(QWEST-2ND FLR) To remodel a 3,600 sq.ft. area in the northeast corner of the second floor by converting existing office space and break room into a new expanded battery room and providing additional area for telephone equipment per approved plans on file. Work to include miscellaneous interior demolition work, new one-hour rated occupancy separation walls, new and relocated one-hour rated doors, interior finish, suspended ceiling work, a ramp installation, seismically braced racking for batteries, fire sprinkler work, alarm work, smoke detection, mechanical work including smoke/fire damper installations, plumbing work, and electrical work. This is a Scope of Work Permit. LETTER OF COMPLETION TO BE ISSUED WHEN DONE. NOTE: Per a 1992 Agreement, this building is fully fire sprinklered except in telephone equipment areas. A one-hour occupancy separation with protected openings is required between sprinklered and nonsprinklered areas and for battery rooms. (P.C.#0346-01) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes4/24/20014/24/200112/16/2002 DONE
Letter of compliance  11/5/2002 DONE
Letter of Compliance #22760 issued 11-1-02.
BLD-Final10/31/200210/31/200210/31/2002PPASS
DetailsCarl Dependahl
###-####...ok for final. 10/31/2002 1:51:25 PM
FIRE-Final Inspection10/28/200210/29/200210/29/2002PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection8/27/20028/28/20028/28/2002AFAIL
DetailsRick Jackson
Phone #: ###-#### need alarm plans submitted; verify through agreement with city (Dan Stuart has original agreement with FD and ATT) 8/28/2002 10:28:13 AM
FIRE-Final Inspection8/1/20028/1/20028/1/2002PFAIL
DetailsRick Jackson
Joe, ###-####
need alarm plans submitted; all other items completed; will need to test alarms for damper release 8/1/2002 4:24:35 PM
FIRE-Final Inspection4/17/20024/18/20024/18/2002AFAIL
DetailsRick Jackson
dick- ###-#### per rick at 8:30 labels on rated doors; access doors for smoke dampers; fire alarm plans needed; overhead door traps occupants inside when door is released by fusible links; need to test alarms; exit sign needed; penetrations in rated walls 4/18/2002 10:39:33 AM
BLD-Final4/17/20024/18/20024/18/2002ANR
DetailsTom Arcoraci
fn occ dick ###-####
BLD-Framing/Rough-in3/21/20023/22/20023/22/2002APART
DetailsCarl Dependahl
fr dick- ###-#### ; walls ok to cover 3/22/2002 12:13:07 PM
BLD-Aging Inspection1/7/20021/7/20021/7/2002 NR
DetailsCarl Dependahl
qwest, wip. 1/7/2002 4:59:43 PM
BLD-Aging Inspection11/5/200111/5/200111/5/2001 NR
DetailsCarl Dependahl
AT&T/ Qwest Bldg; wip. 11/5/2001 3:17:33 PM
BLD-Aging Inspection9/3/20019/3/20019/3/2001 NR
DetailsCarl Dependahl
WIP per contractor 9/4/2001 11:04:41 AM
BLD-Framing/Rough-in6/29/20017/2/20017/2/2001APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 06/29/2001 at 13:37:46. Contact: ###-####. ok to infill.wall....ele is on surface 7/2/2001 11:50:10 AM
Print Occupancy Form  6/29/2001 DONE
Inspection Record Card- Bld  6/29/2001 DONE
Telephone call  6/29/2001 DONE
called permit ready
Issue PAID IN FULL permit  6/29/2001 DONE
Routing - PLAN CHECK6/27/2001 6/28/2001 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  6/28/2001 PASS
Plan assigned to (JCB)6/4/2001 6/28/2001 PASS
DetailsJason Blais
6/28/2001 13:55:38 JCB - activity updated through activity BLDA022 from case BLD01-01044.
Routing - PLAN CHECK6/25/2001 6/27/2001 FAIL
One item still has not been adequately addressed from initial plan review report. Called architect and let him know. He said he would see what he could do.
Routing - FIRE6/26/20016/26/20016/26/2001 PASS
Plan resubmittals received  6/26/2001 DONE
Received two sets of plan resubmittals from Hutchison Smith Architects, sheets M2.0, M3.0, A-3 AND A-5, FORWARDED SAME TO Jason Blais. 6/26/01 DAR
Routing - FIRE6/20/2001 6/25/2001 FAIL
Routing - PLAN CHECK6/15/2001 6/20/2001 FAIL
Not all items were addressed or addressed adequately. Second plan review report sent and faxed to architect. Plan resubmittals and response required again. Plans routed to Fire Dept. again.
Plan resubmittals requested  6/20/2001  
Plan resubmittals required for review again.
Routing - FIRE6/13/2001 6/15/2001 FAIL
Routing - PLAN CHECK5/2/2001 6/13/2001 FAIL
Plan review report sent and faxed to architect. Plan resubmittals and response required for further review. Plans routed to Fire Dept. for review.
Plan resubmittals requested  6/13/2001  
Plan resubmittals and response required for further review.
Plan assigned to (DRS)4/30/2001 6/4/2001 DONE
DetailsDan Stuart
Reassigned to Jason Blais by M. Southard.
Routing - PUBLIC WORKS4/30/2001 5/2/2001 PASS
Plans ACCEPTED BY PLAN TECH  4/25/2001 DONE
Requested Architect/Engineer of record form. 4/25/01 DAR
Application received  4/24/2001  
Recd Pcfee & Taken To Pln CK  4/24/2001 DONE