Second Notice BLD | 4/26/2005 | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/6/2003 | 4/26/2005 | | DONE |
|
|
|
|
DOC - Permit Finaled | 12/6/2003 | 12/6/2003 | 12/6/2003 | P | PASS |
Jim Storey
|
|
|
Finaled by inspector at 12/6/2003 5:57:48 PM
|
BLD-Aging Inspection | 12/5/2003 | 12/5/2003 | 12/5/2003 | | PASS |
Jim Storey
|
|
|
|
Fee Review-notes | 7/8/2003 | 7/8/2003 | 7/8/2003 | | DONE |
|
|
|
|
Permanent Occupancy | | 9/24/2002 | 9/24/2002 | | DONE |
|
|
|
|
Permanent occupancy | | | 9/24/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9377 issued 9-24-02 to Brookside Apts. for a 9 bay parking garage.
|
Permanent occupancy | | | 9/24/2002 | | DONE |
|
|
|
Perm. Occ. Cert. #9377 issued 9-24-02 to Brookside Apts. for a garage bldg.
|
FIRE-Final Inspection | 9/17/2002 | 9/18/2002 | 9/18/2002 | A | PASS |
Rick Jackson
|
|
|
###-####
|
BLD-Final | 9/18/2002 | 9/18/2002 | 9/18/2002 | P | PASS |
Jim Storey
|
|
|
bruce--for a gar; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Code Occupancy Approval | 8/9/2002 | 8/9/2002 | 8/9/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
Inspection Record Card- Bld | | | 8/1/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/1/2002 | | DONE |
|
|
|
|
Code Occupancy Approval | 7/12/2002 | 7/12/2002 | 7/12/2002 | P | PASS |
Wm. Michael Meloy
|
|
|
|
Plan resubmittals received | | | 4/11/2002 | | DONE |
|
|
|
Received revised certificate of value. Routed to Linda Hartwell and Mike Phillips.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/28/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/28/2002 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 3/28/2002 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/28/2002 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 3/28/2002 | | |
|
|
|
|
Override - Parcel Holds | | | 3/28/2002 | | |
|
|
|
|
Routing - PLAN CHECK | 3/8/2002 | | 3/28/2002 | | PASS |
|
|
|
|
Plan assigned to (M_P) | 1/15/2002 | | 3/28/2002 | | PASS |
Mike Phillips
|
|
|
3/28/2002 08:51:29 M_P - activity updated through activity BLDA022 from case BLD01-00972.
|
Override - Parcel Holds | | | 3/27/2002 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/27/2002 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/27/2002 | | DONE |
|
|
|
|
Additional plans submitted | | | 3/20/2002 | | DONE |
|
|
|
Received two sets of additional sheets M1, M2, M3, and M4. Routed to Mike Phillips.
|
Plan resubmittals received | | | 3/15/2002 | | DONE |
|
|
|
Received two sets of resubmittal sheets AS1, AS2, CD-1, CP-1, CP-2, CP-3, CP-4, CP-5, CP-6, CP-7, CP-8, CP-9, CP-10, CP-11, CE-1, CE-2, CE-3, CE-4, CE-5, UP1, UP2, UP2a, UP2b, UP3, UP3a, UP6, UP7, D1, D-2, D3, D4, D5, D6, D6A, D7, SH.1, ST-1, and cover letter with response.
|
Routing - FIRE | 3/5/2002 | | 3/7/2002 | | PASS |
Bill Alexander
|
|
|
Plan Modification
|
Routing - PUBLIC WORKS | 2/19/2002 | | 2/19/2002 | | PASS |
|
|
|
Plan Modification
|
Routing - PLUMBING | 2/11/2002 | | 2/14/2002 | | PASS |
|
|
|
Plan Modification per plans and 2000 upc
|
Routing - PLANNING | 2/5/2002 | | 2/11/2002 | | PASS |
|
|
|
Plan Modification approved as per CUP00-00052 pending Design Review approval.
|
Plan resubmittals received | | | 2/6/2002 | | DONE |
|
|
|
Received five copies of resubmittal sheet LS-2 with transmittal letter. Routed to Mike Phillips.
|
Routing - PUBLIC WORKS | 1/22/2002 | | 2/5/2002 | | FAIL |
|
|
|
Plan Modification
Requires Drainage Plan - Flood Plain Review Fails.
|
BLD-Foundation | 2/4/2002 | 2/4/2002 | 2/4/2002 | P | PASS |
Jim Storey
|
|
|
TIM - ###-#### walls ok 2/4/2002 3:24:12 PM
|
Override - Parcel Holds | | | 2/4/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide: INSPECTION
|
Override - Parcel Holds | | | 2/4/2002 | | |
|
|
|
|
BLD-Foundation | 1/30/2002 | 1/31/2002 | 1/31/2002 | A | PASS |
Jim Storey
|
|
|
TIM ###-#### ft ok 1/31/2002 9:07:50 AM
|
Override - Parcel Holds | | | 1/30/2002 | | DONE |
Darla L Downs
|
|
|
Parcel Tag Notes: plans in for modification, okay to have inspections in areas not being modified per mike phillips. Reason for OverRide: FOUNDATION INSPECTION ONLY
|
Override - Parcel Holds | | | 1/30/2002 | | |
|
|
|
|
Routing - PLANNING Land Div | 1/15/2002 | | 1/22/2002 | | PASS |
|
|
|
Land division ok for this parcel only. This is currently being re-subdivided along with adjacent parcels, so they are only allowed to have permits on this parcel (Lot 1, Block 7, Denise Place Subdivision) until the new subdivision is recorded. Please see SUB01-00081 / Denise Place II for further information. Routed to Public Works. (blc)
|
Plan Modification Accepted | | | 1/15/2002 | | |
|
|
|
Plan Modification excepted for Brookside Apartments for the redesign of the apartment buildings to include three-stories. Routed to Mike Phillips.
|
CHANGE STATUS TO (PND) | | | 1/14/2002 | | DONE |
|
|
|
RECEIVED PLAN MODIFICATION
|
(F) Reprint permit | | | 12/6/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/5/2001 | | DONE |
|
|
|
|
CHANGE ISSUED DATE | | | 12/5/2001 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2001 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 9/21/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/21/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/21/2001 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 4/16/2001 | | 9/21/2001 | | PASS |
Mike Phillips
|
|
|
9/21/01 11:03:31 JCM - activity updated through activity BLDA022 from case BLD01-00972.
|
Routing - PLAN CHECK | 8/29/2001 | | 9/20/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/20/2001 | | DONE |
|
|
|
Received two copies of revised sheets CE-1, CE-2, D-5, D-8, S-2, S-4 & S-6, one copy of cover letter. Routed to John M.
|
Plan resubmittals received | | | 9/17/2001 | | DONE |
|
|
|
received 2 revised copies of CP1, 2, 3, 4, 5, & 6, UP2 & UP2a, D4, 5, & 7
|
Plan Reviewer's activity | | | 9/5/2001 | | FAIL |
|
|
|
Additional informaiton required for third review.
|
Routing - FIRE | 8/24/2001 | | 8/28/2001 | | PASS |
|
|
|
|
Routing - PLUMBING | 8/23/2001 | | 8/24/2001 | | PASS |
|
|
|
Sewer design approved per page c-4 resubmitted 7/24/01, reroute plumbing within the buildings to connect to relocated sewer. Per 330
|
Routing - PLANNING | 8/21/2001 | | 8/22/2001 | | PASS |
|
|
|
Approved per DRH00-98.
|
Routing - PLAN CHECK | 8/7/2001 | | 8/21/2001 | | |
|
|
|
|
Plan resubmittals received | | | 8/15/2001 | | DONE |
|
|
|
Received two sets of plan resubmittals from Trout Architects, forwarded same to Mike Phillips. 8/15/01 DAR
|
Routing - PLANNING | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PEND |
|
|
|
Approved as per CUP00-00052 and CFH00-00014 (Boise River System). Pending Design Review approval.
|
Routing - PARKS DEPARTME | 8/3/2001 | 8/3/2001 | 8/3/2001 | | PASS |
|
|
|
Approved as per CFH00-00014 (Boise River System).
|
Routing - FIRE | 7/21/2001 | | 8/1/2001 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 7/13/2001 | | 7/27/2001 | | FAIL |
|
|
|
Routing to fire.
|
Plan Reviewer's activity | | | 7/27/2001 | | FAIL |
|
|
|
Additional information required for further review prior to issuing permit.
|
Routing Off Site - STRUCTURAL | 6/29/2001 | | 7/27/2001 | | PASS |
|
|
|
resubmittals sent to outside eng. via pdq
|
Routing - PLUMBING | 7/11/2001 | | 7/13/2001 | | FAIL |
|
|
|
|
Routing - PLUMBING | 6/22/2001 | | 7/5/2001 | | FAIL |
|
|
|
revise page c-4 to obtain a min. .06% grade between manholes, revise pages P1 and P3 to grade sewer to match page C4 design
|
Routing - PARKS DEPARTME | 6/11/2001 | | 6/21/2001 | | FAIL |
|
|
|
sent via our mail system kmm
|
Routing - PUBLIC WORKS | 5/18/2001 | | 6/11/2001 | | PASS |
|
|
|
|
Routing - PLANNING | 6/11/2001 | | 6/11/2001 | | FAIL |
|
|
|
Prior to issuance of building plan, need approval by Boise City Parks and Recreation, City Parks and Recreation, City Forrester of landscape plan in riparian area for re-vegetation of trees and shrubs removed by developer. DA
|
Routing Off Site - STRUCTURAL | 5/8/2001 | | 6/4/2001 | | FAIL |
|
|
|
Contacted PDQ to take plans to outside eng. KMM
Second review required by outside engineering firm MJP 6/4/01.
|
Plans ACCEPTED BY PLAN TECH | | | 5/22/2001 | | DONE |
|
|
|
|
Plan resubmittals received | | | 5/22/2001 | | DONE |
|
|
|
received drainage calcs put with plans. KMM
|
Plan routing begun/NEW & ADDTN | | | 5/18/2001 | | DONE |
|
|
|
waiting for drainage calcs
|
Plans ACCEPTED BY PLAN TECH | | | 5/7/2001 | | PEND |
|
|
|
Requires drainage clacs. Contacted Rick Marbury at ###-####
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 5/4/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 4/16/2001 | | |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 4/16/2001 | | |
|
|
|
|
Application received | | | 4/16/2001 | | |
|
|
|
|
Received Certificate of Value | | | 4/13/2001 | | DONE |
|
|
|
|