(F) Reprint permit | | | 2/14/2002 | | DONE |
|
|
|
|
Fee Review-notes | 4/19/2001 | 4/19/2001 | 1/30/2002 | | DONE |
|
|
|
|
BLD-Final | 1/10/2002 | 1/11/2002 | 1/11/2002 | A | PASS |
Tom Arcoraci
|
|
|
###-#### ok for perm 1/11/2002 9:32:40 AM
|
Letter of compliance | | | 1/11/2002 | | DONE |
|
|
|
Letter of Compliance #22118 issued 1-11-02.
|
BLD-Final | 12/21/2001 | 12/27/2001 | 12/27/2001 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 407 On 12/21/2001 5:19:08 PM see 2 c/notices 12/27/2001 11:35:31 AM
|
BLD-Final | 12/19/2001 | 12/21/2001 | 12/21/2001 | P | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 11:35:33. Contact: ###-####.
|
FIRE-Final Inspection | 10/24/2001 | 10/25/2001 | 10/25/2001 | P | PASS |
Troy Cobbley
|
|
|
Smoke detectors relocated and fire ext. installed 10/26/2001 7:52:40 AM
|
BLD-Final | 10/24/2001 | 10/25/2001 | 10/25/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/24/2001 at 11:28:14. Contact: ###-####. ok for temp occ left c/notice with contractor 10/25/2001 4:50:05 PM
|
BLD-Framing/Rough-in | 10/16/2001 | 10/16/2001 | 10/16/2001 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### DAVID doors in occ sep missing, door in cat walk missing, glass in fire doors missing, doors in steam boiler room missing, smoke seals missing at pass thru door in clean room 10/16/2001 5:12:32 PM 10/16/2001 5:13:54 PM
|
FIRE-Final Inspection | 10/12/2001 | 10/15/2001 | 10/15/2001 | P | PASS |
Troy Cobbley
|
|
|
OK for perm occ. Extinguishers are inplace but not perm. mounted. I will return to verify placement. 10/15/2001 2:24:01 PM
|
FIRE-Final Inspection | 10/15/2001 | 10/15/2001 | 10/15/2001 | P | PASS |
Troy Cobbley
|
|
|
Added by Inspector: 430 On 10/15/2001 4:45:25 PM Fire alarm system and fire sprinkler system OK for perm. occ.
|
BLD-Framing/Rough-in | 10/10/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/10/2001 at 13:07:16. Contact: ###-####. fire stopping around piping in 1hr and 2hr walls in basement 10/12/2001 4:11:27 PM
|
Telephone call | | | 10/3/2001 | | DONE |
|
|
|
Called Tom Brophy, Architect, LCA, to have him contact the sprinkler & alarm design persons and to ask that they contact Bill Alexander for sprinkler design submittal requirement and Sam Rogers for alarm permit requirements for modifications proposed to be made in the 3/6 LINK area to create 60 foot pedestrian walkway (uninhabited) before the deferred submittal plans can be turned loose.
|
Additional plans submitted | | | 10/2/2001 | | |
|
|
|
Deferred plan submittals for converting the 3/6 link into pedestrian walkway per section 409 UBC for 60 feet measured from face of building #6, with remainder of link becoming part of building #3 for use as "B" occupancy office use. Also to upgrade 1-hour occupancy separation at walls surrounding and the structural supports (columns, beams) for floor system above the PH Adjust Room 6-034 as required for a Control Area for hazardous materials per UBC Tables 3-D & 3-E, footnote #1, 1997 UBC. Sheets A0.0, A2.10, A2.11, A9.1, A9.3, FP2.1.2, M2.0.4, M2.2.2, M2.2.2D, E2.0.DC, E2.3D, E2.1L, E2.1P, E2.1F, E1.0FA, & E1.0FB WERE SUBMITTED SHOWNG AREAS TO BE DEMOLISHED AND NEW WORK TO BE DONE TO COMPLEE CODE COMPLIANCE FOR THESE AREAS UNDER BLD01-01007, ISSUED 8/13/01.
10/2/01 - Reviewed deferred plans with Bill Alexander for sprinkler modifications and Sam Rogers for Alarm system modifications. Separate FIR permits required. Noted on plans and attachments to plans.
|
BLD-Conference | 9/26/2001 | 9/27/2001 | 9/27/2001 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 09/26/2001 at 16:27:11. Contact: ###-####. Walk thru.... 9/27/2001 9:49:56 AM
|
BLD-Framing/Rough-in | 9/18/2001 | 9/19/2001 | 9/19/2001 | A | PART |
Tom Arcoraci
|
|
|
###-#### clean room grid ok 9/19/2001 11:41:23 AM
|
BLD-Conference | 8/22/2001 | 8/22/2001 | 8/22/2001 | A | PASS |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 8/22/2001 10:36:28 PM wip ok
|
BLD-Framing/Rough-in | 8/13/2001 | 8/14/2001 | 8/14/2001 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by Inspector: 408 On 8/13/2001 1:54:45 AM ed 6310245
|
BLD-Framing/Rough-in | 8/9/2001 | 8/13/2001 | 8/13/2001 | A | PART |
Tom Arcoraci
|
|
|
fr insp dave -###-#### will recall plans not on site 8/12/2001 9:54:40 PM
|
Issue PAID IN FULL permit | | | 8/13/2001 | | |
|
|
|
|
CHANGE ISSUED DATE | | | 8/13/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/6/2001 | | 8/7/2001 | | PASS |
|
|
|
Approved as noted and attached plan review conditions / requirements and manufacture's instruction for specific product use.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/7/2001 | | PASS |
|
|
|
To permit desk to issue.
|
Print Occupancy Form | | | 8/7/2001 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 8/7/2001 | | DONE |
|
|
|
|
Telephone call | | | 8/7/2001 | | DONE |
|
|
|
left message for John gave dollar amount
|
Plan assigned to (DRS) | 4/23/2001 | | 8/7/2001 | | PASS |
Dan Stuart
|
|
|
8/7/2001 07:16:03 DRS - activity updated through activity BLDA022 from case BLD01-01007.
|
Routing - FIRE | 8/2/2001 | 8/2/2001 | 8/6/2001 | | PASS |
|
|
|
Approved as noted and attached.
|
Routing - PLAN CHECK | 7/31/2001 | 7/31/2001 | 8/2/2001 | | PEND |
|
|
|
Received two complete sets of plans with required plan modifications and upgrade of all 8-1/2" x 11" addendums placed on full sheets were noted and cluded to reflect change. Plans reviewed and notes made on each copy for clarification. Ruuting to fire code analyst for re-review.
|
Plan resubmittals received | | | 7/31/2001 | | |
|
|
|
Received two new complete sets of plans with all required modifications and all of the latest addendum changes included.
|
Routing - PLAN CHECK | 7/6/2001 | 7/6/2001 | 7/24/2001 | | FAIL |
|
|
|
Resubmittals received are incomplete and to many changes on 8-1/2 x 11 sheets need to be transfered to full size sheets for proper review and use in the field. Have met with architects and they are to present new complete sets of plans for review and routing to fire.
|
Meeting | | | 7/24/2001 | | |
|
|
|
Met with Steve Simmons & Tom Brophy to review the plans and 7/6/01 response and to carefully review what the next submittals are to contain. Two new complete sets of plans with all correctiosn and addendums for all trades are to be provided.
|
Plan resubmittals requested | | | 7/24/2001 | | FAIL |
|
|
|
Met with Steve Simmons & Tom Brophy, LCA, to review the items still in need of correction. We revied the plans and response of 7/6/01 and had them note on a set of thier documenst the items needing corrected and all the small documents submitted as addendums and required that two full new sets of plans be presented with corrections made and all small document details for all work, electrical, mechanical, plumbing, structural, architectural be placed on full size sheets to reflect the work to be done in the field. I cannot forward the plans to fire code analsyst until the new sets of plans are presented.
|
Plan resubmittals received | | | 7/6/2001 | | DONE |
|
|
|
Plan resubmittals received from Lombard - Conrad Architects , plus small documents, forwarded same to Dan Stuart. 7/6/01 DAR
|
Routing - FIRE | 6/19/2001 | | 6/25/2001 | | FAIL |
|
|
|
Chem storage issues & ufc 51
|
Plan Review Completed(1st rev) | | | 6/25/2001 | | FAIL |
|
|
|
|
Meeting | | | 6/19/2001 | | |
|
|
|
Met with Steve Simmons, Tom Brophy & H.P Representative to review the plan review conditions required to be satisfactorily addressed before a per mit can be issued.
|
Plan resubmittals requested | | | 6/19/2001 | | FAIL |
|
|
|
Copies of plan review comments to Tom Brophy & Steve Simmons and review of comments & plans in PDS Meeting Rm. #1 for their benefit of clarification. They will attempt to have corrected plans back within the week. Routing to Fire Code analyst for review.
|
Routing - PLAN CHECK | 4/27/2001 | | 6/19/2001 | | FAIL |
|
|
|
Correction plan review comments faxed and hand delivered at meeting of 6/19/01 with Steve Simmons & Tom Brophy of LCA. Routing to fire dept.
|
Plan resubmittals requested | | | 6/14/2001 | | FAIL |
|
|
|
Partial plan review completed. Faxed copy of plan review conditions requiring a response to the architect for him to begin his response submital. Will continue review and fax and mail a copy of the finished complete review.
|
Plan resubmittals received | | | 6/11/2001 | | DONE |
|
|
|
Received plan resubmittals plus small documents from Lombard Conrad architects. Forwarded same to Dan Stuart. 6/11/01 DAR
|
Routing Off Site - STRUCTURAL | 4/20/2001 | | 5/11/2001 | | |
|
|
|
Contacted PDQ to take plans to outside eng. KMM 5/11/01 - lETTER FROM STRUCTYRAL REVIEWER, kEITH jONES, THAT STRUCTURAL WAS OKAY - NO FURTHER SUBMITTALS REQUIRED. 6/22/01 - COPY OF REPORT FAXED TO TOM BROPHY, ARCHITECT.
|
Routing - PLUMBING | 4/26/2001 | | 4/27/2001 | | PASS |
|
|
|
return air duct drains will be trapped prior to connection to I.W. sump
|
Routing - PUBLIC WORKS | 4/23/2001 | | 4/26/2001 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 4/20/2001 | | DONE |
|
|
|
I contacted Tim Bashford requesting a H occupancy questionaire. KMM
4/25/01 Received H Occupancy questionnaire. Routed to Dan S. KMM
|
Received Certificate of Value | | | 4/19/2001 | | DONE |
|
|
|
|
Application received | | | 4/19/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/19/2001 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 6/25/2001 | 6/25/2001 | | | |
|
|
|
6/25/01 - FAILED IN FIRE CODE ANALYSIS. PLAN RETURNED TO PLAN REVIEWER, D.STUART - BEHIND DESK WAITING FOR ARCHITECTS RESPONSE.
|