Case Summary (BLD) | | | 2/16/2005 | | |
|
|
|
|
Case Summary (BLD) | | | 6/24/2003 | | |
|
|
|
|
Fee Review-notes | 4/25/2001 | 4/25/2001 | 4/15/2002 | | DONE |
|
|
|
|
Letter of compliance | | | 4/8/2002 | | DONE |
|
|
|
Letter of Compliance #22324 issued 4-8-02.
|
BLD-Final | 4/5/2002 | 4/5/2002 | 4/5/2002 | P | PASS |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 04/05/2002 at 09:52:26. Contact: ###-####.ok for perm oc, received letter from engineer and special inspection firm. all ok. 4/5/2002 5:45:30 PM
|
BLD-Final | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PART |
Russ Owen
|
|
|
###-#### JIM ok temp oc , need special inspection final letter. may be in office ? c/n posted.2 5:03:49 PM 4/3/2002 5:04:27 PM 4/3/2002 5:04:37 PM
|
FIRE-Final Inspection | 4/3/2002 | 4/3/2002 | 4/3/2002 | P | PASS |
Troy Cobbley
|
|
|
fire life safety finaled. fire sprinkler finaled
|
FIRE-Final Inspection | 3/28/2002 | 3/28/2002 | 3/28/2002 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 3/28/2002 5:21:37 PM need second phone line for alarm monitoring 3/28/2002 5:24:20 PM
|
BLD-Energy code compliance | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | CANC |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 17:10:20. Contact: ###-####.
|
FIRE-Final Inspection | 3/22/2002 | 3/25/2002 | 3/25/2002 | A | NR |
Troy Cobbley
|
|
|
There was no inspection. The contractor just wanted to know how many fire extinguishers he needed 3/25/2002 9:13:36 AM
|
BLD-Final | 3/22/2002 | 3/25/2002 | 3/25/2002 | P | NR |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 03/22/2002 at 17:12:25. Contact: ###-####.needs all signatures and s-i final letter. PM 3/25/2002 4:46:44 PM
|
BLD-Aging Inspection | 1/7/2002 | 1/7/2002 | 1/7/2002 | | PART |
Russ Owen
|
|
|
wip. 1/7/2002 5:57:41 PM
|
BLD-Concrete | 10/16/2001 | 10/17/2001 | 10/17/2001 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/16/2001 at 18:06:46. Contact: ###-####. rebar and concrete inspected using specal inspection 10/17/2001 10:32:17 AM
|
BLD-Concrete | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 10/11/2001 at 19:31:23. Contact: ###-####. Subject to s-i. 10/12/2001 12:19:51 PM
|
BLD-Footing | 9/25/2001 | 9/26/2001 | 9/26/2001 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 09/25/2001 at 13:39:00. Contact: ###-####. poured with out city inspection dont know if spec inspection was done no one for steed on site 9/26/2001 11:07:07 AM
|
BLD-Footing | 9/22/2001 | 9/24/2001 | 9/24/2001 | A | PART |
Russ Owen
|
|
|
Scheduled by a contractor via Hello! on 09/22/2001 at 09:42:07. Contact: ###-####. Special inspection will be performed. 9/24/2001 4:40:22 PM
|
(F) Reprint permit | | | 9/17/2001 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/14/2001 | | DONE |
|
|
|
|
Telephone call | | | 7/18/2001 | | DONE |
|
|
|
Told them they would have until October to pick up permit (180 days since they applied for permit)
|
Inspection Record Card- Bld | | | 6/22/2001 | | DONE |
|
|
|
|
Print Occupancy Form | | | 6/22/2001 | | DONE |
|
|
|
|
Telephone call | | | 6/22/2001 | | DONE |
|
|
|
LEFT MESS THAT PERMIT IS READY
|
Routing - PLANNING | 6/19/2001 | | 6/21/2001 | | PASS |
|
|
|
Approve per DRH00-105
|
Routing - PLAN CHECK | 6/21/2001 | | 6/21/2001 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2001 | | PASS |
|
|
|
|
Plan assigned to (JCM) | 4/26/2001 | | 6/21/2001 | | PASS |
John Menard
|
|
|
6/21/01 16:20:14 JCM - activity updated through activity BLDA022 from case BLD01-01054.
|
Routing - FIRE | 6/15/2001 | | 6/19/2001 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 6/19/2001 | | 6/19/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 5/23/2001 | | 6/15/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 6/15/2001 | | |
|
|
|
Inserted revised plan sheets A1.1 & L1.1 and routed to Fire. JCM
|
Plan resubmittals received | | | 6/14/2001 | | |
|
|
|
2 sets of a1.1 L1.1 routed to John M. KMM
|
Plan Review Completed(1st rev) | | | 5/23/2001 | | FAIL |
|
|
|
|
Routing - FIRE | 5/21/2001 | | 5/23/2001 | | FAIL |
|
|
|
ACCESS ISSUES; SIZE & TYPE OF SPRINKLER UNDERGROUND
|
Routing - PLAN CHECK | 5/14/2001 | | 5/21/2001 | | |
|
|
|
|
Plan Reviewer's activity | | | 5/21/2001 | | PASS |
|
|
|
Plans reviewed and approved as submitted with attached comment list. JCM
|
Routing - PLANNING | 5/2/2001 | | 5/14/2001 | | FAIL |
|
|
|
Approved under CUP01-00001 on 5/9/01 by DAA. Failed by TKW since the applicant needs to submit a phasing plan and show compliance with conditions of DRH00-105.
|
Routing Off Site - STRUCTURAL | 4/26/2001 | | 5/10/2001 | | PASS |
|
|
|
Contacted PDQ to take plans to outside eng. KMM Received a fax from the consulting structural engineer approving the structural plans as submitted. JCM
|
Routing - PUBLIC WORKS | 4/26/2001 | | 5/2/2001 | | PASS |
|
|
|
|
Plan resubmittals received | | | 4/30/2001 | | DONE |
|
|
|
Received six copies of revised C-1 & C-2. Put with plans. KMM
|
Plan routing begun/NEW & ADDTN | | | 4/26/2001 | | HOLD |
|
|
|
Requires stamped and signed Arch. sheets.
|
Plans ACCEPTED BY PLAN TECH | | | 4/26/2001 | | HOLD |
|
|
|
Requires 1. Stamped and signed Arch. sheets.
contacted Wes Steele of this need. He stated he would be in today to do so. KMM
|
Received Certificate of Value | | | 4/25/2001 | | DONE |
|
|
|
|
Application received | | | 4/25/2001 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 4/25/2001 | | DONE |
|
|
|
|