Description
PLAN TYPE # 3-B * TO CONSTRUCT A NEW 1,472 SQ.FT. THREE BEDROOM, TWO AND ONE HALF BATH, TWO STORY, SINGLE FAMILY HOME WITH A 484 SQ.FT. DETACHED GARAGE. THE SECOND FLOOR IS 736 SQ.FT AND THE FIRST FLOOR IS 736 SQ.FT. AND A 132 SQ.FT COVERED FRONT ENTRY PORCH. ALL WORK PER THE APPROVED PLANS AND ATTACHED CONDITION LIST. MJP P.C. # 296
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/10/200112/11/200112/11/2001APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/10/2001 at 17:34:03. Contact: ###-####. c.c # 22021 issued 12/11/2001 9:27:28 AM
DOC - Permit Finaled12/11/200112/11/200112/11/2001APASS
DetailsDave Hannah
Finaled by inspector at 12/11/2001 9:27:30 AM
BLD-Wall cover9/28/20019/28/20019/28/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/28/2001 at 07:15:53. Contact: ###-####.
BLD-Energy code compliance9/28/20019/28/20019/28/2001PPASS
DetailsJim Storey
###-#### RANDY
BLD-Framing/Rough-in9/26/20019/26/20019/26/2001PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 09/26/2001 at 10:27:24. Contact: ###-####.
CHANGE STATUS TO (ISS)  9/26/2001 DONE
per Mike P. ok to change to issue
Plan assigned to (M_P)8/17/2001 9/26/2001 DONE
DetailsMike Phillips
For addition and remodel.
Override - Parcel Holds  8/20/2001  
Routing - PLANNING8/17/2001 8/17/2001 PASS
BLD-Framing/Rough-in7/10/20017/10/20017/10/2001PPART
DetailsJim Storey
fr insp randy ###-####
BLD-Foundation5/22/20015/23/20015/23/2001ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 05/22/2001 at 17:27:35. Contact: ###-####.
BLD-Foundation5/23/20015/23/20015/23/2001PPASS
DetailsJim Storey
Chris ###-####
BLD-Footing5/21/20015/22/20015/22/2001APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 05/21/2001 at 13:44:38. Contact: ###-####.
Plan Reviewer's activity  5/18/2001 PASS
Switched floor plans on this lot.
PLANS/APPL TAKEN TO FRONT DESK  5/18/2001 DONE
Floor plans changed.
Inspection Record Card- Bld  5/18/2001 DONE
PLANS/APPL TAKEN TO FRONT DESK  5/18/2001 DONE
Routing - PLANNING5/16/20015/16/20015/16/2001 PASS
Approved as per CUP99-00022, plan was previously located on Lot 7, Block 3
Issue PAID IN FULL permit  5/11/2001 DONE
CHANGE ISSUED DATE  5/11/2001 DONE
Routing - PLAN CHECK5/4/20015/4/20015/7/2001 DONE
Plan Reviewer's activity  5/7/2001 PASS
PLANS/APPL TAKEN TO FRONT DESK  5/7/2001 DONE
Telephone call  5/7/2001 DONE
called Gorman Tutt builders permit ready for pickup
Inspection Record Card- Bld  5/7/2001 DONE
Plan assigned to (M_P)4/30/2001 5/7/2001 PASS
DetailsMike Phillips
5/7/2001 13:59:01 M_P - activity updated through activity BLDA022 from case BLD01-01105.
Routing - PUBLIC WORKS4/30/2001 5/4/2001 PASS
Routing - PLANNING4/30/2001 5/3/2001 PASS
As per CUP99-00022.
Application received  4/30/2001