/24/01, rerout plumbing with in the buildings to connect to relocated sewer. Per 330
Routing - PLANNING8/21/2001 8/22/2001 PASS
Approved per DRH00-98.
Routing - PLAN CHECK8/7/2001 8/21/2001  
Routing - PLANNING8/3/20018/3/20018/3/2001 PEND
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
Routing - PARKS DEPARTME8/3/20018/3/20018/3/2001 PASS
Approved as per CFH00-00014 (Boise River System).
Routing - FIRE7/27/2001 8/1/2001 FAIL
Routing Off Site - STRUCTURAL6/29/2001 7/27/2001 PASS
resubmittals sent to outside eng via pdq
Routing - PLAN CHECK7/13/2001 7/27/2001 FAIL
Routing to fire.
Plan Reviewer's activity  7/27/2001 FAIL
Additional information required for further review prior to issuing permit.
Routing - PLUMBING7/11/2001 7/15/2001 FAIL
Routing - PLUMBING6/22/2001 7/5/2001 FAIL
revise page c-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page C4 design
Routing - PARKS DEPARTME6/11/2001 6/21/2001 FAIL
sent via our mail system. KMM
Routing - PUBLIC WORKS5/18/2001 6/11/2001 PASS
Routing - PLANNING6/11/2001 6/11/2001 FAIL
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
Routing Off Site - STRUCTURAL5/8/2001 6/4/2001 FAIL
Contacted pdq to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
Plans ACCEPTED BY PLAN TECH  5/7/2001 DONE
Requires drainage calcs. Contacted Rick Marbury at ###-#### KMM
Override - Parcel Holds  5/4/2001  
Override - Parcel Holds  5/4/2001  
Recd Pcfee & Taken To Pln CK  5/4/2001 DONE
Override - Parcel Holds  4/16/2001  
Override - Parcel Holds  4/16/2001  
Print Pending Permit.LaserJet4  4/16/2001  
Application received  4/16/2001  
Received Certificate of Value  4/13/2001 DONE
Plan routing begun/NEW & ADDTN