Case Summary (BLD) | | | 12/10/2007 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/10/2007 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 10/22/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9416 issued 10-22-02 to the Brookside Apts.
|
BLD-Final | 9/25/2002 | 9/26/2002 | 9/26/2002 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
Permanent Occupancy | | 9/26/2002 | 9/26/2002 | | DONE |
|
|
|
|
BLD-Final | 8/15/2002 | 8/16/2002 | 8/16/2002 | A | PART |
Jim Storey
|
|
|
###-#### bruce 8/15/2002 4:13:00 PM final ok pending plm. temp sign off to perm. 8/16/2002 9:32:29 AM
|
Temporary occupancy | | | 8/16/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4849 issued 8-16-02 to the Brookside Apts.
|
BLD-Final | 8/15/2002 | 8/15/2002 | 8/15/2002 | P | CANC |
Jim Storey
|
|
|
###-#### bruce clone out of time after micron insp. will do insp in am. called contractor. 8/15/2002 4:14:25 PM
|
Code Occupancy Approval | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
BLD-Final | 8/7/2002 | 8/8/2002 | 8/8/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### BRUCE/ not ready 8/8/2002 11:06:47 AM
|
FIRE-Final Inspection | 8/6/2002 | 8/7/2002 | 8/7/2002 | A | PASS |
Rick Jackson
|
|
|
BRUCE; Phone #: ###-####
|
FIRE-Final Inspection | 7/31/2002 | 8/1/2002 | 8/1/2002 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 07/31/2002 at 11:24:11. Contact: ###-####. alarms not pretested by contractor 8/1/2002 9:05:52 AM
|
Code Occupancy Approval | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | CANC |
Wm. Michael Meloy
|
|
|
|
BLD-Framing/Rough-in | 5/30/2002 | 5/30/2002 | 5/30/2002 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/30/2002 at 07:04:12. Contact: . soffits ok for cover. 5/30/2002 3:03:44 PM
|
BLD-Framing/Rough-in | 5/29/2002 | 5/29/2002 | 5/29/2002 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 05/29/2002 at 07:17:14. Contact: . ok to insulate walls. slamer studs/draft stop/access at over builds/ girder trussess nailling. 5/29/2002 5:00:51 PM
|
Fee Review-notes | 5/28/2002 | 5/28/2002 | 5/28/2002 | | DONE |
|
|
|
resubmittals-changed from 2 permits to 1. additional plan check fees and admin. fees. lh
|
BLD-Framing/Rough-in | 5/24/2002 | 5/24/2002 | 5/24/2002 | P | NR |
Jim Storey
|
|
|
###-#### bruce
|
| | | 5/24/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
BLD-Framing/Rough-in | 5/7/2002 | 5/7/2002 | 5/7/2002 | P | PART |
Jim Storey
|
|
|
fire caulking tim ###-#### first tower ok pending mech. 5/7/2002 4:36:38 PM
|
BLD-Energy code compliance | 4/19/2002 | 4/22/2002 | 4/22/2002 | A | PASS |
Jim Storey
|
|
|
tim -###-#### energy code framing c/n made ok insulation ok for cover. per approved plan. 4/22/2002 11:32:00 AM
|
BLD-Energy code compliance | 4/18/2002 | 4/18/2002 | 4/18/2002 | P | PART |
Jim Storey
|
|
|
###-#### PRE ROCK AREA ONLY furnce and shower/tubs ok. 4/18/2002 2:16:08 PM
|
Override - Parcel Holds | | | 4/18/2002 | | DONE |
Rita DeYoung
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
BLD-Framing/Rough-in | 4/16/2002 | 4/17/2002 | 4/17/2002 | A | PART |
Jim Storey
|
|
|
fr insp -tim- ###-#### wip / 4/17/2002 1:42:53 PM
|
BLD-Framing/Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | CANC |
Jim Storey
|
|
|
###-####--cancel per tim
|
BLD-Framing/Rough-in | 4/12/2002 | 4/15/2002 | 4/15/2002 | A | CANC |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 4/15/2002 | 4/15/2002 | 4/15/2002 | P | PART |
Jim Storey
|
|
|
fr insp -tim ###-#### wip ok to insulate walls only. 4/15/2002 4:37:37 PM
|
Plan resubmittals received | | | 4/11/2002 | | DONE |
|
|
|
Received revised certificate of value. Routed to Linda Hartwell and Mike Phillips.
|
BLD-Conference | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | CANC |
Jim Storey
|
|
|
john ###-#### for conf
|
BLD-Conference | 4/2/2002 | 4/3/2002 | 4/3/2002 | A | CANC |
Jim Storey
|
|
|
john ###-#### for conf
|
BLD-Conference | 4/1/2002 | 4/2/2002 | 4/2/2002 | A | FAIL |
Jim Storey
|
|
|
###-#### c/n isued. 4/2/2002 4:07:44 PM
|
BLD-Framing/Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 | P | PASS |
Jim Storey
|
|
|
tim ###-#### fr
|
CHANGE STATUS TO (ISS) | | | 3/29/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/28/2002 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/27/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/27/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/27/2002 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 1/15/2002 | | 3/27/2002 | | PASS |
Mike Phillips
|
|
|
3/27/2002 10:58:35 M_P - activity updated through activity BLDA022 from case BLD01-00964.
|
Routing - PLAN CHECK | 3/8/2002 | | 3/27/2002 | | PASS |
|
|
|
|
Additional plans submitted | | | 3/20/2002 | | DONE |
|
|
|
Received two sets of additional sheets M1, M2, M3, and M4. Routed to Mike Phillips.
|
Plan resubmittals received | | | 3/15/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets AS1, AS2, CD-1, CP-1, CP-2, CP-3, CP-4, CP-5, CP-6, CP-7, CP-8, CP-9, CP-10, CP-11, CE-1, CE-2, CE-3, CE-4, CE-5, UP1, UP2, UP2a, UP2b, UP3, UP3a, UP6, UP7, D1, D-2, D3, D4, D5, D6, D6A, D7, SH.1, ST-1, and cover letter with response.
|
Routing - FIRE | 3/5/2002 | | 3/7/2002 | | PASS |
Bill Alexander
|
|
|
Plan Modification
|
Routing - PLAN CHECK | 2/14/2002 | | 3/5/2002 | | FAIL |
|
|
|
Plan Modification
Plan review complete additional informaiton required for further review prior to issuing permit.
Routed to Brian Murphy/Public Works. Per Mike Phillips.
|
BLD-Framing/Rough-in | 2/27/2002 | 2/27/2002 | 2/27/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### john ok to set tubs ok cover furance area ok to cover stair lids andwalls 2/27/2002 3:55:49 PM
|
Override - Parcel Holds | | | 2/27/2002 | | DONE |
Rita DeYoung
|
|
|
Parcel Tag Notes: No inspections per plan review. Plan modification in review. For further assistance, talk to Marlene Southard in plan review. Reason for OverRide:
|
Override - Parcel Holds | | | 2/27/2002 | | DONE |
Rita DeYoung
|
|
|
Parcel Tag Notes: No inspections per plan review. Plan modification in review. For further assistance, talk to Marlene Southard in plan review. Reason for OverRide: nothing to do with mod.
|
Routing - PUBLIC WORKS | 2/19/2002 | | 2/19/2002 | | PASS |
|
|
|
plan modification
|
Routing - PLUMBING | 2/11/2002 | | 2/14/2002 | | PASS |
|
|
|
Plan Modification per plans and 2000 upc
|
BLD-Concrete | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
CONCRETE TIM ###-####
|
BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
###-#### shear
|
Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 2/12/2002 | | DONE |
Rita DeYoung
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide: area not mod.
|
Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
Routing - PLANNING | 2/5/2002 | | 2/11/2002 | | PASS |
|
|
|
Plan Modification approved as per CUP00-00052 and per DRH00-95.
|
Plan resubmittals received | | | 2/6/2002 | | DONE |
|
|
|
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 1/22/2002 | | 2/5/2002 | | FAIL |
|
|
|
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
|
BLD-Framing/Rough-in | 2/1/2002 | 2/1/2002 | 2/1/2002 | P | PART |
Jim Storey
|
|
|
###-#### sheer 2/4/2002 3:22:46 PM
|
Override - Parcel Holds | | | 2/1/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
|
Override - Parcel Holds | | | 2/1/2002 | | |
|
|
|
|
BLD-Framing/Rough-in | 1/25/2002 | 1/25/2002 | 1/25/2002 | P | PART |
Jim Storey
|
|
|
###-#### JOHN 1st fl sheer at party walls ok 1/25/2002 3:24:56 PM
|
BLD-Framing/Rough-in | 1/22/2002 | 1/22/2002 | 1/22/2002 | P | PART |
Jim Sly
|
|
|
###-#### john Should have been Conc slab insp...... Poured W/O City insp..... Need Letter Special insp. 1/22/2002 2:45:59 PM
|
Override - Parcel Holds | | | 1/22/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
|
Override - Parcel Holds | | | 1/22/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide:
|
Override - Parcel Holds | | | 1/22/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/15/2002 | | 1/22/2002 | | PASS |
|
|
|
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
|
Plan Modification Accepted | | | 1/15/2002 | | |
|
|
|
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
|
BLD-Concrete | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PASS |
Jim Storey
|
|
|
john ###-#### concrete wall
|
BLD-Footing | 12/27/2001 | 12/28/2001 | 12/28/2001 | A | PASS |
Jim Storey
|
|
|
###-#### ft 12/28/2001 10:54:23 AM
|
Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/16/2001 | | 9/21/2001 | | PASS |
Mike Phillips
|
|
|
9/21/01 11:00:45 JCM - activity updated through activity BLDA022 from case BLD01-00964.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
|
|
|
|
Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/29/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
Plan Reviewer's activity | | | 9/20/2001 | | PASS |
|
|
|
Plan resubmittals reviewed and approved with attached comment list and redlines added by the architect of record. JCM
|
Plan resubmittals received | | | 9/17/2001 | | DONE |
|
|
|
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7
|
Plan Reviewer's activity | | | 9/5/2001 | | FAIL |
|
|
|
Additional informaiton required for third review.
|
Routing - FIRE | 8/24/2001 | | 8/28/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/23/2001 | | 8/24/2001 | | PASS |
|
|
|
Sewer design approved per page c-4 resubmitted 7/24/01, rerout plumbing with in the buildings to connect to relocated sewer. Per 330
|
Routing - PLANNING | 8/21/2001 | | 8/22/2001 | | PASS |
|
|
|
Approved per DRH00-98.
|
Routing - PLAN CHECK | 8/7/2001 | | 8/21/2001 | | |
|
|
|
|
Routing - PLANNING | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PEND |
|
|
|
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
|
Routing - PARKS DEPARTME | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PASS |
|
|
|
Approved as per CFH00-00014 (Boise River System).
|
Routing - FIRE | 7/27/2001 | | 8/1/2001 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/29/2001 | | 7/27/2001 | | PASS |
|
|
|
resubmittals sent to outside eng via pdq
|
Routing - PLAN CHECK | 7/13/2001 | | 7/27/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 7/27/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
Routing - PLUMBING | 7/11/2001 | | 7/15/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 6/22/2001 | | 7/5/2001 | | FAIL |
|
|
|
revise page c-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page C4 design
|
Routing - PARKS DEPARTME | 6/11/2001 | | 6/21/2001 | | FAIL |
|
|
|
sent via our mail system. KMM
|
Routing - PUBLIC WORKS | 5/18/2001 | | 6/11/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2001 | | 6/11/2001 | | FAIL |
|
|
|
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
|
Routing Off Site - STRUCTURAL | 5/8/2001 | | 6/4/2001 | | FAIL |
|
|
|
Contacted pdq to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | DONE |
|
|
|
Requires drainage calcs. Contacted Rick Marbury at ###-#### KMM
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/16/2001 | | |
|
|
|
|
Application received | | | 4/16/2001 | | |
|
|
|
|
Received Certificate of Value | | | 4/13/2001 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | | | |
|
|
|
|