BLD-Final | 8/20/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/20/2001 at 14:55:41. Contact: ###-####. Tempered glass in place per code. C. of C. #21579 issued. 8/21/2001 8:51:16 AM
|
DOC - Permit Finaled | 8/21/2001 | 8/21/2001 | 8/21/2001 | A | PASS |
Steven Webb
|
|
|
Finaled by inspector at 8/21/2001 8:51:21 AM
|
BLD-Final | 8/16/2001 | 8/17/2001 | 8/17/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 08/16/2001 at 13:36:31. Contact: ###-####. c/n issued--tempered glass needed in two locations. 8/17/2001 9:05:16 AM
|
BLD-Energy code compliance | 6/20/2001 | 6/22/2001 | 6/22/2001 | A | FAIL |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/20/2001 at 16:37:01. Contact: ###-####. C/N posted on site 6/22/2001 8:34:52 AM
|
BLD-Energy code compliance | 6/22/2001 | 6/22/2001 | 6/22/2001 | P | PASS |
Steven Webb
|
|
|
Added by Inspector: 420 On 6/22/2001 2:29:09 PM ok to cover--energy report was submitted. 6/22/2001 2:29:45 PM
|
BLD-Framing/Rough-in | 6/19/2001 | 6/20/2001 | 6/20/2001 | A | PART |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 18:10:35. Contact: ###-####. C/N posted-ok to insulate. 6/20/2001 11:23:19 AM
|
BLD-Other | 6/13/2001 | 6/14/2001 | 6/14/2001 | A | PASS |
Steven Webb
|
|
|
Scheduled by a contractor via Hello! on 06/13/2001 at 12:00:02. Contact: ###-####. SHEAR-OK TO SIDE. 6/14/2001 10:24:10 AM
|
BLD-Other | 6/12/2001 | 6/13/2001 | 6/13/2001 | A | FAIL |
Steven Webb
|
|
|
C/N issued-missing floor to floor straps, nails needed above hd, nails not to penetrate surface of panes, etc. 6/13/2001 11:22:24 AM
|
BLD-Framing/Rough-in | 6/11/2001 | 6/12/2001 | 6/12/2001 | A | NR |
Steven Webb
|
|
|
shear wall ###-#### No approved plans or address on building. 6/12/2001 9:14:20 AM
|
BLD-Foundation | 5/22/2001 | 5/22/2001 | 5/22/2001 | P | PART |
Steven Webb
|
|
|
Jose ###-#### wip 5/22/2001 1:24:25 PM
|
Override - Parcel Holds | | | 5/22/2001 | | |
|
|
|
|
BLD-Footing | 5/18/2001 | 5/18/2001 | 5/18/2001 | P | PART |
Steven Webb
|
|
|
Wes ###-#### early as possible wip 5/18/2001 1:04:33 PM
|
Override - Parcel Holds | | | 5/18/2001 | | |
|
|
|
|
Override - Parcel Holds | | | 5/9/2001 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/9/2001 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 5/9/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 5/8/2001 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/8/2001 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 5/8/2001 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/8/2001 | | DONE |
|
|
|
|
Telephone call | | | 5/8/2001 | | DONE |
|
|
|
left mess that permit is ready
|
Plan assigned to (SAM) | 5/4/2001 | | 5/8/2001 | | PASS |
Steve Munroe
|
|
|
5/8/2001 13:46:00 SAM - activity updated through activity BLDA022 from case BLD01-01060.
|
Override - Parcel Holds | | | 5/4/2001 | | |
|
|
|
|
Case Summary (BLD) | | | 5/4/2001 | | |
|
|
|
|
Plan Review Report | | | 5/4/2001 | | |
|
|
|
|
Pending Assignment by DJO | 4/25/2001 | | 5/4/2001 | | DONE |
Dan Overy
|
|
|
5/4/2001 13:22:44 SAM - activity updated through activity BLDA183 from case BLD01-01060.
|
Plan Reviewer's activity | | | 5/4/2001 | | PEND |
|
|
|
5/4/01 I called and taled to the designer, Tim, and Reberta from Tahoe. Tim will get me new engineering and fax a foundation plan with changes. Plan review has stoped till I recieve the information requested.
|
Routing - PLANNING | 4/25/2001 | 4/25/2001 | 4/30/2001 | | PASS |
|
|
|
FRONT SETBACK MAY INCLUDE SIDEWALK. DEVELOPER IS WORKING ON A CONDITIONAL USE MOD.
|
Routing - PUBLIC WORKS | 4/25/2001 | 4/25/2001 | 4/30/2001 | | PASS |
|
|
|
|
Application received | | | 4/25/2001 | | |
|
|
|
|
Routing - PLAN CHECK | 4/30/2001 | 4/30/2001 | | | PEND |
|
|
|
|