Permit Information
Permit NumberBLD01-01032
StatusFinaled
Name BTS PROPERTIES L C
Site Address 550 N MILWAUKEE ST
Project NameRED LOBSTER
Customer Number 
ePlanReviewNo
Description
RED LOBSTER * To construct a 7,073 square foot, one story, type VN, fully fire sprinklered restaurant. All work is per approved plans and attachments, DRH 01-00046, PC#0341-01 (Grading Permit # is Bld99- 02411) FIRE SPRINKLERS USED FOR AREA
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes7/8/20037/8/20037/8/2003 DONE
Permanent Occupancy 11/30/200111/30/2001 DONE
Details
Fee Review-notes4/24/20014/24/200111/30/2001 DONE
called john keen left mesg lh
Permanent occupancy  11/30/2001 DONE
perm occ #8923 issued 11/30/01 to the Red Lobster aml
BLD-Final11/26/200111/27/200111/27/2001APART
DetailsRuss Owen
SHANE ###-#### . ok needs plumbing for perm oc. 11/27/2001 11:50:27 AM
Temporary occupancy  11/14/2001 PART
Temp. Occ. Cert. #4641 issued 11-14-01 to the Red Lobster.
BLD-Final11/7/200111/8/200111/8/2001APART
DetailsRuss Owen
###-####. Needs revised exterior exit system for out door dining , plan shows panic hardware at gates and also they have gated area constructed different from plans. Gates have been removed for temporary oc, also need dead bolt removed from office. Also has waitress booths in close prox to exit doors they were shown on fixture plans to be at present location ,main floor plan does no show them at all, contractor will be having new smaller one made. Ok for temporary oc only at this time. 11/8/2001 11:34:45 AM
Code Occupancy Approval  11/8/2001 PASS
FINAL SIGNED OFF, THERE IS STILL SMALL SIDEWALK WORK WITH LAND SCAPE NEED NO NORTH WEST CORNER BY DRIVEWAY
FIRE-Final Inspection11/7/200111/7/200111/7/2001PPASS
DetailsTroy Cobbley
Added by Inspector: 430 On 11/7/2001 3:07:58 PM Fire/life safety is finaled. OK for perm occ
Code Occupancy Approval  11/7/2001 FAIL
THERE IS A SMALL AMOUNT OF LANDSCAPE NOT COMPLETED AT DRIVEWAY TO NORTH DUE TO REPLACEMENT OF SIDEWALK, I SIGNED TEMP OCCUPANCY WITH NO BOND.
BLD-Final11/1/200111/1/200111/1/2001PNR
DetailsRuss Owen
###-####. needs all other signatures. 11/1/2001 4:12:14 PM
BLD-Framing/Rough-in10/25/200110/26/200110/26/2001APART
DetailsRuss Owen
CELLING GRID ###-#### SHANE Found 3 lights in kitchen with no slack wires, contractor not on site. no c/n posted.. 10/26/2001 9:50:14 AM
BLD-Framing/Rough-in10/23/200110/23/200110/23/2001PPASS
DetailsTom Arcoraci
###-#### shaft inspection shaft ok 10/23/2001 2:40:38 PM
BLD-Framing/Rough-in10/2/200110/2/200110/2/2001PPART
DetailsRuss Owen
###-#### 2 layer wrap on duct above grease hoods,still needs top of hood protection. 10/2/2001 3:41:36 PM
BLD-Energy code compliance9/19/20019/20/20019/20/2001APASS
DetailsTom Arcoraci
###-#### SHANE ok to cover walls 9/20/2001 9:21:25 AM
BLD-Energy code compliance9/17/20019/18/20019/18/2001APART
DetailsRuss Owen
###-#### SHANE ok to sheetrock kitchen/restrooms. front dining area ok subject to ele inspection. 9/18/2001 11:03:10 AM
BLD-Framing/Rough-in9/14/20019/17/20019/17/2001PPART
DetailsRuss Owen
###-#### SHANE only items left are a-35 at soffit and fire blocking c/n in office. 9/17/2001 2:03:02 PM
BLD-Framing/Rough-in9/13/20019/14/20019/14/2001PPART
DetailsRuss Owen
###-#### SHANE. rear kitchen and restroom areas only c/n posted. 9/14/2001 4:04:31 PM
BLD-Framing/Rough-in9/7/20019/10/20019/10/2001APART
DetailsTom Arcoraci
SHEER PANEL ###-#### SHANE
BLD-Framing/Rough-in9/6/20019/7/20019/7/2001AFAIL
DetailsRuss Owen
shear panel and a hd holddowns shane ###-####. hold -downs ok, shear nailing incomplete. recall. 9/7/2001 11:48:37 AM
BLD-Conference8/28/20018/29/20018/29/2001APART
DetailsRuss Owen
###-####. need details from engineer for rear wall connection to parapet,also still needs inspection of entire exterior shear questions only today. 8/29/2001 11:05:46 AM
BLD-Framing/Rough-in7/13/20017/16/20017/16/2001APASS
DetailsRuss Owen
Shane ###-####conduit removed and replaced with steel,also walls ok. 7/16/2001 12:23:26 PM
BLD-Foundation7/11/20017/12/20017/12/2001PPART
DetailsRuss Owen
Robert ###-####c/n posted for area with pvc eletrical condiut in footing, engineer has allowed steel schedual 40,will replace and recall. 7/13/2001 8:56:04 AM
BLD-Footing7/9/20017/10/20017/10/2001PFAIL
DetailsRuss Owen
ft insp robert- ###-#### c/n posted for electrical conduit in footing. 7/10/2001 4:37:10 PM
(F) Reprint permit  7/6/2001 DONE
Issue PAID IN FULL permit  7/5/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/26/2001 DONE
Inspection Record Card- Bld  6/26/2001 DONE
Inspection Record Card- Bld  6/26/2001 DONE
Print Occupancy Form  6/26/2001 DONE
Telephone call  6/26/2001 DONE
Plan assigned to (MLO)4/24/2001 6/26/2001 PASS
DetailsMike Otto
6/26/2001 11:19:21 MLO - activity updated through activity BLDA022 from case BLD01-01032.
Routing - PLAN CHECK6/25/2001 6/25/2001 PASS
Routing - PLANNING6/19/2001 6/25/2001 PASS
Approved per DRH01-46 and as noted on sheet L-1.
Routing Off Site - STRUCTURAL6/13/2001 6/20/2001 PASS
Sent resubs to structural engineer via PDQ.6/12/01 DAR
Routing - PLUMBING6/19/20016/19/20016/19/2001 PASS
all floor sinks and indirect waste receptors must be exposed and in full view, roof scuppers must be a max. of 2" above roof drains.
Routing - PLUMBING6/12/2001 6/18/2001 FAIL
all floor sinks and indirect waste receptors must be exposed and in full view, provide secondary roof drainage system.
Plan resubmittals received  6/5/2001  
Plan resubmittals received  6/5/2001  
Plan resubmittals received  6/5/2001 DONE
Received three sets of resubmittals from ajc architects plus small documents. Forwarded same to Mike Otto. 6/5/01 DAR
Routing - FIRE5/23/2001 5/29/2001 PASS
Plan Review Completed(1st rev)  5/29/2001 FAIL
Routing - PLAN CHECK5/15/2001 5/23/2001 FAIL
corrections faxed and mailed to architect
Routing Off Site - STRUCTURAL4/26/2001 5/23/2001 FAIL
Sent plans to consulting engineer via PDQ. 4/26/01 DAR corrections faxed and mailed to architect.
Plan resubmittals requested  5/23/2001 FAIL
UBC and structural corrections
Routing - PLUMBING5/11/2001 5/15/2001 FAIL
TOOK TO PLUMBING grease interceptor vent must be a min. of 3", all indirect waste receptors must be exposed, in full view, accessable, provide secondary roof drainage system, west boise sewer dist. must approve trash area drainage prior to plumbing approval. ###-####
Routing - PLANNING5/4/2001 5/11/2001 FAIL
Design Review conditions not met. There is also a pending Design Review appeal.
Routing - PUBLIC WORKS4/24/2001 5/4/2001 PASS
Plans ACCEPTED BY PLAN TECH  4/24/2001 DONE
Requested full set of plans for consulting structural engineer plus structual caculations and a project manual. 4/24/01 DAR
Application received  4/24/2001  
Recd Pcfee & Taken To Pln CK  4/24/2001 DONE