Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD01-01014
StatusFinaled
Name IDAHO ATHLETIC CLUB (PHASE II/III)
Site Address 2999 N LAKEHARBOR LN
Project NameIDAHO ATHLETIC CLUB-II & III
Customer Number 
ePlanReviewNo
Description
IDAHO ATHLETIC CLUB ADDITION (PHASES II & III) - TO CONSTRUCT THE FINAL TWO PHASES OF THE NEW IDAHO ATHLETIC CLUB. PHASE II IS A 11,700 SQ. FT., TWO STORY ADDITION AT THE WEST SIDE OF THE EXISTING PHASE I. THE FIRST FLOOR OF PHASE TWO IS A SHELL AND CORE FOR THE FUTURE POOL ROOM. THE SECOND FLOOR WILL BE FINISHED AS AN EXERCISE ROOM. FIRST FLOOR: 5,850 SQ. FT., SECOND FLOOR: 5,850 SQ. FT.. SEPARATE PERMITS WILL BE REQUIRED TO CONSTRUCT THE SWIMMING POOL AND SPA. A SEPARATE TENANT IMPROVEMENT PERMIT IS ALSO REQUIRED TO FINISH THE POOL ROOM OF OCCUPANCY. PHASE THREE IS A 10,370 SQ. FT., TWO STORY ADDITION AT THE EAST SIDE OF THE EXISTING PHASE I BUILDING. THE FIRST FLOOR IS A SHELL ONLY FOR FUTURE OFFICE AND RETAIL SPACE. THE SECOND FLOOR IS A SHELL ONLY FOR A FUTURE EXERCISE ROOM. FIRST FLOOR: 5,270 SQ. FT., SECOND FLOOR: 5,100 SQ. FT.. SEPARATE TENANT IMPROVEMENT PERMITS WILL BE REQUIRED TO FINISH THIS PHASE FOR OCCUPANCY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT FOR THE FIRST FLOOR OF PHASE TWO OR FOR PHASE THREE. BOTH PHASES ARE BEING CONSTRUCTED OF MASONRY EXTERIOR WALL, CONCRETE FLOORS AND STRUCTURAL ROOF FRAMING WITH METAL ROOF DECK. ALL PHASES OF THIS BUILDING ARE FULLY FIRE SPRINKLED. THE SPRINKLERS ARE BEING USED FOR ONE-HOUR SUBSTITUTION. DRH00-117/CUP00-00060/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  8/12/2010 DONE
Fee Review-notes4/20/20014/20/20011/29/2002 DONE
Letter of compliance  12/31/2001 DONE
Letter of Compliance #22093 issued 12-31-01.
BLD-Final12/21/200112/26/200112/26/2001APART
DetailsTony Young
###-####
ok for perm. occupancy after other trade inspectors are ok 12/26/2001 10:55:22 AM
BLD-Final11/30/200111/30/200111/30/2001 PART
DetailsTony Young
Ok for temp. occ.. Pool permit #bld01-03043 has been issued and approved for temp. occ. also. Ok for final when all agencies/fees approved.
Temporary occupancy  11/30/2001 DONE
#4670 issued 11/30/01 Ok for perm when fees are paid aml
Temporary occupancy  11/30/2001 PART
Temp. Occ. Cert. #4670 issued 11-3-01 to the Idaho Athletic Club addn.
BLD-Final11/16/200111/19/200111/19/2001APASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/16/2001 at 12:27:12. Contact: ###-####.
ok as long as others are ok 11/19/2001 10:26:20 AM
Print Occupancy Form  11/19/2001 DONE
BLD-Final11/15/200111/16/200111/16/2001AFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 11/15/2001 at 15:35:23. Contact: ###-####.
c/n posted 11/16/2001 12:24:35 PM
BLD-Final11/14/200111/15/200111/15/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 11/14/2001 at 08:42:48. Contact: ###-####.
FIRE-Final Inspection11/14/200111/15/200111/15/2001APASS
DetailsTroy Cobbley
OK for perm occ 11/16/2001 10:13:42 AM
Code Occupancy Approval11/13/200111/14/200111/14/2001AFAIL
DetailsTony Young
Scheduled by Inspector: MSG On 11/13/2001 3:01:16 PM 10:00 a.m. inspection per request from Kent-Petra Construction for final occupancy inspection (lndscpng, prkng lot, etc.)
called Carol M, said she will call Mike 11/14/2001 9:13:18 AM
Code Occupancy Approval11/13/200111/14/200111/14/2001APASS
DetailsMichael Garner
Scheduled by Inspector: MSG On 11/13/2001 3:01:16 PM 10:00 a.m. inspection per request from Kent-Petra Construction for final occupancy inspection (lndscpng, prkng lot, etc.)

I walked the property after reviewing approved changes on the plans. I signed the final for this property - case closed. 11/14/2001 3:27:10 PM
BLD-Energy code compliance11/12/200111/13/200111/13/2001PCANC
DetailsTony Young
Scheduled by a contractor via Hello! on 11/12/2001 at 09:18:16. Contact: ###-####.
BLD-Conference11/6/200111/6/200111/6/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/06/2001 at 09:42:19. Contact: ###-#### ,,,profit mtg 11/6/2001 2:27:59 PM
Plan resubmittals received  11/1/2001 DONE
Received two sets of resubmittal sheets P0.0, P1.0, and P1.1. Routed to Bob Archibald.
BLD-Concrete10/24/200110/25/200110/25/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/24/2001 at 14:51:01. Contact: ###-####.slab around pool area, si was there, pending rpt 10/25/2001 9:50:54 AM
BLD-Foundation10/10/200110/11/200110/11/2001ANR
DetailsTony Young
Scheduled by a contractor via Hello! on 10/10/2001 at 14:48:34. Contact: ###-####.due to rain 10/11/2001 10:00:32 AM
BLD-Foundation10/9/200110/10/200110/10/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/09/2001 at 11:45:30. Contact: ###-####.
BLD-Foundation10/9/200110/10/200110/10/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/09/2001 at 11:46:19. Contact: ###-####.
s. i. on site 10/10/2001 3:33:15 PM
BLD-Foundation10/8/200110/9/200110/9/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/08/2001 at 15:55:33. Contact: ###-####.
BLD-Foundation10/4/200110/8/200110/8/2001APART
DetailsTony Young
###-####
masonary, si on site 10/8/2001 11:07:20 AM
BLD-Concrete10/8/200110/8/200110/8/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/08/2001 at 09:08:49. Contact: ###-####.
si on site 10/9/2001 9:05:02 AM
BLD-Foundation10/4/200110/5/200110/5/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/04/2001 at 15:13:33. Contact: ###-####.
corrections on rebar, si on site to oversee fixes 10/5/2001 10:46:24 AM
BLD-Foundation10/3/200110/4/200110/4/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/03/2001 at 15:49:29. Contact: ###-####.
already done ,si on site 10/4/2001 3:38:08 PM
BLD-Foundation10/2/200110/3/200110/3/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/02/2001 at 16:00:12. Contact: ###-####.
already poured, si on site 10/3/2001 4:03:55 PM
BLD-Foundation10/2/200110/2/200110/2/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 10/02/2001 at 08:44:44. Contact: ###-####.
pending si report 10/2/2001 2:41:00 PM
BLD-Concrete8/29/20018/30/20018/30/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/29/2001 at 16:07:20. Contact: ###-####.already grouted, si was onsite, pending report 8/30/2001 3:19:05 PM
BLD-Foundation8/28/20018/29/20018/29/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/28/2001 at 13:24:30. Contact: ###-####.
not ready, si will be on site 8/29/2001 9:14:54 AM
BLD-Foundation8/28/20018/28/20018/28/2001PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 08/28/2001 at 07:46:13. Contact: ###-####....masonry, pend insp report. 8/28/2001 4:47:12 PM
BLD-Foundation8/23/20018/24/20018/24/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/23/2001 at 15:22:05. Contact: ###-####.pending si report 8/24/2001 11:55:31 AM
BLD-Other8/22/20018/23/20018/23/2001APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/22/2001 at 15:50:47. Contact: ###-####.grout, allready done, pending si report 8/23/2001 10:28:36 AM
Print Occupancy Form  8/23/2001 DONE
BLD-Conference8/17/20018/17/20018/17/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/17/2001 5:26:06 PM w/ Tony & contractor re finals
BLD-Foundation7/24/20017/24/20017/24/2001PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/24/2001 at 11:16:04. Contact: ###-####.
pending s. i. report 7/24/2001 3:46:26 PM
BLD-Foundation7/20/20017/20/20017/20/2001PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 07/20/2001 at 07:46:23. Contact: ###-####.west side of bldg 7/20/2001 3:45:06 PM
Issue PAID IN FULL permit  7/18/2001 DONE
Plan resubmittals received  7/18/2001 DONE
Received plan resubmittals from Cole and Associates three copies of sheet S3.1, forwarded same to John Menard. 7/18/01 DAR
Plan assigned to (JCM)4/23/2001 7/17/2001 PASS
DetailsJohn Menard
7/17/01 14:33:13 JCM - activity updated through activity BLDA022 from case BLD01-01014.
Routing - PLAN CHECK6/15/2001 7/17/2001 PASS
Plan resubmittals received  7/17/2001 DONE
Received two sets of plan resubmittals from Cole and Associates, sheet S3.1 forwarded same to John Menard. 7/17/01 DAR
PLANS/APPL TAKEN TO FRONT DESK  7/17/2001 PASS
Routing Off Site - STRUCTURAL7/16/2001 7/17/2001 PASS
Engineer of record faxed final revisions directly to the consulting structural engineer on 7/16/01. Received e-mail from consulting engineer approving final faxed calculations and details. 7/17/01 JCM
Inspection Record Card- Bld  7/17/2001 DONE
Print Occupancy Form  7/17/2001 DONE
Telephone call  7/17/2001 DONE
called ###-#### permit ready for pickup
Plan resubmittals received  7/16/2001  
Received faxed copy of revised structural calculations and details from Pinnacle. JCM
Meeting  7/13/2001  
Held a short meeting with Brian Smith, engineer of record, and Kent Soelberg, consulting engineer, to resolve a couple of outstanding items concerning the structural design. Those items where discussed and Mr. Smith indicated that he would make the requested revisions and fax copies directly to me and Mr. Soelberg for his review. JCM
Plan Reviewer's activity  7/5/2001  
Faxed the engineer of record's faxed response lettter to the consulting engineer for his review. JCM
Plan resubmittals received  7/2/2001  
Received a response letter faxed from the engineer of record. JCM
Plan resubmittals requested  6/26/2001  
Faxed the architect of record a copy of the comment list from the consulting structural engineer requesting additional revisions. JCM
Routing Off Site - STRUCTURAL6/12/2001 6/26/2001 FAIL
Resubmittals sent to consultanting Engineer via PDQ 6/12/01. 6/12/01 Received comment list from consulting structural engineer requesting additional revisions. JCM
Plan resubmittals received  6/15/2001 PASS
Received a letter from the architect of record indicating that mechanical equipment would comply with all applicable UBC and UMC requirements. JCM
Routing - PUBLIC WORKS6/15/2001 6/15/2001 PASS
Routing - PLAN CHECK6/13/2001 6/15/2001  
Plan Review Completed(1st rev)  6/13/2001 FAIL
Routing - FIRE6/11/2001 6/13/2001 PASS
Plan resubmittals received  6/12/2001 DONE
Received 3 sets of resubmittals from Cole and Associates plus small documents, forwarded same to John Menard. 6/12/01 DAR
Plan resubmittals requested  6/11/2001  
Mailed the architect of record a copy of the plan review comment list requesting revisions. JCM
Routing - PLAN CHECK6/7/2001 6/11/2001 FAIL
Routing - PLUMBING6/5/2001 6/7/2001 N/A
plumbing plans required - Received a revised certificate of value indicating that would be no plumbing work done under this permit. JCM
Routing - PLANNING5/22/2001 6/5/2001 PASS
Reroute plans to PW when back from P&Z. KMM
Approved per drh00-00117.
Plan resubmittals received  6/5/2001 DONE
Received five copies of revised sheets A1.0, L1.0, C1.0, C2.0, C3.0, C4.0, C5.0, C6.0, C7.0, C8.0, C9.0, C10.0. Put two copies of revised sheets with plans and gave back to Paul. Gave extra three copies to Brian M. KMM
Plan resubmittals requested  5/22/2001  
Faxed the architect of record a copy of the plan review comment list from the consulting structural engineer requesting revisions. JCM
Routing Off Site - STRUCTURAL4/23/2001 5/22/2001 FAIL
Contacted PDQ to take plans to outside eng. KMM
5/15/01 Routed resubmitted sheets A0.1 A2.0, A5.0, S0.1, S1.1, S2.1, S3.1, S3.2
Received a copy of the comment list from the consulting structural engineer requesting revisions. JCM




q
Routing - PUBLIC WORKS5/15/2001 5/22/2001 FAIL
Requires drainage plan per Brian Murphy, Site plan incomplete per April Miller. 5/22/01 DAR
Plans ACCEPTED BY PLAN TECH  5/15/2001 DONE
Received information from Matt Rheese that PW has new civil sheets. KMM
Plan routing begun/NEW & ADDTN  5/15/2001 DONE
Plan resubmittals received  5/15/2001 DONE
Received three copies of revised sheets A0.1, A2.0, A5.0, S0.1, S1.1, S2.1, S3.1, S3.2. Put two copies with plans and started routing. Sent one copy to outside eng. KMM
Plan routing begun/NEW & ADDTN  4/23/2001 DONE
started outside eng. Inhouse in hold box waiting for civil sheets that were used for the grading and drainage. bld00-02919
Plans ACCEPTED BY PLAN TECH  4/23/2001 HOLD
Requires
1. Matt stated at this time there is no plumb. or mech. for the shell and core.
2. Requires three additional civil sets. Two copies of the civil drawings that were submitted for the grading and drainage permitted under bld00-02919, to route with this phase II and III.
I will route to outside eng. but hold inhouse for civil drawings. Matt commented that revisions were being made to the site plan. I should have civils by 1 week. KMM
Plans in hold box
Received Certificate of Value  4/20/2001 DONE
Application received  4/20/2001  
Recd Pcfee & Taken To Pln CK  4/20/2001 DONE