Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD01-01145
StatusFinaled
Name STATEWIDE CONSTRUCTION
Site Address 5011 E SAGEWOOD DR
Project NameFLOOD PLAIN
Customer Number 
ePlanReviewNo
Description
To construct a 2764 sq. ft. two story single family dwelling (1770 sq. ft. first floor/994 sq. ft. second floor) with a attached 806 sq. ft. three car garage and a 132 sq. ft. covered front porch. Per approved plans, engineering and requirement list. This is a solar and shade restricted lot. CUP98-0116 per Roger Jones. THIS LOT IS WITHIN THE FLOODPLAIN AREA. A ELEVATION CERTIFICATE IS REQUIRED BEFORE CALLING FOR A ROUGH FRAMING INSPECTION. JIM WYLLIE HAS RELEASED THE NON-BUILD IF CONSTRUCTED IN ACCORDANCE TO THE INFORMATION SUPPLIED BY QUADRANT. PC#332 (SAM)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/15/200111/15/200111/15/2001PPASS
DetailsSteven Webb
###-#### BRIAN C. OF O. #20 11/15/2001 3:22:58 PM C. of O. #20639 issued. 11/15/2001 3:23:40 PM
DOC - Permit Finaled11/15/200111/15/200111/15/2001PPASS
DetailsSteven Webb
Finaled by inspector at 11/15/2001 3:23:47 PM
BLD-Final11/14/200111/14/200111/14/2001PCANC
DetailsSteven Webb
###-#### BRIAN Cancelled by contractor via telephone. 11/14/2001 12:40:23 PM
BLD-Final11/13/200111/13/200111/13/2001PFAIL
DetailsSteven Webb
###-#### brian c/n issued--need electrical final and tempered glass (2) in formal dinning room. 11/13/2001 4:28:36 PM
BLD-Aging Inspection11/5/200111/5/200111/5/2001 PART
DetailsSteven Webb
wip 11/5/2001 8:23:55 AM
BLD-Aging Inspection9/3/20019/3/20019/3/2001 PART
DetailsSteven Webb
wip 9/4/2001 8:14:36 AM
BLD-Framing/Rough-in7/2/20017/3/20017/3/2001APASS
DetailsDave Hannah
Brian ###-####
BLD-Framing/Rough-in6/28/20016/28/20016/28/2001PPART
DetailsSteven Webb
###-#### C/N posted-need truss package and missing post up in crawl marked on plans pageA-1.0--ok to insulate. 6/28/2001 1:07:51 PM
BLD-Framing/Rough-in6/6/20016/7/20016/7/2001APASS
DetailsDave Hannah
shear insp Brian ###-#### ext shear ok to cover second level front bedroom wall will be sheared on inside 6/7/2001 10:14:54 AM
Case Summary (BLD)  5/30/2001  
BLD-Foundation5/18/20015/18/20015/18/2001PPART
DetailsSteven Webb
Jim ###-####w 5/18/2001 11:35:22 AM wip 5/18/2001 11:35:39 AM
Override - Parcel Holds  5/18/2001  
BLD-Footing5/17/20015/17/20015/17/2001PPART
DetailsSteven Webb
dirk ###-#### as late as possible wip--setbacks corrected from prior inspection 5/17/2001 3:13:33 PM
BLD-Footing5/16/20015/17/20015/17/2001AFAIL
DetailsSteven Webb
###-####\\ ok per Jim W. Setbacks not per plans 5/17/2001 12:29:45 PM
Telephone call  5/17/2001 DONE
left mess that permit is ready
Override - Parcel Holds  5/17/2001  
Issue PAID IN FULL permit  5/17/2001 DONE
Override - Parcel Holds  5/17/2001  
PLANS/APPL TAKEN TO FRONT DESK  5/16/2001 DONE
Override - Parcel Holds  5/16/2001  
Inspection Record Card- Bld  5/16/2001 DONE
Plan assigned to (SAM)5/15/2001 5/16/2001 PASS
DetailsSteve Munroe
5/16/2001 15:25:15 SAM - activity updated through activity BLDA022 from case BLD01-01145.
Case Summary (BLD)  5/16/2001  
Plan Review Report  5/16/2001  
Plan Reviewer's activity  5/16/2001 PEND
5/16/01 Plan review is done. Waiting for Jim Wyllie to release flood plain.
Override - Parcel Holds  5/16/2001  
Override - Parcel Holds  5/16/2001  
Pending Assignment by DJO5/2/2001 5/15/2001 DONE
DetailsDan Overy
5/15/2001 11:31:02 SAM - activity updated through activity BLDA183 from case BLD01-01145.
Routing - PLANNING5/2/20015/2/20015/7/2001 PASS
Routing - PUBLIC WORKS5/2/20015/2/20015/7/2001 PASS
Application received  5/2/2001  
Routing - PLAN CHECK5/7/20015/7/2001  PEND