Plan assigned to (M_P) | 1/15/2002 | | 3/5/2002 | | DONE |
Mike Phillips
|
|
|
plan modification
Fire walls removed and incorporated in to the other building permit for this building.
|
VOIDED CHANGE STATUS | | | 3/5/2002 | | DONE |
|
|
|
Fire walls removed and incorporated in to the other building permit for this building.
|
BLD-Framing/Rough-in | 2/12/2002 | 2/12/2002 | 2/12/2002 | P | PART |
Jim Storey
|
|
|
|
Override - Parcel Holds | | | 2/12/2002 | | |
|
|
|
|
Plan resubmittals received | | | 2/6/2002 | | DONE |
|
|
|
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 1/22/2002 | | 2/5/2002 | | FAIL |
|
|
|
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
|
BLD-Foundation | 1/29/2002 | 1/30/2002 | 1/30/2002 | A | PASS |
Jim Storey
|
|
|
TIM ###-#### REBAR INSPECTION
|
Override - Parcel Holds | | | 1/29/2002 | | |
|
|
|
|
BLD-Foundation | 1/14/2002 | 1/15/2002 | 1/15/2002 | A | PASS |
Jim Storey
|
|
|
###-####
|
Plan Modification Accepted | | | 1/15/2002 | | |
|
|
|
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
|
BLD-Footing | 1/8/2002 | 1/9/2002 | 1/9/2002 | A | PASS |
Jim Storey
|
|
|
john ###-#### ft insp
|
Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/16/2001 | | 9/21/2001 | | PASS |
Mike Phillips
|
|
|
9/21/01 11:03:05 JCM - activity updated through activity BLDA022 from case BLD01-00971.
|
Routing - PLAN CHECK | 8/29/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
Plan Reviewer's activity | | | 9/20/2001 | | PASS |
|
|
|
Plan resubmittals reviewed and approved with attached comment list and redlines added by the architect of record. JCM
|
Plan resubmittals received | | | 9/17/2001 | | DONE |
|
|
|
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7
|
Plan Reviewer's activity | | | 9/5/2001 | | FAIL |
|
|
|
Additional informaiton required for third review.
|
Routing - FIRE | 8/24/2001 | | 8/28/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/23/2001 | | 8/24/2001 | | PASS |
|
|
|
Sewer design approved per page c-4 resubmitted 7/24/01, reroute plumbing within the buildings to connect to relocated sewer. Per 330
|
Routing - PLANNING | 8/21/2001 | | 8/22/2001 | | PASS |
|
|
|
Approved per DRH00-98.
|
Routing - PLAN CHECK | 8/7/2001 | | 8/21/2001 | | |
|
|
|
|
Routing - PLANNING | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PEND |
|
|
|
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
|
Routing - PARKS DEPARTME | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PASS |
|
|
|
Approved as per CFH00-00014 (Boise River System).
|
Routing - FIRE | 7/27/2001 | | 8/1/2001 | | FAIL |
|
|
|
|
Routing Off Site - STRUCTURAL | 6/29/2001 | | 7/27/2001 | | PASS |
|
|
|
resubmittals sent to outside eng. via pdq
|
Routing - PLAN CHECK | 7/13/2001 | | 7/27/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 7/27/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
Routing - PLUMBING | 7/5/2001 | | 7/13/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 6/22/2001 | | 7/5/2001 | | FAIL |
|
|
|
revised page c-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page c4 design
|
Routing - PARKS DEPARTME | 6/11/2001 | | 6/21/2001 | | FAIL |
|
|
|
sent via our mail system kmm
|
Routing - PUBLIC WORKS | 5/18/2001 | | 6/11/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2001 | | 6/11/2001 | | FAIL |
|
|
|
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
|
Routing Off Site - STRUCTURAL | 5/8/2001 | | 6/4/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/22/2001 | | DONE |
|
|
|
Received drainage calcs. Put with plans. KMM
|
Plan routing begun/NEW & ADDTN | | | 5/18/2001 | | DONE |
|
|
|
still waiting for drainage calcs
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | PEND |
|
|
|
Requires drainage calcs. Contacted Rick Marbury ###-####
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/16/2001 | | |
|
|
|
|
Application received | | | 4/16/2001 | | |
|
|
|
|
Received Certificate of Value | | | 4/13/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | | | | | |
|
|
|
Plan Modification
|
Routing - PLUMBING | | | | | |
|
|
|
Plan Modification
|
Routing - PLANNING | 2/5/2002 | | | | |
|
|
|
Plan Modification
|
Routing - PLANNING Land Div | 1/15/2002 | | | | |
|
|
|
Plan Modification
|