| Case Summary (BLD) | | | 12/10/2007 | | DONE |
|
|
|
|
| (F) Reprint permit | | | 12/10/2007 | | DONE |
|
|
|
|
| Permanent occupancy UNPAID FEE | | | 10/22/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9414 issued 10-22-02 to the Brookside Apts.
|
| FIRE-Final Inspection | 8/2/2002 | 8/2/2002 | 8/2/2002 | P | FAIL |
Rick Jackson
|
|
|
###-#### tim low air for dry sprinkler system; extinguishers needed 8/2/2002 4:17:15 PM
|
| BLD-Final | 7/30/2002 | 7/31/2002 | 7/31/2002 | A | PASS |
Jim Storey
|
|
|
bruce ; Phone #: ###-####teno ok pending plm. 7/31/2002 2:20:37 PM
|
| Temporary occupancy | | | 7/31/2002 | | |
|
|
|
|
| Temporary occupancy | | | 7/31/2002 | | DONE |
|
|
|
Temp. Occ. Cert. #4843 issued 7-31-02 to the Brookside Apts.
|
| FIRE-Final Inspection | 7/29/2002 | 7/30/2002 | 7/30/2002 | A | PASS |
Rick Jackson
|
|
|
TIM ###-####
|
| Permanent Occupancy | | 7/30/2002 | 7/30/2002 | | DONE |
|
|
|
|
| FIRE-Final Inspection | 7/23/2002 | 7/24/2002 | 7/24/2002 | A | FAIL |
Rick Jackson
|
|
|
tim ###-#### need resubmittals for horn circuits; extinguishers; knox box keys; test horn circuits 7/24/2002 5:02:09 PM
|
| Code Occupancy Approval | 7/19/2002 | 7/19/2002 | 7/19/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
| Fee Review-notes | 5/28/2002 | 5/28/2002 | 5/28/2002 | | DONE |
|
|
|
resubmittals-changed from 2 permits to 1. additional plan check fees and admin. fees. lh
|
| BLD-Conference | 5/22/2002 | 5/23/2002 | 5/23/2002 | A | PASS |
Jim Storey
|
|
|
Ask for Chris the drywaller on site
|
| BLD-Energy code compliance | 5/21/2002 | 5/22/2002 | 5/22/2002 | P | CANC |
Jim Storey
|
|
|
conf. 5/22/2002 2:37:14 PM
|
| BLD-Framing/Rough-in | 5/22/2002 | 5/22/2002 | 5/22/2002 | P | PASS |
Jim Storey
|
|
|
BRUCE ###-#### sofits ok for cover. 5/22/2002 2:53:14 PM
|
| Override - Parcel Holds | | | 5/22/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
| Override - Parcel Holds | | | 5/22/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
| BLD-Framing/Rough-in | 5/21/2002 | 5/21/2002 | 5/21/2002 | P | CANC |
Jim Storey
|
|
|
###-#### pending mech insp. 5/21/2002 2:22:16 PM
|
| BLD-Framing/Rough-in | 5/14/2002 | 5/15/2002 | 5/16/2002 | A | PASS |
Jim Storey
|
|
|
tim ###-#### fr
|
| BLD-Energy code compliance | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PASS |
Jim Storey
|
|
|
###-#### tim ok to rock/need reinsp on drop soffits. 5/1/2002 4:31:14 PM
|
| Override - Parcel Holds | | | 4/30/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
| BLD-Framing/Rough-in | 4/29/2002 | 4/29/2002 | 4/29/2002 | P | PASS |
Jim Storey
|
|
|
###-#### TIM c/n made ok 4/29/2002 2:39:59 PM
|
| Override - Parcel Holds | | | 4/29/2002 | | DONE |
Annett Moore
|
|
|
Parcel Tag Notes: FEES OWED ON SWR02-00446, 02-00448, 02-00449 & 00-00451: TO BE PAID BEFORE OCCUPANCY Reason for OverRide:
|
| BLD-Framing/Rough-in | 4/25/2002 | 4/25/2002 | 4/25/2002 | P | PART |
Jim Storey
|
|
|
fr tim ###-#### nail trusses to girder/ complet draft stop/ok to insulate walls only. 4/25/2002 4:17:48 PM
|
| Plan resubmittals received | | | 4/11/2002 | | DONE |
|
|
|
Received revised certificate of value. Routed to Linda Hartwell and Mike Phillips.
|
| CHANGE STATUS TO (ISS) | | | 3/29/2002 | | DONE |
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 3/27/2002 | | DONE |
|
|
|
|
| Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
| Print Pending Permit.LaserJet4 | | | 3/27/2002 | | DONE |
|
|
|
|
| Case Summary (BLD) | | | 3/27/2002 | | DONE |
|
|
|
|
| Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
| Inspection Record Card- Bld | | | 3/27/2002 | | DONE |
|
|
|
per Mike print card and collect fees on the Mod. bld01-00972
|
| Print Occupancy Form | | | 3/27/2002 | | DONE |
|
|
|
|
| Plan assigned to (M_P) | 1/15/2002 | | 3/27/2002 | | PASS |
Mike Phillips
|
|
|
3/27/2002 11:01:47 M_P - activity updated through activity BLDA022 from case BLD01-00967.
|
| Routing - PLAN CHECK | 3/8/2002 | | 3/27/2002 | | PASS |
|
|
|
PLAN MODIFICATION
|
| Additional plans submitted | | | 3/20/2002 | | DONE |
|
|
|
Received two sets of additional sheets M1, M2, M3, and M4. Routed to Mike Phillips.
|
| Plan resubmittals received | | | 3/15/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets AS1, AS2, CD-1, CP-1, CP-2, CP-3, CP-4, CP-5, CP-6, CP-7, CP-8, CP-9, CP-10, CP-11, CE-1, CE-2, CE-3, CE-4, CE-5, UP1, UP2, UP2a, UP2b, UP3, UP3a, UP6, UP7, D1, D-2, D3, D4, D5, D6, D6A, D7, SH.1, ST-1, and cover letter with response.
|
| Routing - FIRE | 3/5/2002 | | 3/7/2002 | | PASS |
Bill Alexander
|
|
|
Plan Modification
|
| Routing - PLAN CHECK | 2/14/2002 | | 3/5/2002 | | FAIL |
|
|
|
Plan Modification
PLan review complete additional information required for further review prior to issuing permit.
Routed to Brian Murphy/Public Works. Per Mike Phillips.
|
| Override - Parcel Holds | | | 3/5/2002 | | |
|
|
|
|
| Print Pending Permit.LaserJet4 | | | 3/5/2002 | | |
|
|
|
|
| BLD-Framing/Rough-in | 2/22/2002 | 2/22/2002 | 2/22/2002 | P | PART |
Tom Arcoraci
|
|
|
###-#### wip 2/22/2002 4:25:31 PM
|
| Override - Parcel Holds | | | 2/22/2002 | | |
|
|
|
|
| BLD-Framing/Rough-in | 2/15/2002 | 2/19/2002 | 2/19/2002 | A | PART |
Jim Storey
|
|
|
shear wall--john ###-#### 1st fl;oor ok 2/19/2002 11:56:25 AM
|
| Routing - PUBLIC WORKS | 2/19/2002 | | 2/19/2002 | | PASS |
|
|
|
Plan Modification
|
| Override - Parcel Holds | | | 2/15/2002 | | |
|
|
|
|
| Routing - PLUMBING | 2/11/2002 | | 2/14/2002 | | PASS |
|
|
|
Plan Modification per plans and 2000 upc
|
| BLD-Concrete | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
CONCRETE TIM ###-####
|
| BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
|
| Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
| Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
| Routing - PLANNING | 2/5/2002 | | 2/11/2002 | | PASS |
|
|
|
Plan Modification approved as per CUP00-00052 and per DRH00-95.
|
| Plan resubmittals received | | | 2/6/2002 | | DONE |
|
|
|
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
|
| Routing - PUBLIC WORKS | 1/22/2002 | | 2/5/2002 | | FAIL |
|
|
|
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
|
| BLD-Foundation | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Jim Storey
|
|
|
TIM ###-#### REBAR INSPECTION
|
| Override - Parcel Holds | | | 1/29/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide: THIS HAS NOTHING TO DO WITH PLAN MOD
|
| Override - Parcel Holds | | | 1/29/2002 | | |
|
|
|
|
| Routing - PLANNING Land Div | 1/15/2002 | | 1/22/2002 | | PASS |
|
|
|
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
|
| BLD-Foundation | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
| Plan Modification Accepted | | | 1/15/2002 | | |
|
|
|
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
|
| BLD-Footing | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PASS |
Jim Storey
|
|
|
ft insp john ###-####
|
| Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
| PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
|
|
|
|
| Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
| Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
| Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
| Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
| Plan assigned to (M_P) | 4/16/2001 | | 9/21/2001 | | PASS |
Mike Phillips
|
|
|
9/21/01 11:02:10 JCM - activity updated through activity BLDA022 from case BLD01-00967.
|
| Routing - PLAN CHECK | 8/29/2001 | | 9/20/2001 | | PASS |
|
|
|
|
| Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
| Plan Reviewer's activity | | | 9/20/2001 | | PASS |
|
|
|
Plan resubmittals reviewed and approved with attached comment list and redlines added by the architect of record. JCM
|
| Plan resubmittals received | | | 9/17/2001 | | DONE |
|
|
|
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7.
|
| Plan Reviewer's activity | | | 9/5/2001 | | FAIL |
|
|
|
Additional informaiton required for third review.
|
| Routing - FIRE | 8/24/2001 | | 8/28/2001 | | PASS |
|
|
|
|
| Routing - PLUMBING | 8/23/2001 | | 8/24/2001 | | PASS |
|
|
|
|
| Routing - PLANNING | 8/21/2001 | | 8/22/2001 | | PASS |
|
|
|
Approved per DRH00-98.
|
| Routing - PLAN CHECK | 8/7/2001 | | 8/21/2001 | | |
|
|
|
|
| Routing - PLANNING | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PEND |
|
|
|
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
|
| Routing - PARKS DEPARTME | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PASS |
|
|
|
Approved as per CFH00-00014 (Boise River System).
|
| Routing - FIRE | 7/21/2001 | | 8/1/2001 | | FAIL |
|
|
|
|
| Routing - PLAN CHECK | 7/13/2001 | | 7/27/2001 | | FAIL |
|
|
|
Routing to fire.
|
| Plan Reviewer's activity | | | 7/27/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
| Routing Off Site - STRUCTURAL | 6/29/2001 | | 7/27/2001 | | PASS |
|
|
|
resubmittals sent to outside eng. via pdq
|
| Routing - PLUMBING | 7/11/2001 | | 7/13/2001 | | FAIL |
|
|
|
|
| Routing - PLUMBING | 6/22/2001 | | 7/5/2001 | | FAIL |
|
|
|
revise page c-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page c-4 design.
|
| Routing - PARKS DEPARTME | 6/11/2001 | | 6/21/2001 | | FAIL |
|
|
|
sent via our mail system. KMM
|
| Routing - PUBLIC WORKS | 5/18/2001 | | 6/11/2001 | | PASS |
|
|
|
|
| Routing - PLANNING | 6/11/2001 | | 6/11/2001 | | FAIL |
|
|
|
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
|
| Routing Off Site - STRUCTURAL | 5/8/2001 | | 6/4/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
|
| Plans ACCEPTED BY PLAN TECH | | | 5/22/2001 | | DONE |
|
|
|
Received drainage calcs. Put with plans. kmm
|
| Plan resubmittals received | | | 5/22/2001 | | DONE |
|
|
|
Received drainage calcs. Put with plans. KMM
|
| Plan routing begun/NEW & ADDTN | | | 5/18/2001 | | |
|
|
|
still waiting for drainage calcs.
|
| Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | PEND |
|
|
|
Requires drainage calcs. Contaced Rick Marbury ###-####
|
| Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
| Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
| Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | DONE |
|
|
|
|
| Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
| Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
| Print Pending Permit.LaserJet4 | | | 4/16/2001 | | |
|
|
|
|
| Application received | | | 4/16/2001 | | |
|
|
|
|
| Received Certificate of Value | | | 4/13/2001 | | DONE |
|
|
|
|